Assessment Task
As part of the Company Quality strategy periodic review of the construction industry is to be undertaken. You are required to select medium rise building project. This includes commercial and wide span buildings with reference to classes 2 and 3 to a maximum of 3 storeys, and Classes 4 to 9 to a maximum of 3 storeys, not including Type A construction.
Please have a look at current version of NCC Volume 1 for more details on building classifications.
You have been tasked with undertaking a review of the following construction practices and procedures:
Section -1
Using Estimate One website select a project that meets the criteria specified above.
In your answers in PART A please highlight what is relevant to selected project.
PART A
You will be required to prepare your response in a professional report format.
Environmental management procedures to ensure compliance with regulatory requirements
Acts covered by the environment protection authority.
Recent changes to the implementation of the Environmental Protection Act.
Nature and style of building and construction industry contracts
List three Australian standard contracts
Provide a description of the application and suitability of the contracts nominated in 2a.
Provide a flowchart of the contracts nominated in 2a
WHS/OHS framework and Stakeholders obligations under
Federal,
Legislation
Regulations
Victoria
Legislation
Regulations
Project quality management processes and procedures as they apply to the building and construction industry
Determine quality requirements
Implement quality assurance processes
Implement project quality improvements
Relevant licensing arrangements
Victorian Building Authority, building practitioner registration
Victorian building authority, plumbing registration
Energy safe Victoria, electrical licences
Work safe Victoria, high risk work licences
Asbestos removal licencing requirements
Explain Building Industry Regulatory Framework from either VBA or ABCB web site
State and territory specifics
Structure and purpose of NCC (BCA, PCA) and how it is imposed on all states and territories
NCC referenced documents (mandatory standards)
Building Industry Codes of practice. Why and how do we use them in construction
Workplace safety requirements.
Recent changes (Victorian Workplace manslaughter legislation)
Site communication to comply with organisational quality management requirements
Paths of communications stipulated in the contract (include communication flowchart)
Emails
Face-to-face verbal communication
Websites
Web conferencing
Mobile and fixed telephone contact
Site diaries
Site meetings
Agenda and minutes templates with date and time and relevant personnel notification
Contract requirements
Client meetings
Contractor meetings
Safety meetings
Toolbox meetings
SECTION-2
Following a selection process, your organisation has been selected as the principal contractor, and it has been tasked with the responsibility of providing a report on the building and construction planning practices for the team project selected in section 1 from estimateone website.
Your report is required to include the details for managing supply of materials and onsite operations for selected project as stated below but not be restricted only to them:
Manage supply of materials and installation of equipment
Using the specifications for selected project in assessment task 1 discuss the following:
Discuss the process for placing orders for materials (for example concrete and preformed concrete)
Timelines, cost and quality
Explain role of the superintendent
Installation of equipment including:
Electrical Cabling
Fire suspension systems
Lifting equipment
Plumbing and gas piping systems
Raw construction materials such as sand, aggregate, timber and cement
Sarking, insulation, air conditioning, ducting and roofing
Temporary lighting and power outlets
Waste water disposal systems
On site operations must include
Allocation and management of human resources
Communication with regulatory authorities and compliance with their requirements
Dispersal and programming of heavy equipment, including wheeled and tracked earthmoving vehicles
Stakeholders disputes resolution
Maintenance of environmental controls and obligations
Management of expenditure
Placing orders for suppliers or equipment
Management of subcontractor operations to ensure compliance with company obligations
Contractual obligations
Quality
Cost
Time
Establish and manage system to deal with problems and delays affecting performance
Establish process to manage industrial relations in accordance with company policy and regulatory guidelines
Project schedules revisions are made when required and variations are documented to comply with quality management procedures
l. Project quality management implementation to provide for:
Continues improvement on environment
Safety procedures are monitored continuedly
Reports analysis and procedure review as required
Contact with statutory authorities and parties to the contract are facilitated when variations are made to:
Approved contract
Drawings
Specifications
Multi-site management plans
Explain how you manage performance of staff on multiple projects, ensuring quality outcomes.
Complexity
Issues arising from complexity and projects team structure
Effective communication between sites
Problem Solving
Knowledge of construction management methodologies and practices
Progress claims
Methods of payment
Contract
Authorisation
Project expenditure
Claims
Scheduled Projected Costs
Accuracy.
Assessment Task-2
You have been tasked with analysing provided OHS/WHS Management System for Laurel Apartments project and developing OHS/WHS Management System (OHSMS/WHSMS) you selected from Estimate One web site in Assessment Task 1.
NOTES:
OHS/WHS Management System is the same as OHS/WHS Management Plan (OHSMS=OHSMP and WHSMS=WHSMP)
OHSMS/WHSMS is site specific and cannot be used across multiple sites
You will be required to prepare a report to cover Part A & Part B requirements for analysing existing and developing new OHSMS/WHSMS.
Part A
Analyse provided OHSMS or your building site and write a report on your findings. Learner/Students who do not or did not have exposure to building sites to use OHSMS - Laurel Apartments (Pirossi Developments) V1 which can be found in the Learner/Student Resource/Contents/ DI Doco folder). Learner/Students who work on building sites should use OHSMS for building site they currently working on or worked on in the past.
Part B:
Now that you have an idea on OHS/WHS Management System, develop your own set of OHS/WHS set of policy and procedures to became part of your OHSMS/WHSMS for a project selected from Estimate One in Assessment Task 1 to ensure you have covered your legal obligations under OHS/WHS legislation.
After examining the documentation from the project, you have selected from Estimate One you are required to cover following in your OHS/WHS Management System for this project.
OHS/WHS Management System should include:
Project Description
Site Description contact details and emergency details
Site Plan
OHS Co-ordination plan obtain free download from Worksafe Victoria
Organisational Requirements for on-site first aid facilities in accordance with OHS, welfare and risk management legislation and regulations including:
Adherence to organisational policy and procedures for:
Duty of care
Hazard Identification and rectification
Safe work practices
Compliance with federal and state/territory legislation and regulation
Rehabilitation of injured workers
Plant and equipment policy and procedure to comply with
Contractual obligations
Licensing/certification
Risk management
Hazard management
Identification
Documentation
Reporting
Planning
Accountability
Emergency response
Safe handling of materials policy and procedures
Manual handling
Hazardous materials
Material safety data sheets
Safety Induction Procedures
for serious incidents including near misses
for injuries
for accidents
Safety reporting processes and documentation are developed to satisfy
Contractual obligations
Work Safe Victoria (WSV)/Safe Work Australia (SWA) requirements
Safe work method statements (SWMS)
Need for review and continues improvement