RIICWD507D Prepare detailed geotechnical design

00Student Pack

RIICWD507D Prepare detailed geotechnical design

Student Pack

What is the purpose of this document?

The Student Pack is the document you, the student, needs to complete to demonstrate competency. This document includes the context and conditions of your assessment, the tasks to be completed by you and an outline of the evidence to be gathered.

The information includes the following:

Information related to the unit of competency

Guidelines and instructions to complete each task and activity

A student evaluation form

Student Evaluation Form

These documents are designed after conducting thorough industry consultation. Students are encouraged to evaluate this document and provide constructive feedback to their training organisation if they feel that this document can be improved.

Link to other unit documents

The Student Pack is a document for students to complete to demonstrate their competency. This document includes context and conditions of assessment, tasks to be administered to the student, and an outline of the evidence to be gathered from the student.

The Unit Mapping is a document that contains information and comprehensive mapping with the training package requirements. The Unit Requirements is a document that contains information related to the unit of competency for the Training Organisation staff and students.

Document Usage

CAQA Resources

https://caqaresources.com.au/

Student Pack 2023 CAQA Resources, CAQA and RTO Training Resources

This template and all its including associated content is a copyrighted work under Australian and other copyright laws. Do not submit copies or modifications of this template to any website or any third parties. Please review the following license agreement to learn how you may or may not use this template.

License Agreement:

Copyright protects this material. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher to use for a specific intended purpose. The only exception is brief quotations embodied in critical reviews and certain other noncommercial uses permitted by Copyright Act 1968 (Cth). For permission requests, write to the publisher, addressed Attention: Permissions Coordinator, at the address below.

If you believe that information of any kind in this publication is an infringement of copyright, in the material in which you either own the copyright or are authorised to exercise the rights of a copyright owner, and then please advise us by contacting CAQA, Career Calling International Pty. Ltd. 2/10 Lawn Court, Craigieburn, Victoria 3064.

Student and trainer details

Student details

Full name: Student ID: Contact number: Email address: Trainer details

Full name: Qualification and unit of competency

Qualification/Course/Program Details

Code: Name: Unit of competency

Code: RIICWD507D

Name: Prepare detailed geotechnical design

Releases: 2.0

Release date: 07/Dec/2014

Assessment Submission Method

By hand to trainer/assessor By email to trainer/assessor

Online submission via Learning Management System (LMS)

Any other method _________________________________________________

(Please describe here)

Student declaration

I have read and understood the information in the Unit Requirements prior to commencing this Student Pack

I certify that the work submitted for this assessment pack is my own. I have clearly referenced any sources used in my submission. I understand that a false declaration is a form of malpractice;

I have kept a copy of this Student Pack and all relevant notes, attachments, and reference material that I used in the production of this Student Pack;

For the purposes of assessment, I give the trainer/assessor permission to:

Reproduce this assessment and provide a copy to another member of staff; and

Take steps to authenticate the assessment, including communicating a copy of this assessment to a plagiarism checking service (which may retain a copy of the assessment on its database for future plagiarism checking).

Student signature: ________________________________

Date: ____/_____/______________

Assessment Plan

The student must be assessed as satisfactory in each of the following assessment methods in order to demonstrate competence in a variety of ways.

Evidence number/ Task number Assessment method/ Type of evidence/ Task name Sufficient evidence recorded/Outcome

Assessment task 1 Knowledge Test (KT) S / NS (First Attempt)

S / NS (Second Attempt)

Assessment task 2 Skill Test (ST) S / NS (First Attempt)

S / NS (Second Attempt)

Assessment task 3 Skills Test (ST) S / NS (First Attempt)

S / NS (Second Attempt)

Outcome C NYC

Date assessed:

Trainer signature:

Completion of the Assessment Plan

Your trainer is required to fill out the Assessment Plan Outcome records above, when:

You have completed and submitted all the requirements for the assessment tasks for this cluster or unit of competency.

Your work has been reviewed and assessed by your trainer/assessor.

You have been assessed as either satisfactory or unsatisfactory for each assessment task within the unit of competency.

You have been provided with relevant and detailed feedback.

Every assessment has a Feedback to Student section used to record the following information. Your trainer/assessor must also ensure that all sections are filled in appropriately, such as:

Result of Assessment (satisfactory or unsatisfactory)

Student name, signature and date

Assessor name, signature and date

Relevant and detailed feedback

Unit Requirements

You, the student, must read and understand all of the information in the Unit Requirements before completing the Student Pack. If you have any questions regarding the information, see your trainer/assessor for further information and clarification.

Pre-Assessment Checklist: Task 1 - Knowledge Test

The purpose of this checklist

The pre-assessment checklist helps students determine if they are ready for assessment. The trainer/assessor must review the checklist with the student before the student attempts the assessment task. If any items of the checklist are incomplete or not clear to the student, the trainer/assessor must provide relevant information to the student to ensure they understand the requirements of the assessment task. The student must ensure they are ready for the assessment task before undertaking it.

Section 1: Information for Students

Make sure you have completed the necessary prior learning before attempting this assessment.

Make sure your trainer/assessor clearly explained the assessment process and tasks to be completed.

Make sure you understand what evidence is required to be collected and how.

Make sure you know your rights and the Complaints and Appeal process.

Make sure you discuss any special needs or reasonable adjustments to be considered during the assessment (refer to the Reasonable Adjustments Strategy Matrix - Appendix A and negotiate these with your trainer/assessor).

Make sure that you have access to a computer and the internet (if you prefer to type the answers).

Make sure that you have all the required resources needed to complete this assessment task.

The due date of this assessment task is in accordance with your timetable.

In exceptional (compelling and compassionate) circumstances, an extension to submit an assessment can be granted by the trainer/assessor. Evidence of the compelling and compassionate circumstances must be provided together with your request for an extension to submit your assessment work.

The request for an extension to submit your assessment work must be made before the due date.

Section 2: Reasonable adjustments

I confirm that I have reviewed the Reasonable Adjustments guidelines and criteria as provided in Appendix A and attached relevant evidence as required and select the correct checkbox.

I do require reasonable adjustment

I do not require reasonable adjustment

Declaration (Student to complete)

I confirm that the purpose and procedure of this assessment task has been clearly explained to me.

I confirm that I have been consulted about any special needs I might have in relation to the assessment process.

I confirm that the criteria used for this assessment has been discussed with me, as have the consequences and possible outcomes of this assessment.

I confirm I have accessed and understand the assessment information as provided in the Training Organisations Student Handbook.

I confirm I have been given fair notice of the date, time, venue and/or other arrangements for this assessment.

I confirm that I am ready for assessment.

Student Name: ______________________________________

Student Signature: ___________________________________

Assessment method-based instructions and guidelines: Knowledge Test

Assessment type

Written Questions

Instructions provided to the student:

Assessment task description:

This is the first (1) assessment task you must successfully complete to be deemed competent in this unit of competency.

The Knowledge Test is comprised of eight (8) written questions

You must respond to all questions and submit them to your Trainer/Assessor.

You must answer all questions to the required level, e.g. provide an answer within the required word limit, to be deemed satisfactory in this task

You will receive your feedback within two (2) weeks, and you will be notified by your Trainer/Assessor when your results are available.

Applicable conditions:

All knowledge tests are untimed and are conducted as open book assessment (this means you can refer to your textbook during the test).

You must read and respond to all questions.

You may handwrite/use a computer to answer the questions.

You must complete the task independently.

No marks or grades are allocated for this assessment task. The outcome of the task will be Satisfactory or Not Satisfactory.

As you complete this assessment task, you are predominately demonstrating your written skills and knowledge to your trainer/assessor.

Resubmissions and reattempts:

Where a students answers are deemed not satisfactory after the first attempt, a resubmission attempt will be allowed.

The student may speak to their trainer/assessor if they have any difficulty in completing this task and require reasonable adjustments.

For more information, please refer to the Training Organisations Student Handbook.

Location:

This assessment task may be completed in:

a classroom

learning management system (i.e. Moodle),

workplace,

or an independent learning environment.

Your trainer/assessor will provide you with further information regarding the location for completing this assessment task.

Instructions for answering the written questions:

Complete a written assessment consisting of a series of questions.

You will be required to answer all the questions correctly.

Do not start answering questions without understanding what is required. Read the questions carefully and critically analyse them for a few seconds; this will help you to identify what information is needed in the answer.

Your answers must demonstrate an understanding and application of the relevant concepts and critical thinking.

Be concise, to the point and write answers within the word-limit given to each question. Do not provide irrelevant information. Remember, quantity is not quality.

You must write your responses in your own words.

Use non-discriminatory language. The language used should not devalue, demean, or exclude individuals or groups based on attributes such as gender, disability, culture, race, religion, sexual preference or age. Gender-inclusive language should be used.

When you quote, paraphrase, summarise or copy information from other sources to write your answers or research your work, always acknowledge the source.

Purpose of the assessment

This assessment task is designed to evaluate students knowledge essential to prepare detailed design of busways in a range of contexts and industry settings and knowledge regarding the following:

Knowledge of the legislation required to prepare detailed design of busways

Knowledge of the policies, procedures and documentation required to prepare detailed design of busways, including those relating to:

Australian and other relevant Standards

cultural and heritage management

design approvals and reviews

environmental management

geotechnical management

hydrological and meteorological management

performance reviews

quality management

risk assessment and management

statutory compliance

surveying

system close outs

work health and safety

workplace recording and reporting

Knowledge of the types, characteristics, technical capabilities and limitations of materials, plant and equipment required for busway design and construction

Knowledge of the principles and techniques for preparing detailed design of busways, including:

techniques for evaluating potential site hazards, constraints and conditions

techniques for identifying and evaluating design options

data analysis techniques, including calculating:

areas

volumes

densities

mass

percentages

grades

size of components for busways

geometric requirements for busways

surfacing requirements for busways

principles of road user behaviourcost estimation techniques

requirements of a design plan

design review and validation techniques

performance review techniques

techniques for using software and technology to present designs

techniques for advising on design implementation

Knowledge of the principles and techniques for leading and coordinating teams.

Task instructions

This is an individual assessment.

To ensure your responses are satisfactory, consult a range of learning resources and other information such as handouts, textbooks, learner resources etc.

To be assessed as Satisfactory in this assessment task, all questions must be answered correctly.

Assessment Task 1: Knowledge Test

Provide your response to each question in the box below.

Q1: Answer the following questions:

1.1. Explain the key processes for risk assessment and management in preparing the detailed geotechnical designs using 100-150 words.

1.2. Explain the workplace safety health and safety responsibilities of employee using 50-100 words.

1.3. Discuss the key environmental management requirements to consider when preparing detailed geotechnical design using 100-150 words.

1.4. Discuss the key cultural and heritage requirements to consider when preparing detailed geotechnical design using 100-150 words.

1.5. What are the key considerations for quality management in preparing the detailed geotechnical design? Write your answer using 80-100 words.

1.6. Discuss two (2) Australian and two (2) International Standards related detailed design geotechnical design. Write your answer using 150-200 words.

1.7. Explain the key aspects of industry and organisational design that should be considered when preparing detailed geotechnical design using 150-200 words.

1.8. Discuss the current industry best practices related to site investigation and risk assessment and management that should be followed when preparing detailed geotechnical designs using 100-150 words.

1.9. When should you implement the following geotechnical work options? Write your answer using 80-110 words.

Shallow Foundations

Deep Foundations

Ground Improvement Techniques

1.10. Discuss any three (3) geometric considerations that should be factored into the geotechnical design process using 100-150 words.

1.11. Discuss the following key aspects of geotechnical works related to surfacing using 100-150 words.

Subgrade Preparation

Pavement Design

1.12. Explain workplace recording and reporting procedures and documentation using 100-150 words.

1.13. Explain the key steps for design approvals and records filing in the geotechnical design process using 50-70 words.

1.14. Explain the purpose of performance reviews in the geotechnical designs in 50-100 words.

1.15. What is the importance of system close outs? Write your answer in 50-100 words.

Satisfactory response

Yes No Q2: Discuss two (2) potential hazards, two (2) constraints and two (2) conditions that could impact the project's safety, constructability, and performance using 100-150 words.

Satisfactory response

Yes No Q3: Discuss the techniques for choosing preferred options to undertake the detailed design of geotechnical works using 200-250 words.

Satisfactory response

Yes No Q4: Discuss three (3) team leadership techniques that can be employed during the geotechnical design process using 100-150 words.

Satisfactory response

Yes No Q5: Discuss the following operational techniques that can be employed during the geotechnical design process using 100-150 words.

Project planning and management

Quality Assurance and Quality Control (QA/QC)

Data management and documentation Satisfactory response

Yes No Q6: Discuss the capabilities of different plant and equipment used for geotechnical works mentioned in the table using 1-2 sentences each.

Drilling rigs Dynamic compaction equipment Bored piling equipment Standard Penetration Test (SPT) equipment Satisfactory response

Yes No Q7: Explain the following commonly used cost estimation techniques in geotechnical design using 100-150 words.

Unit cost estimating

Analogous estimating

Satisfactory response

Yes No Q8: Discuss the key principles of design review using 150-200 words.

Satisfactory response

Yes No

Assessment Results Sheet

Outcome First attempt:

Outcome (make sure to tick the correct checkbox):

Satisfactory (S) or Not Satisfactory (NS) Date: _______(day)/ _______(month)/ _______(year)

Feedback:

Second attempt:

Outcome (please make sure to tick the correct checkbox):

Satisfactory (S) or Not Satisfactory (NS) Date: _______(day)/ _______(month)/ _______(year)

Feedback:

Student Declaration I declare that the answers I have provided are my own work. Where I have accessed information from other sources, I have provided references and/or links to my sources.

I have kept a copy of all relevant notes and reference material that I used as part of my submission.

I have provided references for all sources where the information is not my own. I understand the consequences of falsifying documentation and plagiarism. I understand how the assessment is structured. I accept that the work I submit may be subject to verification to establish that it is my own.

I understand that if I disagree with the assessment outcome, I can appeal the assessment process, and either re-submit additional evidence undertake gap training and or have my submission re-assessed.

All appeal options have been explained to me.

Student Signature Date Trainer/Assessor Name Trainer/Assessor Declaration I hold:

Vocational competencies at least to the level being delivered

Current relevant industry skills

Current knowledge and skills in VET, and undertake

Ongoing professional development in VET

I declare that I have conducted an assessment of this students submission. The assessment tasks were deemed current, sufficient, valid and reliable. I declare that I have conducted a fair, valid, reliable, and flexible assessment. I have provided feedback to the student.

Trainer/Assessor Signature Date Office Use Only The outcome of this assessment has been entered into the Student Management System

on _________________ (insert date)

by (insert Name) __________________________________

Pre-Assessment Checklist: Task 2 Skills Test (ST)

The purpose of this checklist

The pre-assessment checklist helps students determine if they are ready for assessment. The trainer/assessor must review the checklist with the student before the student attempts the assessment task. If any items of the checklist are incomplete or not clear to the student, the trainer/assessor must provide relevant information to the student to ensure they understand the requirements of the assessment task. The student must ensure they are ready for the assessment task before undertaking it.

Section 1: Information for Students

Make sure you have completed the necessary prior learning before attempting this assessment.

Make sure your trainer/assessor clearly explained the assessment process and tasks to be completed.

Make sure you understand what evidence is required to be collected and how.

Make sure you know your rights and the Complaints and Appeal process.

Make sure you discuss any special needs or reasonable adjustments to be considered during the assessment (refer to the Reasonable Adjustments Strategy Matrix and negotiate these with your trainer/assessor).

Make sure that you have access to a computer and the internet (if you prefer to type the answers).

Make sure that you have all the required resources needed to complete this Assessment Task (AT).

The due date of this assessment task is in accordance with your timetable.

In exceptional (compelling and compassionate) circumstances, an extension to submit an assessment can be granted by the trainer/assessor. Evidence of the compelling and compassionate circumstances must be provided together with your request for an extension to submit your assessment work.

The request for an extension to submit your assessment work must be made before the due date.

Section 2: Reasonable adjustments

I confirm that I have reviewed the Reasonable Adjustments guidelines and criteria as provided in Appendix A and attached relevant evidence as required and select the correct checkbox.

I do require reasonable adjustment

I do not require reasonable adjustment

Declaration (Student to complete)

I confirm that the purpose and procedures of this assessment task has been clearly explained to me.

I confirm that I have been consulted about any special needs I might have in relation to the assessment process.

I confirm that the criteria used for this assessment has been discussed with me, as have the consequences and possible outcomes of this assessment.

I confirm I have accessed and understand the assessment information as provided in the Training Organisations Student Handbook.

I confirm I have been given fair notice of the date, time, venue and/or other arrangements for this assessment.

I confirm that I am ready for assessment.

Student Name: ______________________________________

Student Signature: ___________________________________

Assessment method-based instructions and guidelines: Skills Test Assessment type

Skill Test - Prepare detailed geotechnical designs

Instructions provided to the student:

Assessment task description:

This is the second (2) assessment task you must successfully complete to be deemed competent in this unit of competency.

This assessment task is a Skills Test.

This assessment task consists of four (4) practical demonstration activities.

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

You will receive your feedback within two (2) weeks, and you will be notified by your trainer/assessor when your results are available.

You must attempt all activities of the project for your trainer/assessor to assess your competence in this assessment task.

Applicable conditions:

This skill test is untimed and is conducted as an open book assessment (this means you are able to refer to your textbook or other learner materials during the test).

You will be assessed independently on this assessment task.

No marks or grades are allocated for this assessment task. The outcome of the task will be Satisfactory or Not Satisfactory.

As you complete this assessment task, you are predominately demonstrating your skills, techniques and knowledge to your trainer/assessor.

Your trainer/assessor may ask you relevant questions during this assessment task

Resubmissions and reattempts:

Where a students answers are deemed not satisfactory after the first attempt, a resubmission attempt will be allowed.

The student may speak to their trainer/assessor if they have any difficulty in completing this task and require reasonable adjustments.

For more information, please refer to the Training Organisations Student Handbook.

Location:

This assessment task may be completed in:

a classroom

learning management system (i.e. Moodle),

workplace,

or an independent learning environment.

Your Trainer/Assessor will provide you with further information regarding the location for completing this assessment task.

Purpose of the assessment

The purpose of this assessment task is to assess the students knowledge and skills essential to prepare detailed geotechnical designs in a range of contexts and industry settings.

Skills to locate and applies relevant legislation, documentation, policies and procedures

Skills to implement the requirements, procedures and techniques for the safe, effective and efficient completion of detailed geotechnical works design including:

accessing and interpreting plans, drawings, specifications and design briefs

accessing and interpreting Australian and other appropriate standards

accessing and interpreting engineering survey and geotechnical information

accessing and interpreting hydrological, meteorological, cultural and heritage data

accessing and interpreting geotechnical works construction materials test results

accessing and interpreting geotechnical works selection data

applying computer aided drafting design (CADD) and drafting technology

applying engineering graphical presentation techniques

Skills to work effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to coordinate work activities

providing clarification and advice to those applying the design

Skills to demonstrate completion of detailed geotechnical designs that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

calculate areas, volumes, densities, mass, percentages and grades

maintain design and cost records

determine geotechnical works loadings

select geotechnical works options

size geotechnical works components

select and applying appropriate construction techniques

develop and applying design plans

interpret and analysing data to recommend options

complete a detailed design of geotechnical works

prepare a cost estimate

participate in the review of the design

obtain design approval

complete and submitting design costs

review application and recommending changes.

Task instructions

This is an individual assessment.

This assessment task requires the student to prepare detailed geotechnical designs in Civil construction.

The student is required to complete the following four (4) activities in this assessment task:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

The trainer/assessor (Supervisor) will induct you to the worksite.

You will be required to complete all parts of this assessment task.

The templates for each activity are provided along with this assessment task.

The student must comply with the written and verbal reporting requirements and procedures.

The student must follow the instructions of the trainer/assessor (Supervisor).

The trainer/assessor must assess the performance of the student as per the performance checklist provided.

Assessment Task 2: Skills Test Skills Test:

This assessment task requires the student to prepare detailed designs of geotechnical works, including evaluating design options, preparing, and finalising designs and advising on design implementation. This includes:

Locating and applying relevant legislation, documentation, policies and procedures.

Implementing the requirements, procedures and techniques for the safe, effective and efficient completion of detailed geotechnical works design.

Working effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes:

Demonstrating completion of detailed geotechnical designs that safely, effectively and efficiently meets all of the required outcomes.

To do so, you will be required to complete the following activities:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

Instructions for trainer/assessor:

The trainer/assessor must include access to designs for geotechnical works.

The trainer/assessor must arrange a worksite for the student to carry out the specified projects.

The workplace must be:

An actual workplace

A close simulation of the workplace environment provided that simulated or project-based assessment techniques replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Note: The requirements for a simulated workplace environment are given below.

The Supervisor or trainer/assessor must ensure that the simulated workplace environment requirements.

The role of the Supervisor (trainer/assessor) is to allocate the tasks, activities and responsibilities that you will be required to undertake to complete these assessments.

The worksite must meet the requirements given in the Simulated workplace environment requirements section given below.

The trainer will supervise/observe the work by standing near the working location and evaluate your performance based on performance checklist benchmarks.

The trainer/assessor must use realistic tasks or simulated tasks, relevant specifications and work instructions, standard work practices, safety requirements and environmental constraints present on the worksite.

The trainer/assessor must mark the students responses to verbal questions on the verbal questions record sheet included in the students assessment pack.

The trainer/assessor must provide a verbal briefing on each assessment prior to commencement.

Instructions for the student:

The student will be required to bring all necessary PPEs required to complete this activity.

The student must follow the instructions provided by the Supervisor.

The student must complete the activities specified.

Workplace requirements

The trainer/assessor or training organisation must provide a workplace or a close simulation of the workplace environment to replicate construction workplace conditions and standards, materials, activities, responsibilities, procedures, safety requirements and environmental considerations to each student.

The training organisation will take you to the location of the construction worksite.

Further, the training organisation must ensure the construction site must meet the requirements given in the table below.

The training organisation must ensure that the civil construction site provides the student with the opportunity to prepare detailed designs of geotechnical works in civil construction, including evaluating design options, preparing and finalising designs and advising on design implementation. The training organisation must assign a supervisor to each student or take on the role of Supervisor. The worksite must have realistic tasks or simulated tasks, relevant specifications and work instructions, standard work practices, safety requirements and environmental constraints. The site and its surroundings are accessible and clear of hazards, so far as reasonably practicable. The site must have realistic workplace conditions, standards, materials, activities, responsibilities, procedures, safety requirements, and environmental considerations. An experienced employee can provide adequate guidance and supervision to less experienced employees. The students have the clothing and footwear required. In addition, the clothing and footwear are in good condition and suitable for the task.

Simulated workplace scenario:

You are working as a design technician in a civil construction company.

You have been assigned to prepare detailed designs of geotechnical works in civil construction, including evaluating design options, preparing, and finalising designs and advising on design implementation.

Example of the task include preparing a detailed geotechnical design for slope stabilization to ensure the safety of the road and adhere to Australian and other appropriate standards.

While preparing detailed designs of geotechnical works in civil construction, you will be required to:

Access and interpret plans, drawings, specifications, and design briefs.

Review the project plans, design briefs, and specifications to understand the alignment and profile of the proposed road.

Examine the drawings to identify critical sections with slope stability concerns.

Access and interpret Australian and other appropriate standards.

Research and review relevant Australian standards, such as AS 4678 (Earth Retaining Structures) and AS 3798 (Guidelines on Earthworks for Commercial and Residential Developments).

Consult additional international guidelines or standards applicable to slope stability analysis and design, if required.

Access and interpret engineering survey and geotechnical information.

Collect and analyse site-specific geotechnical data, such as soil and rock profiles, groundwater levels, and soil properties from borehole logs and in-situ tests.

Review any previous geotechnical investigation reports and slope stability analyses conducted in the area.

Access and interpret hydrological, meteorological, cultural, and heritage data.

Obtain data on local rainfall patterns, surface water flows, and drainage conditions to understand their impact on slope stability.

Review any available cultural and heritage information to ensure that the proposed design does not negatively impact any significant sites.

Access and interpret geotechnical works construction materials test results.

Review laboratory test results for the collected soil and rock samples to determine their engineering properties, such as shear strength, compressibility, and permeability.

Access and interpret geotechnical works selection data.

Evaluate and compare different slope stabilization techniques, such as retaining walls, soil nails, ground anchors, and geosynthetics, based on their suitability for the site conditions and project requirements.

Apply computer aided drafting design (CADD) and drafting technology.

Use CADD software to prepare detailed design drawings of the proposed slope stabilization measures, including plan views, cross-sections, and details of reinforcement and drainage systems.

Apply engineering graphical presentation techniques.

Create clear and concise visualisations, such as graphs, charts, and tables, to present the results of the slope stability analysis and design, including factors of safety, deformation estimates, and comparisons of alternative solutions.

The organisation will provide you with access to the following documents:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

When preparing geotechnical designs, you must:

Calculate areas, volumes, densities, mass, percentages, and grades

Calculate the areas and volumes of the cut and fill sections, as well as the required quantities of construction materials (e.g., soil, rock, concrete, geosynthetics).

Determine the mass and densities of the materials to be used in the design.

Calculate the slope angles, grades, and any required reinforcement spacing or lengths.

Maintain design and cost records.

Document all design calculations, assumptions, and decisions throughout the process, ensuring that they are traceable and easily understandable.

Keep track of cost estimates and budget considerations for each design option.

Determine geotechnical works loadings.

Identify and quantify the loadings that the slope stabilization measures must resist, such as dead loads, live loads, and hydrostatic pressures.

Consider potential seismic and wind loads, if applicable.

Select geotechnical works options.

Based on the site conditions, project requirements, and comparative analysis, select the most suitable slope stabilization technique(s).

Size geotechnical works components

Determine the dimensions and specifications for the selected slope stabilization components, such as retaining wall thickness, soil nail lengths and spacing, or ground anchor depths and capacities.

Select and apply appropriate construction techniques.

Identify the most suitable construction methods and techniques for implementing the chosen slope stabilization measures, taking into account site access, equipment requirements, and environmental considerations.

Develop and apply design plans.

Prepare detailed design plans for the slope stabilization, including construction drawings, specifications, and bill of materials.

Interpret and analyse data to recommend options.

Evaluate the design options by analysing the data collected and the calculations performed. Recommend the most viable option based on factors such as cost, constructability, and long-term performance.

Complete a detailed design of geotechnical works

Finalise the design, ensuring that all calculations, assumptions, and specifications are clearly documented and adhere to the relevant standards and guidelines.

Prepare a cost estimate.

Prepare a detailed cost estimate for the selected slope stabilization measures, including material, labor, and equipment costs, as well as any contingencies.

Participate in the review of the design.

Present the design to peers, supervisors, or other stakeholders for review and feedback. Address any concerns or suggestions and revise the design as necessary.

Obtain design approval.

Submit the final design to the appropriate authorities or client for approval, ensuring that all required documentation is included.

Complete and submit design costs.

Finalize and submit the cost estimate for the approved design, clearly documenting all associated costs and contingencies.

Review application and recommend changes

Monitor the construction process and review the application of the design in the field. Recommend any changes or modifications necessary to address unforeseen site conditions or other issues that may arise during construction.

Instructions for the trainer/assessor:

The trainer/assessor must assign a supervisor to each student.

The role of the Supervisor is to allocate the tasks, activities, and responsibilities that you will be required to undertake to complete this assessment task.

The Supervisor will supervise/observe the work by standing near the working location, evaluate the student demonstrating the required skills and complete an observation report based on the observation and students ability to focus on consistent performance and problem recognition and solving.

The person completing the observation report must have a direct, relevant, current relationship with the person being assessed and who is in a position to form a judgement on workplace performance relevant to the unit of competency.

Instructions for the student:

The student must follow the instructions provided by the Supervisor.

The student must complete the activities specified.

The student must clarify the operation and task requirements through verbal briefing with supervisor.

The student must follow organisational procedures, industry standards, equipment specifications, regulations, codes of practice and operations manuals during completion of the assessment activities.

Roles and responsibilities (Supervisor):

The Supervisor must:

Ensure that the student is clear about the job specifications.

Assign a supervisor or supervise the student performing each activity.

Observe the student performing each activity and assess them against the observation checklist provided after each activity.

Job responsibilities:

As part of your job role, you will have the following responsibilities:

Gather, interpret, clarify, and confirm work specifications.

Access, interpret, and apply documentation required for detailed geotechnical works designs, as well as ensure that work activity is compliant.

Create a design plan based on the resourcing and design requirements.

Gather, interpret, and analyse required data, and identify geotechnical works design options based on job requirements.

Interpret and analyse geotechnical works design options and recommend design options based on job requirements.

Create and complete detailed geotechnical works designs in accordance with job specifications.

Create a cost estimate for implementing the geotechnical works design.

Take part in the review of geotechnical works design with the necessary stakeholders.

Complete required documentation for geotechnical works design in accordance with workplace requirements.

Communicate and coordinate with design personnel in accordance with workplace requirements and within the scope of one's own role.

Obtain design approval from the appropriate authorities.

Ensure that design records are filed in accordance with workplace requirements.

Complete the design cost and reporting requirements and deliver them to the appropriate stakeholders.

Participate in design process performance review in accordance with workplace requirements.

Examine client feedback and contribute to design verification in accordance with workplace specifications.

Close out systems in accordance with workplace requirements.

As needed, provide clarification and advice to personnel implementing design to meet job requirements.

Examine design implementation and make changes as needed to meet job requirements.

As needed to meet job requirements, contribute to the design validation process.

Task:

This assessment task requires the student to prepare detailed designs of geotechnical works, including evaluating design options, preparing, and finalising designs and advising on design implementation. This includes:

Locating and applying relevant legislation, documentation, policies and procedures.

Implementing the requirements, procedures, and techniques for the safe, effective and efficient completion of detailed geotechnical works design.

Working effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes:

Demonstrating completion of detailed geotechnical designs that safely, effectively, and efficiently meets all of the required outcomes.

To do so, you will be required to complete the following activities:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

Activity 1: Plan detailed design of geotechnical works

This activity requires you to plan the detailed design of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 1 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 1: Plan detailed design of geotechnical works

Steps Tick mark once completed.

Step 1: Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant.

Access the following road design documentation:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

Interpret and analyse the following data and record using Template 1.

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Consult with the Supervisor and team members and ensure the work activity is compliant.

Step 2: Obtain, read, interpret, clarify, and confirm work requirements.

Consult your supervisor and obtain work requirements for the design of geotechnical works.

Read the work requirements.

Consult relevant authorities and interpret work requirements.

Clarify and confirm project work requirements and information with relevant authorities.

Step 3: Identify and confirm the geotechnical works project requirements and information. Step 4: Prepare a design plan using Template 2, which makes the best use of the available resources and meets the design requirements. Include the following information in the design plan:

Human resource requirements

Design hardware and software

Coordination requirements

Scheduling

Review requirements

Design process communication and reporting requirements.

Sign off:

Date:

Template 1: Geotechnical works design information

Geotechnical works design information

Areas

Volumes

Mass

Percentages

Grades

Geotechnical works loadings

Size of components for geotechnical works

Template 2: Design plan

Design plan

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design plan

Worker signature:

Human resource requirements

(50-100 words)

Students must document human resource requirements based on the site geotechnical works requirements and the job's complexity.

Design hardware and software

(50-100 words)

Coordination requirements

(50-100 words)

Scheduling

Review requirements

(50-100 words)

Design process communication and reporting requirements

(50-100 words)

Sign off:

Date:

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment of the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Obtain, interpret, clarify and confirm work requirements?

Access, interpret and apply documentation required for detailed geotechnical works designs and confirm work activity is compliant?

Identify and confirm the geotechnical works project requirements and information?

Prepare design plan according to resourcing and design requirements?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 1

This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Accessed, interpreted and applied geotechnical works design documentation and ensure the work activity is compliant.

Accessed the following documentation:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

Interpreted and analysed the following data.

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Consulted with the Supervisor and team members and ensure the work activity was compliant.

Obtained, read, interpreted, clarified and confirm work requirements.

Consulted with Supervisor and obtained work requirements for the design of geotechnical works.

Read the work requirements.

Consulted relevant authorities and interpreted work requirements.

Clarified and confirmed project work requirements and information with relevant authorities.

Identified and confirmed the geotechnical works project requirements and information. Prepared a design plan which makes the best use of the available resources and meets the design requirements. Include the following information in the design plan:

Human resource requirements

Design hardware and software

Coordination requirements

Scheduling

Review requirements

Design process communication and reporting requirements.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 2: Prepare detailed designs of geotechnical works.

This activity requires you to prepare a detailed design of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 2 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 2: Plan and prepare for the detailed design of geotechnical works.

Steps Tick mark, once completed

Step 1: Gather, interpret, and analyse required data and identify geotechnical design options based on job requirements.

Calculate and analyse the following aspects of the design for geotechnical works:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Analyse the design options for geotechnical works.

Further, based on the above-given analysis of data, you are then required to prepare a report using Template 3 to the management that includes the following:

Two (2) viable options for the design of geotechnical works.

Provide a recommendation on the preferred option and provide a reason for the selection of the preferred option.

Step 2: Complete the detailed design of the geotechnical works using computer-aided drafting design (CADD) and drafting technology.

Access computer-aided drafting design (CADD) technology such as AutoCAD to complete the design of geotechnical works.

Take into consideration the data analysed and recommendations provided in Step 1.

Submit the finalised design to your supervisor. Step 3: Prepare a cost estimate for executing the designed geotechnical works using Template 4. Include the following information:

Fixed costs: This includes the cost of purchasing equipment, material and plants.

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration.

Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed.

The construction cost of geotechnical works. Step 4: Participate in the review of the design of geotechnical works with the required stakeholders.

Step 5: Carry out a risk assessment of the following:

the existing conditions

the application of the design

maintainability of the completed works

Determine three (3) risks, calculate their risk rating and determine risk controls for each risk identified.

Step 6: Complete a design report for the design of the geotechnical works based on the outcomes of Step 1 Step 5 using Template 4. Include the following information:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Step 7: Communicate and coordinate with personnel involved in the design process according to workplace requirements and within the scope of their role.

Conduct regular meetings to measure the progress of each workgroup involved in the design process.

Submit the meeting minutes to the trainer/assessor.

Step 8: Gain design approval from a higher authority.

Submit the design approved to the trainer/assessor.

Sign off:

Date:

Template 3: Analysis report

Analysis report

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Analysis report

Worker signature:

Two (2) viable options for the design of geotechnical works.

Provide a recommendation on the preferred option and provide a reason for the selection of the preferred option.

(200-300 words)

Template 4: Cost report

Cost report

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Cost report

Worker signature:

Fixed costs: This includes the cost of purchasing equipment, material and plants

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed The construction cost of geotechnical works:

Total costs

Template 5: Design report

Design report (500-600 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design report

Worker signature:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Obtain, interpret and analyse required data and identify design options for geotechnical works according to job requirements?

Interpret and analyse design options for geotechnical works and recommend design option according to job requirements?

Develop and complete the detailed design of geotechnical works according to job requirements?

Prepare cost estimate for implementing the design of geotechnical works?

Participate in review of design of geotechnical works with required stakeholders?

Complete required documentation for design of geotechnical works according to workplace requirements?

Communicate and coordinate with personnel involved in design process according to workplace requirements and within scope of own role?

Gain design approval from required authorities?

Calculate resourcing requirements and performs mathematical calculations?

Present information and provide assistance using sector-specific vocabulary?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 2 This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Gathered, interpreted, and analysed required data and identify geotechnical design options based on job requirements.

Calculated and analysed the following aspects of the design for geotechnical works:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Analysed the design options for geotechnical works by:

Applying strength of materials and statics principles

Analysing geotechnical works and design footings

Sizing components for geotechnical works

Completed the detailed design of the geotechnical works using computer-aided drafting design (CADD) and drafting technology.

Accessed computer-aided drafting design (CADD) technology such as AutoCAD to complete the design of geotechnical works.

Took into consideration the data analysed and recommendations provided in Step 1.

Submitted the finalised design to your supervisor. Prepared a cost estimate for executing the designed geotechnical works. Included the following information:

Fixed costs: This includes the cost of purchasing equipment, material and plants.

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration.

Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed.

The construction cost of geotechnical works. Participated in review of the design of geotechnical works with required stakeholders.

Carried out a risk assessment of the following:

the existing conditions

the application of the design

maintainability of the completed works

Determined three (3) risks, calculated their risk rating and determined risk controls for each risk identified.

Completed a design report for the design of the urban road based on the outcomes of Steps 1 Step 5. Included the following information:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Outcomes of risk assessment, including:

Risks identified.

Risk likelihood, consequence and rating

Risk controls

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Communicated and coordinated with personnel involved in the design process according to workplace requirements and within the scope of their own role.

Conducted regular meetings to measure the progress of each workgroup involved in the design process.

Submitted the meeting minutes to the trainer/assessor.

Gained design approval from a higher authority.

Submitted the design approved to the trainer/assessor.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 3: Finalise design processes for geotechnical works

This activity requires you to finalise the design processes of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 3 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 3: Finalise design processes of geotechnical works

Steps Tick mark once completed

Step 1: Confirm design records are filed according to workplace requirements.

Further:

Submit the filed design records to the trainer/assessor.

Step 2: Complete and submit design cost and other reporting.

Submit cost and other reporting to the trainer/assessor.

Step 3: Participate in a performance review of the design process according to workplace requirements.

Determine the effectiveness of design processes implemented and document using Template 6.

Recommend any changes required to the Supervisor and gather feedback and document using Template 6.

Step 4: Seek client feedback and contribute to verifying the design.

Consult clients and seek feedback on design.

Verify the design and make any recommended changes.

Submit the revised design if any changes are made.

Step 5: Close out systems according to workplace requirements. Sign off:

Date:

Template 6: Finalise design processes of geotechnical works

Finalise design processes of geotechnical works (100-150 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Finalise design processes of geotechnical works

Worker signature:

Effectiveness of design processes implemented

Recommendations for changes

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment of the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Confirm design records are filed according to workplace requirements?

Complete design cost and reporting requirements and deliver to required stakeholders?

Participate in performance review of design process according to workplace requirements?

Review client feedback and contribute to design verification according to workplace requirements?

Close out systems according to workplace requirements?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 3 This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Ensured the filing of design records is completed.

Further:

Submitted the filed design records to the trainer/assessor.

Completed and submitted design costs and other reporting.

Submit cost and other reporting to the trainer/assessor.

Participated in a performance review of the design process with the Supervisor.

Determined the effectiveness of design processes implemented.

Recommended any changes required to the Supervisor and gathered feedback.

Sought client feedback and contributed to the verification of the design.

Consulted clients and sought feedback on design.

Verified design and made any recommended changes.

Submitted the revised design if any changes are made.

Closed out all systems.

Further, document the procedures implemented to close out all systems.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 4: Support and review design implementation of geotechnical works

This activity requires you to support and review the design implementation of geotechnical works

To complete this activity, you are required to:

Complete the steps given in the Checklist 4 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 4: Support and review design implementation of geotechnical works

Steps Tick mark once completed

Step 1: Provide clarification and advice to personnel implementing design as required to meet job requirements.

Instructions:

Provide clarification and advice on the flowing to the personnel or authorities applying the design. Discuss and clarify the following with them:

Design characteristics

Key areas of consideration

Outcomes of design reports

Step 2: Validate designs.

Evaluate the design implementation and recommend changes as required to meet job requirements.

Further, record the following based on design validation using Template 7.

Assessment of design implementation

Recommended changes

Sign off:

Date:

Template 7: Design validation

Design validation (150-200 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design validation

Worker signature:

Assessment of design implementation

Recommended changes

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Provide clarification and advice to personnel implementing design as required to meet job requirements?

Review design implementation and recommend changes as required to meet job requirements?

Contribute to design validation process as required to meet job requirements?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 4

This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Provided clarification and advice to those applying the design.

Instructions:

Provided clarification and advice on the flowing to the personnel or authorities applying the design. Discussed and clarified the following with them:

Design characteristics

Key areas of consideration

Outcomes of design reports

Validated designs.

Evaluated the application of the design and recommend changes for continuous improvement.

Further, record the following based on design validation.

Assessment of design implementation

Recommended changes

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Pre-Assessment Checklist: Task 3 Skills Test

The purpose of this checklist

The pre-assessment checklist helps students determine if they are ready for assessment. The trainer/assessor must review the checklist with the student before the student attempts the assessment task. If any items of the checklist are incomplete or not clear to the student, the trainer/assessor must provide relevant information to the student to ensure they understand the requirements of the assessment task. The student must ensure they are ready for the assessment task before undertaking it.

Section 1: Information for Students

Make sure you have completed the necessary prior learning before attempting this assessment.

Make sure your trainer/assessor clearly explained the assessment process and tasks to be completed.

Make sure you understand what evidence is required to be collected and how.

Make sure you know your rights and the Complaints and Appeal process.

Make sure you discuss any special needs or reasonable adjustments to be considered during the assessment (refer to the Reasonable Adjustments Strategy Matrix and negotiate these with your trainer/assessor).

Make sure that you have access to a computer and the internet (if you prefer to type the answers).

Make sure that you have all the required resources needed to complete this Assessment Task (AT).

The due date of this assessment task is in accordance with your timetable.

In exceptional (compelling and compassionate) circumstances, an extension to submit an assessment can be granted by the trainer/assessor. Evidence of the compelling and compassionate circumstances must be provided together with your request for an extension to submit your assessment work.

The request for an extension to submit your assessment work must be made before the due date.

Section 2: Reasonable adjustments

I confirm that I have reviewed the Reasonable Adjustments guidelines and criteria as provided in Appendix A and attached relevant evidence as required and select the correct checkbox.

I do require reasonable adjustment

I do not require reasonable adjustment

Declaration (Student to complete)

I confirm that the purpose and procedures of this assessment task has been clearly explained to me.

I confirm that I have been consulted about any special needs I might have in relation to the assessment process.

I confirm that the criteria used for this assessment has been discussed with me, as have the consequences and possible outcomes of this assessment.

I confirm I have accessed and understand the assessment information as provided in the Training Organisations Student Handbook.

I confirm I have been given fair notice of the date, time, venue and/or other arrangements for this assessment.

I confirm that I am ready for assessment.

Student Name: ______________________________________

Student Signature: ___________________________________

Assessment method-based instructions and guidelines: Skills TestAssessment type

Skill Test - Prepare detailed geotechnical designs

Instructions provided to the student:

Assessment task description:

This is the second (2) assessment task you must successfully complete to be deemed competent in this unit of competency.

This assessment task is a Skills Test.

This assessment task consists of four (4) practical demonstration activities.

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

You will receive your feedback within two (2) weeks, and you will be notified by your trainer/assessor when your results are available.

You must attempt all activities of the project for your trainer/assessor to assess your competence in this assessment task.

Applicable conditions:

This skill test is untimed and is conducted as an open book assessment (this means you are able to refer to your textbook or other learner materials during the test).

You will be assessed independently on this assessment task.

No marks or grades are allocated for this assessment task. The outcome of the task will be Satisfactory or Not Satisfactory.

As you complete this assessment task, you are predominately demonstrating your skills, techniques and knowledge to your trainer/assessor.

Your trainer/assessor may ask you relevant questions during this assessment task

Resubmissions and reattempts:

Where a students answers are deemed not satisfactory after the first attempt, a resubmission attempt will be allowed.

The student may speak to their trainer/assessor if they have any difficulty in completing this task and require reasonable adjustments.

For more information, please refer to the Training Organisations Student Handbook.

Location:

This assessment task may be completed in:

a classroom

learning management system (i.e. Moodle),

workplace,

or an independent learning environment.

Your Trainer/Assessor will provide you with further information regarding the location for completing this assessment task.

Purpose of the assessment

The purpose of this assessment task is to assess the students knowledge and skills essential to prepare detailed geotechnical designs in a range of contexts and industry settings.

Skills to locate and applies relevant legislation, documentation, policies and procedures

Skills to implement the requirements, procedures and techniques for the safe, effective and efficient completion of detailed geotechnical works design including:

accessing and interpreting plans, drawings, specifications and design briefs

accessing and interpreting Australian and other appropriate standards

accessing and interpreting engineering survey and geotechnical information

accessing and interpreting hydrological, meteorological, cultural and heritage data

accessing and interpreting geotechnical works construction materials test results

accessing and interpreting geotechnical works selection data

applying computer aided drafting design (CADD) and drafting technology

applying engineering graphical presentation techniques

Skills to work effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to coordinate work activities

providing clarification and advice to those applying the design

Skills to demonstrate completion of detailed geotechnical designs that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

calculate areas, volumes, densities, mass, percentages and grades

maintain design and cost records

determine geotechnical works loadings

select geotechnical works options

size geotechnical works components

select and applying appropriate construction techniques

develop and applying design plans

interpret and analysing data to recommend options

complete a detailed design of geotechnical works

prepare a cost estimate

participate in the review of the design

obtain design approval

complete and submitting design costs

review application and recommending changes.

Task instructions

This is an individual assessment.

This assessment task requires the student to prepare detailed geotechnical designs in Civil construction.

The student is required to complete the following four (4) activities in this assessment task:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

The trainer/assessor (Supervisor) will induct you to the worksite.

You will be required to complete all parts of this assessment task.

The templates for each activity are provided along with this assessment task.

The student must comply with the written and verbal reporting requirements and procedures.

The student must follow the instructions of the trainer/assessor (Supervisor).

The trainer/assessor must assess the performance of the student as per the performance checklist provided.

Assessment Task 3: Skills Test

Skills Test:

This assessment task requires the student to prepare detailed designs of geotechnical works, including evaluating design options, preparing, and finalising designs and advising on design implementation. This includes:

Locating and applying relevant legislation, documentation, policies and procedures.

Implementing the requirements, procedures and techniques for the safe, effective and efficient completion of detailed geotechnical works design.

Working effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes:

Demonstrating completion of detailed geotechnical designs that safely, effectively and efficiently meets all of the required outcomes.

To do so, you will be required to complete the following activities:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

Instructions for trainer/assessor:

The trainer/assessor must include access to designs for geotechnical works.

The trainer/assessor must arrange a worksite for the student to carry out the specified projects.

The workplace must be:

An actual workplace

A close simulation of the workplace environment provided that simulated or project-based assessment techniques replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Note: The requirements for a simulated workplace environment are given below.

The Supervisor or trainer/assessor must ensure that the simulated workplace environment requirements.

The role of the Supervisor (trainer/assessor) is to allocate the tasks, activities and responsibilities that you will be required to undertake to complete these assessments.

The worksite must meet the requirements given in the Simulated workplace environment requirements section given below.

The trainer will supervise/observe the work by standing near the working location and evaluate your performance based on performance checklist benchmarks.

The trainer/assessor must use realistic tasks or simulated tasks, relevant specifications and work instructions, standard work practices, safety requirements and environmental constraints present on the worksite.

The trainer/assessor must mark the students responses to verbal questions on the verbal questions record sheet included in the students assessment pack.

The trainer/assessor must provide a verbal briefing on each assessment prior to commencement.

Instructions for the student:

The student will be required to bring all necessary PPEs required to complete this activity.

The student must follow the instructions provided by the Supervisor.

The student must complete the activities specified.

Workplace requirements

The trainer/assessor or training organisation must provide a workplace or a close simulation of the workplace environment to replicate construction workplace conditions and standards, materials, activities, responsibilities, procedures, safety requirements and environmental considerations to each student.

The training organisation will take you to the location of the construction worksite.

Further, the training organisation must ensure the construction site must meet the requirements given in the table below.

The training organisation must ensure that the civil construction site provides the student with the opportunity to prepare detailed designs of geotechnical works in civil construction, including evaluating design options, preparing and finalising designs and advising on design implementation. The training organisation must assign a supervisor to each student or take on the role of Supervisor. The worksite must have realistic tasks or simulated tasks, relevant specifications and work instructions, standard work practices, safety requirements and environmental constraints. The site and its surroundings are accessible and clear of hazards, so far as reasonably practicable. The site must have realistic workplace conditions, standards, materials, activities, responsibilities, procedures, safety requirements, and environmental considerations. An experienced employee can provide adequate guidance and supervision to less experienced employees. The students have the clothing and footwear required. In addition, the clothing and footwear are in good condition and suitable for the task.

Simulated workplace scenario:

You are working as a design technician in a civil construction company.

You have been assigned to prepare detailed designs of geotechnical works in civil construction, including evaluating design options, preparing, and finalising designs and advising on design implementation.

Example of the task:

A new multi-story commercial building is planned to be constructed in an area with challenging soil conditions, including soft clay layers and a high-water table. You must prepare a detailed geotechnical design for the foundation system to ensure the stability and safety of the building while adhering to Australian and other appropriate standards.

While preparing detailed designs of geotechnical works in civil construction, you will be required to:

Access and interpret plans, drawings, specifications, and design briefs.

Review the project plans, design briefs, and specifications to understand the dimensions, layout, and loading requirements of the proposed building.

Examine the architectural and structural drawings to identify critical foundation design parameters.

Access and interpret Australian and other appropriate standards.

Research and review relevant Australian standards, such as AS 2870 (Residential Slabs and Footings) and AS 2159 (Piling - Design and Installation).

Consult additional international guidelines or standards applicable to foundation design and construction, if required.

Access and interpret engineering survey and geotechnical information.

Collect and analyse site-specific geotechnical data, such as such as soil profiles, groundwater levels, and soil properties from borehole logs and in-situ tests.

Review any previous geotechnical investigation reports and foundation design recommendations for the area.

Access and interpret hydrological, meteorological, cultural, and heritage data.

Obtain data on local groundwater conditions, surface water flows, and drainage to understand their impact on foundation design.

Review any available cultural and heritage information to ensure that the proposed design does not negatively impact any significant sites.

Access and interpret geotechnical works construction materials test results.

Review laboratory test results for the collected soil samples to determine their engineering properties, such as bearing capacity, compressibility, and permeability.

Access and interpret geotechnical works selection data.

Evaluate and compare different foundation design options, such as shallow foundations (spread footings, mat foundations) or deep foundations (piles, caissons), based on their suitability for the site conditions and project requirements.

Apply computer aided drafting design (CADD) and drafting technology.

Use CADD software to prepare detailed design drawings of the proposed foundation system, including plan views, cross-sections, and details of reinforcement and drainage systems.

Apply engineering graphical presentation techniques.

Create clear and concise visualizations, such as graphs, charts, and tables, to present the results of the foundation design analysis, including factors of safety, settlement estimates, and comparisons of alternative solutions.

The organisation will provide you with access to the following documents:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

When preparing geotechnical designs, you must:

Calculate areas, volumes, densities, mass, percentages, and grades.

Calculate the areas and volumes of the cut and fill sections, as well as the required quantities of construction materials (e.g., soil, rock, concrete, geosynthetics).

Determine the mass and densities of the materials to be used in the design.

Calculate the slope angles, grades, and any required reinforcement spacing or lengths.

Maintain design and cost records.

Document all design calculations, assumptions, and decisions throughout the process, ensuring that they are traceable and easily understandable.

Keep track of cost estimates and budget considerations for each design option.

Determine geotechnical works loadings.

Identify and quantify the loadings that the slope stabilization measures must resist, such as dead loads, live loads, and hydrostatic pressures.

Consider potential seismic and wind loads, if applicable.

Select geotechnical works options.

Based on the site conditions, project requirements, and comparative analysis, select the most suitable slope stabilisation technique(s).

Size geotechnical works components

Determine the dimensions and specifications for the selected slope stabilization components, such as retaining wall thickness, soil nail lengths and spacing, or ground anchor depths and capacities.

Select and apply appropriate construction techniques.

Identify the most suitable construction methods and techniques for implementing the chosen slope stabilization measures, taking into account site access, equipment requirements, and environmental considerations.

Develop and apply design plans.

Prepare detailed design plans for the slope stabilization, including construction drawings, specifications, and bill of materials.

Interpret and analyse data to recommend options.

Evaluate the design options by analysing the data collected and the calculations performed. Recommend the most viable option based on factors such as cost, constructability, and long-term performance.

Complete a detailed design of geotechnical works.

Finalise the design, ensuring that all calculations, assumptions, and specifications are clearly documented and adhere to the relevant standards and guidelines.

Prepare a cost estimate.

Prepare a detailed cost estimate for the selected slope stabilization measures, including material, labor, and equipment costs, as well as any contingencies.

Participate in the review of the design.

Present the design to peers, supervisors, or other stakeholders for review and feedback. Address any concerns or suggestions and revise the design as necessary.

Obtain design approval.

Submit the final design to the appropriate authorities or client for approval, ensuring that all required documentation is included.

Complete and submit design costs.

Finalize and submit the cost estimate for the approved design, clearly documenting all associated costs and contingencies.

Review application and recommend changes.

Monitor the construction process and review the application of the design in the field. Recommend any changes or modifications necessary to address unforeseen site conditions or other issues that may arise during construction.

Instructions for the trainer/assessor:

The trainer/assessor must assign a supervisor to each student.

The role of the Supervisor is to allocate the tasks, activities, and responsibilities that you will be required to undertake to complete this assessment task.

The Supervisor will supervise/observe the work by standing near the working location, evaluate the student demonstrating the required skills and complete an observation report based on the observation and students ability to focus on consistent performance and problem recognition and solving.

The person completing the observation report must have a direct, relevant, current relationship with the person being assessed and who is in a position to form a judgement on workplace performance relevant to the unit of competency.

Instructions for the student:

The student must follow the instructions provided by the Supervisor.

The student must complete the activities specified.

The student must clarify the operation and task requirements through verbal briefing with supervisor.

The student must follow organisational procedures, industry standards, equipment specifications, regulations, codes of practice and operations manuals during completion of the assessment activities.

Roles and responsibilities (Supervisor):

The Supervisor must:

Ensure that the student is clear about the job specifications.

Assign a supervisor or supervise the student performing each activity.

Observe the student performing each activity and assess them against the observation checklist provided after each activity.

Job responsibilities:

As part of your job role, you will have the following responsibilities:

Gather, interpret, clarify, and confirm work specifications.

Access, interpret, and apply documentation required for detailed geotechnical works designs, as well as ensure that work activity is compliant.

Create a design plan based on the resourcing and design requirements.

Gather, interpret, and analyse required data, and identify geotechnical works design options based on job requirements.

Interpret and analyse geotechnical works design options and recommend design options based on job requirements.

Create and complete detailed geotechnical works designs in accordance with job specifications.

Create a cost estimate for implementing the geotechnical works design.

Take part in the review of geotechnical works design with the necessary stakeholders.

Complete required documentation for geotechnical works design in accordance with workplace requirements.

Communicate and coordinate with design personnel in accordance with workplace requirements and within the scope of one's own role.

Obtain design approval from the appropriate authorities.

Ensure that design records are filed in accordance with workplace requirements.

Complete the design cost and reporting requirements and deliver them to the appropriate stakeholders.

Participate in design process performance review in accordance with workplace requirements.

Examine client feedback and contribute to design verification in accordance with workplace specifications.

Close out systems in accordance with workplace requirements.

As needed, provide clarification and advice to personnel implementing design to meet job requirements.

Examine design implementation and make changes as needed to meet job requirements.

As needed to meet job requirements, contribute to the design validation process.

Task:

This assessment task requires the student to prepare detailed designs of geotechnical works, including evaluating design options, preparing, and finalising designs and advising on design implementation. This includes:

Locating and applying relevant legislation, documentation, policies and procedures.

Implementing the requirements, procedures, and techniques for the safe, effective and efficient completion of detailed geotechnical works design.

Working effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes:

Demonstrating completion of detailed geotechnical designs that safely, effectively, and efficiently meets all of the required outcomes.

To do so, you will be required to complete the following activities:

Activity 1: Plan detailed design of geotechnical works

Activity 2: Carry out detailed design of geotechnical works.

Activity 3: Finalise design processes for geotechnical works.

Activity 4: Support and review design implementation of geotechnical works

Activity 1: Plan detailed design of geotechnical works

This activity requires you to plan the detailed design of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 1 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 1: Plan detailed design of geotechnical works

Steps Tick mark once completed.

Step 1: Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant.

Access the following road design documentation:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

Interpret and analyse the following data and record using Template 1.

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Consult with the Supervisor and team members and ensure the work activity is compliant.

Step 2: Obtain, read, interpret, clarify, and confirm work requirements.

Consult your supervisor and obtain work requirements for the design of geotechnical works.

Read the work requirements.

Consult relevant authorities and interpret work requirements.

Clarify and confirm project work requirements and information with relevant authorities.

Step 3: Identify and confirm the geotechnical works project requirements and information. Step 4: Prepare a design plan using Template 2, which makes the best use of the available resources and meets the design requirements. Include the following information in the design plan:

Human resource requirements

Design hardware and software

Coordination requirements

Scheduling

Review requirements

Design process communication and reporting requirements.

Sign off:

Date:

Template 1: Geotechnical works design information

Geotechnical works design information

Areas

Volumes

Mass

Percentages

Grades

Geotechnical works loadings

Size of components for geotechnical works

Template 2: Design plan

Design plan

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design plan

Worker signature:

Human resource requirements

(50-100 words)

Design hardware and software

(50-100 words)

Coordination requirements

(50-100 words)

Scheduling

Review requirements

(50-100 words)

Design process communication and reporting requirements

(50-100 words)

Sign off:

Date:

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment of the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Obtain, interpret, clarify and confirm work requirements?

Access, interpret and apply documentation required for detailed geotechnical works designs and confirm work activity is compliant?

Identify and confirm the geotechnical works project requirements and information?

Prepare design plan according to resourcing and design requirements?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 1

This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Accessed, interpreted and applied geotechnical works design documentation and ensure the work activity is compliant.

Accessed the following documentation:

Plans

Drawings

Specifications

Design briefs

Australian and other appropriate standards

Engineering surveys and geotechnical information

Hydrological, meteorological, cultural and heritage data

Geotechnical works construction materials test results

Geotechnical works selection data

Interpreted and analysed the following data.

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Consulted with the Supervisor and team members and ensure the work activity was compliant.

Obtained, read, interpreted, clarified and confirm work requirements.

Consulted with Supervisor and obtained work requirements for the design of geotechnical works.

Read the work requirements.

Consulted relevant authorities and interpreted work requirements.

Clarified and confirmed project work requirements and information with relevant authorities.

Identified and confirmed the geotechnical works project requirements and information. Prepared a design plan which makes the best use of the available resources and meets the design requirements. Include the following information in the design plan:

Human resource requirements

Design hardware and software

Coordination requirements

Scheduling

Review requirements

Design process communication and reporting requirements.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 2: Prepare detailed designs of geotechnical works.

This activity requires you to prepare a detailed design of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 2 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 2: Plan and prepare for the detailed design of geotechnical works

Steps Tick mark, once completed

Step 1: Gather, interpret, and analyse required data and identify geotechnical design options based on job requirements.

Calculate and analyse the following aspects of the design for geotechnical works:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Analyse the design options for geotechnical works.

Further, based on the above-given analysis of data, you are then required to prepare a report using Template 3 to the management that includes the following:

Two (2) viable options for the design of geotechnical works.

Provide a recommendation on the preferred option and provide a reason for the selection of the preferred option.

Step 2: Complete the detailed design of the geotechnical works using computer-aided drafting design (CADD) and drafting technology.

Access computer-aided drafting design (CADD) technology such as AutoCAD to complete the design of geotechnical works.

Take into consideration the data analysed and recommendations provided in Step 1.

Submit the finalised design to your supervisor. Step 3: Prepare a cost estimate for executing the designed geotechnical works using Template 4. Include the following information:

Fixed costs: This includes the cost of purchasing equipment, material and plants.

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration.

Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed.

The construction cost of geotechnical works. Step 4: Participate in the review of the design of geotechnical works with the required stakeholders.

Step 5: Carry out a risk assessment of the following:

the existing conditions

the application of the design

maintainability of the completed works

Determine three (3) risks, calculate their risk rating and determine risk controls for each risk identified.

Step 6: Complete a design report for the design of the geotechnical works based on the outcomes of Step 1 Step 5 using Template 4. Include the following information:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Step 7: Communicate and coordinate with personnel involved in the design process according to workplace requirements and within the scope of their role.

Conduct regular meetings to measure the progress of each workgroup involved in the design process.

Submit the meeting minutes to the trainer/assessor.

Step 8: Gain design approval from a higher authority.

Submit the design approved to the trainer/assessor.

Sign off:

Date:

Template 3: Analysis report

Analysis report

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Analysis report

Worker signature:

Two (2) viable options for the design of geotechnical works.

Provide a recommendation on the preferred option and provide a reason for the selection of the preferred option.

(200-300 words)

Template 4: Cost report

Cost report

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Cost report

Worker signature:

Fixed costs: This includes the cost of purchasing equipment, material and plants

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed The construction cost of geotechnical works:

Total costs

Template 5: Design report

Design report (500-600 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design report

Worker signature:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Obtain, interpret and analyse required data and identify design options for geotechnical works according to job requirements?

Interpret and analyse design options for geotechnical works and recommend design option according to job requirements?

Develop and complete the detailed design of geotechnical works according to job requirements?

Prepare cost estimate for implementing the design of geotechnical works?

Participate in review of design of geotechnical works with required stakeholders?

Complete required documentation for design of geotechnical works according to workplace requirements?

Communicate and coordinate with personnel involved in design process according to workplace requirements and within scope of own role?

Gain design approval from required authorities?

Calculate resourcing requirements and performs mathematical calculations?

Present information and provide assistance using sector-specific vocabulary?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 2 This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Gathered, interpreted, and analysed required data and identify geotechnical design options based on job requirements.

Calculated and analysed the following aspects of the design for geotechnical works:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Analysed the design options for geotechnical works by:

Applying strength of materials and statics principles

Analysing geotechnical works and design footings

Sizing components for geotechnical works

Completed the detailed design of the geotechnical works using computer-aided drafting design (CADD) and drafting technology.

Accessed computer-aided drafting design (CADD) technology such as AutoCAD to complete the design of geotechnical works.

Took into consideration the data analysed and recommendations provided in Step 1.

Submitted the finalised design to your supervisor. Prepared a cost estimate for executing the designed geotechnical works. Included the following information:

Fixed costs: This includes the cost of purchasing equipment, material and plants.

Time-related cost: This includes the cost of wages, equipment, and building rents spent on a particular activity in a given duration.

Quantity proportional cost: It includes the cost of the quantity of material. It is of two types such as:

Direct costs of construction of geotechnical works: The costs and expenses accrued on a facility, capacity or item are known as direct costs. The expenses caused by workers, materials and equipment, etcetera, are the direct costs of construction projects.

Indirect costs of construction of geotechnical works: These are not directly accounted for on a particular facility, product or function. These are either variable or fixed.

The construction cost of geotechnical works. Participated in review of the design of geotechnical works with required stakeholders.

Carried out a risk assessment of the following:

the existing conditions

the application of the design

maintainability of the completed works

Determined three (3) risks, calculated their risk rating and determined risk controls for each risk identified.

Completed a design report for the design of the urban road based on the outcomes of Steps 1 Step 5. Included the following information:

Cover page, including the following information:

Project Name

Design Report

Report Status (Draft / Final)

Local Authority Name (and Number)

Project Number and Contract Number (if relevant)

Date (Month / Year)

Table of content

Body of the report

Outcomes of risk assessment, including:

Risks identified.

Risk likelihood, consequence and rating

Risk controls

Evaluation of design options for geotechnical works

Calculations for:

areas

volumes

mass

percentages

grades

geotechnical works loadings

size of components for geotechnical works

Design plans for geotechnical works

Cost estimates

Recommended sizing of components

Recommended concrete strengths

Recommended reinforcement sizing and location

Communicated and coordinated with personnel involved in the design process according to workplace requirements and within the scope of their own role.

Conducted regular meetings to measure the progress of each workgroup involved in the design process.

Submitted the meeting minutes to the trainer/assessor.

Gained design approval from a higher authority.

Submitted the design approved to the trainer/assessor.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 3: Finalise design processes for geotechnical works

This activity requires you to finalise the design processes of geotechnical works.

To complete this activity, you are required to:

Complete the steps given in Checklist 3 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 3: Finalise design processes of geotechnical works

Steps Tick mark once completed

Step 1: Confirm design records are filed according to workplace requirements.

Further:

Submit the filed design records to the trainer/assessor.

Step 2: Complete and submit design cost and other reporting.

Submit cost and other reporting to the trainer/assessor.

Step 3: Participate in a performance review of the design process according to workplace requirements.

Determine the effectiveness of design processes implemented and document using Template 6.

Recommend any changes required to the Supervisor and gather feedback and document using Template 6.

Step 4: Seek client feedback and contribute to verifying the design.

Consult clients and seek feedback on design.

Verify the design and make any recommended changes.

Submit the revised design if any changes are made.

Step 5: Close out systems according to workplace requirements. Sign off:

Date:

Template 6: Finalise design processes of geotechnical works

Finalise design processes of geotechnical works (100-150 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Finalise design processes of geotechnical works

Worker signature:

Effectiveness of design processes implemented

Recommendations for changes

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment of the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Confirm design records are filed according to workplace requirements?

Complete design cost and reporting requirements and deliver to required stakeholders?

Participate in performance review of design process according to workplace requirements?

Review client feedback and contribute to design verification according to workplace requirements?

Close out systems according to workplace requirements?

Use listening and questioning to clarify and confirm understanding?

Identify and interpret information from workplace procedures, documentation, legislation and regulations?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 3 This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Ensured the filing of design records is completed.

Further:

Submitted the filed design records to the trainer/assessor.

Completed and submitted design costs and other reporting.

Submit cost and other reporting to the trainer/assessor.

Participated in a performance review of the design process with the Supervisor.

Determined the effectiveness of design processes implemented.

Recommended any changes required to the Supervisor and gathered feedback.

Sought client feedback and contributed to the verification of the design.

Consulted clients and sought feedback on design.

Verified design and made any recommended changes.

Submitted the revised design if any changes are made.

Closed out all systems.

Further, document the procedures implemented to close out all systems.

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Activity 4: Support and review design implementation of geotechnical works

This activity requires you to support and review the design implementation of geotechnical works

To complete this activity, you are required to:

Complete the steps given in the Checklist 4 provided.

Complete any template/s associated with each step, if any.

Submit the required documentation as discussed in the steps to the trainer/assessor or supervisor.

While completing each step, you must place a tick mark against each step given in the checklist.

Your trainer/assessor (Supervisor) will observe you performing this activity and complete the observation report after the completion of the activity.

Checklist 4: Support and review design implementation of geotechnical works

Steps Tick mark once completed

Step 1: Provide clarification and advice to personnel implementing design as required to meet job requirements.

Instructions:

Provide clarification and advice on the flowing to the personnel or authorities applying the design. Discuss and clarify the following with them:

Design characteristics

Key areas of consideration

Outcomes of design reports

Step 2: Validate designs.

Evaluate the design implementation and recommend changes as required to meet job requirements.

Further, record the following based on design validation using Template 7.

Assessment of design implementation

Recommended changes

Sign off:

Date:

Template 7: Design validation

Design validation (150-200 words)

Client Name: Student to fill

Address: Student to fill

Phone Number: Student to fill

Date(dd/mm/yyyy) Student to fill

Worker name: Job Details:

Design validation

Worker signature:

Assessment of design implementation

Recommended changes

Template: Observation report For Supervisor

Student Name: Unit(s) of competency: We are looking for evidence to support a judgement about the candidate's competence as part of the assessment the units of competency.

Wearelookingforreportsfromthecandidate'ssupervisorandotherpeoplewhoworkcloselywithhimorheraspartoftheevidenceofcompetence.

Supervisors name: Workplace details: Address:

Phone:

Have you read the competency modules on which you are commenting? Yes No Has the assessor disclosed the reason for the candidate's evaluation? Yes No Are you aware that a copy of this form will be seen by the candidate? Yes No Are you willing to be contacted if this statement needs to be verified further? Yes No

What technical experience and/or qualification(s) do you have in the area being evaluated? Does the Candidate consistently perform the following? Yes No

Provide clarification and advice to personnel implementing design as required to meet job requirements?

Review design implementation and recommend changes as required to meet job requirements?

Contribute to design validation process as required to meet job requirements?

Prepare and complete workplace reports using sector-specific vocabulary, grammatical structures and conventions?

Your comment on the candidate performs to the standard required by the units of competency on a consistent basis. Any further training needs for the candidate:

Any other comments:

Supervisor signature: Date:

Performance Criteria/Performance Checklist: Activity 4

This task must address the following performance criteria/ performance checklist.

To be assessed as satisfactory (S) in this assessment task, the participant needs to demonstrate competency in the following critical aspects of evidence S N/S Trainer/Assessor to complete

(Comment and feedback to students)

Provided clarification and advice to those applying the design.

Instructions:

Provided clarification and advice on the flowing to the personnel or authorities applying the design. Discussed and clarified the following with them:

Design characteristics

Key areas of consideration

Outcomes of design reports

Validated designs.

Evaluated the application of the design and recommend changes for continuous improvement.

Further, record the following based on design validation.

Assessment of design implementation

Recommended changes

The students performance was: Not satisfactory

Satisfactory

Feedback to students:

Student signature

Observer signature

Assessment Results Sheet

Outcome First attempt:

Outcome (make sure to tick the correct checkbox):

Satisfactory (S) or Not Satisfactory (NS) Date: _______(day)/ _______(month)/ ____________(year)

Feedback:

Second attempt:

Outcome (make sure to tick the correct checkbox):

Satisfactory (S) or Not Satisfactory (NS) Date: _______(day)/ _______(month)/ ____________(year)

Feedback:

Student Declaration I declare that the answers I have provided are my own work. Where I have accessed information from other sources, I have provided references and or links to my sources.

I have kept a copy of all relevant notes and reference material that I used as part of my submission.

I have provided references for all sources where the information is not my own. I understand the consequences of falsifying documentation and plagiarism. I understand how the assessment is structured. I accept that the work I submit may be subject to verification to establish that it is my own.

I understand that if I disagree with the assessment outcome, I can appeal the assessment process, and either re-submit additional evidence undertake gap training and or have my submission re-assessed.

All appeal options have been explained to me.

Student Signature Date Trainer/Assessor Name Trainer/Assessor Declaration I hold:

Vocational competencies at least to the level being delivered

Current relevant industry skills

Current knowledge and skills in VET, and undertake

Ongoing professional development in VET

I declare that I have conducted an assessment of this students submission. The assessment tasks were deemed current, sufficient, valid and reliable. I declare that I have conducted a fair, valid, reliable, and flexible assessment. I have provided feedback to the student.

Trainer/Assessor Signature Date Office Use Only The outcome of the assessment has been entered into the Student Management System

on _________________ (insert date)

by (insert Name) __________________________________

Appendix A: Reasonable Adjustments

Write (task name and number) where reasonable adjustments have been applied:

Reasonable Adjustments

Students with carer responsibilities, cultural or religious obligations, English as an additional language, disability etc. can request for reasonable adjustments.

Please note, academic standards of the unit/course will not be lowered to accommodate the needs of any student, but there is a requirement to be flexible about the way in which it is delivered or assessed.

The Disability Standards for Education requires institutions to take reasonable steps to enable the student with a disability to participate in education on the same basis as a student without a disability.

The trainer/assessor must complete the section below Reasonable Adjustment Strategies Matrix to ensure the explanation and correct strategy have been recorded and implemented.

The trainer/assessor must notify the administration/compliance and quality assurance department for any reasonable adjustments made.

All evidence and supplementary documentation must be submitted with the assessment pack to the administration/compliance and quality assurance department.

Reasonable Adjustment Strategies Matrix (Trainer/Assessor to complete)

Category Possible Issue Reasonable Adjustment Strategy

(select as applicable)

LLN Speaking

Reading

Writing

Confidence Verbal assessment

Presentations

Demonstration of a skill

Use of diagrams

Use of supporting documents such as wordlists

Non-English Speaking Background Speaking

Reading

Writing

Cultural background

Confidence Discuss with the student and supervisor (if applicable) whether language, literacy and numeracy are likely to impact on the assessment process

Use methods that do not require a higher level of language or literacy than is required to perform the job role

Use short sentences that do not contain large amounts of information

Clarify information by rephrasing, confirm understanding

Read any printed information to the student

Use graphics, pictures and colour coding instead of, or to support, text

Offer to write down, or have someone else write, oral responses given by the student

Ensure that the time available to complete the assessment, while meeting enterprise requirements, takes account of the students needs

Indigenous Knowledge and understanding

Flexibility

Services

Inappropriate training and assessment Culturally appropriate training

Explore understanding of concepts and practical application through oral assessment

Flexible delivery

Using group rather than individual assessments

Assessment through completion of practical tasks in the field after demonstration of skills and knowledge.

Age Educational background

Limited study skills Make sure font size is not too small

Trainer/Assessor should refer to the studentsexperience

Ensure that the time available to complete the assessment takes account of the students needs

Provision of information or course materials in an accessible format.

Changes in teaching practices, e.g. wearing an FM microphone to enable a student to hear lectures

Supply of specialised equipment or services, e.g. a note-taker for a student who cannot write

Changes in lecture schedules and arrangements, e.g. relocating classes to an accessible venue

Changes to course design, e.g. substituting an assessment task

Modifications to the physical environment, e.g. installing lever taps, building ramps, installing a lift

Educational background Reading

Writing

Numeracy

Limited study skills and/or learning strategies Discuss with the Student previous learning experience

Ensure learning and assessment methods meet the students individual need

Disability Speaking

Reading

Writing

Numeracy

Limited study skills and/or learning strategies Identify the issues

Create a climate of support

Ensure access to support that the student has agreed to

Appropriately structure the assessment

Provide information or course materials in an accessible format, e.g. a textbook in braille

Changes in teaching practices, e.g. wearing an FM microphone to enable a student to hear lectures

Supply of specialised equipment or services, e.g. a note-taker for a student who cannot write

Changes in lecture schedules and arrangements, e.g. relocating classes to an accessible venue

Changes to course design, e.g. substituting an assessment task

Modifications to the physical environment, e.g. installing lever taps, building ramps, installing a lift

Explanation of reasonable adjustments strategy used

Trainer/Assessor Name Trainer/Assessor Declaration I declare that I have attached all relevant evidence to provide reasonable adjustment. The training package guidelines and criteria have not been compromised in the process of providing reasonable adjustment to the student. I declare that I have conducted a fair, valid, reliable, and flexible assessment. I have provided explanation of reasonable adjustments strategy used, as required.

Trainer/Assessor Signature Date

Appendix B: Learner Evaluation Form

Please complete this evaluation form as thoroughly as you can, in order for us to continuously improve our training quality. The purpose of the evaluation form is to evaluate the areas below:

logistics and support

facilitation

training material

assessment

Your honest and detailed input is therefore, of great value to us, and we appreciate your assistance in completing this evaluation form!

Unit of Competency Name Trainer/Assessor Name Student Name (Optional) Dates of Training Employer/Work site (if applicable) Date of Evaluation A Logistics and Support Evaluation

No. Criteria/Question Strongly Disagree Disagree Neutral Agree Strongly Agree

1 The communication regarding the required attendance and time to study to pass this unit was correct 2 The staff were efficient and helpful. 3 The training equipment and material used was effective and prepared. 4 The training venue was conducive to learning (set-up for convenience of students, comfortable in terms of temperature, etc.) Additional Comments on Logistics and Support

No. Criteria/Question Strongly Disagree Disagree Neutral Agree Strongly Agree

B Trainer/Assessor Evaluation

1 The trainer/assessor was prepared and knowledgeable on the subject of the program 2 The trainer/assessor encouraged student participation and input 3 The trainer/assessor made use of a variety of methods, exercises, activities and discussions 4 The trainer/assessor used the material in a structured and effective manner 5 The trainer/assessor was approachable and respectful of the learners 6 The trainer/assessor was punctual and kept to the schedule 7 The trainer/assessor was easy to understand and used the correct language Additional Comments on Training

No. Criteria/Question Strongly Disagree Disagree Neutral Agree Strongly Agree

C Learning Evaluation

1 The learning outcomes of the unit are relevant and suitable. 2 The content of the unit was relevant and suitable for the target group. 3 The length of the training was suitable for the unit. 4 The learning material assisted in the learning of new knowledge and skills to apply in a practical manner. 5 The learning material was free from spelling and grammar errors 6 Handouts and exercises were clear, concise and relevant to the outcomes and content. 7 Learning material was generally of a high standard, and user-friendly Additional Comments on Learning Evaluation

Suggested Student Answer Pack(Stuart)

https://1drv.ms/v/s!AiDTmK_B-REDkXXQeQG7wEDqwgSv?e=CPB5ZeVideo re Student Pack and Alternative

https://1drv.ms/v/s!AiDTmK_B-REDkXXQeQG7wEDqwgSv?e=CPB5ZeVideo re Project 2 Drawing

https://1drv.ms/v/s!AiDTmK_B-REDkW4CC3Bns-lobu0B?e=k1srlbVideo 2 - Student Pack Discussion (Stuart)

https://us06web.zoom.us/rec/share/8YeGkILjsbS3zvO6hxgIbfz3_6XDYz8XkgLyEUXY-wwyHn6JqbWouUoA4boxB9iI.-C7pij-ZGoOOkAO4?startTime=1692845427000Passcode: 8QS4Tcg#

Video 1 - Intro to Geotech Classes (Stuart)

https://us06web.zoom.us/rec/share/il3LgOrxSxQrHYrWnGz78pBbckH7kRYGHz-kpdpBW1Gxc6msA9SLbFCNaQXnlH5O.pd12EiuFtJ0-OupD?startTime=1692840071000Passcode: 3!k0&Bap

Soil Properties & Compaction Machinery

HYPERLINK "https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/408/Soils%20Definitions%20%20Compaction%20Machinery.docx"https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/408/Soils%20Definitions%20%20Compaction%20Machinery.docx

Project 2 Equations to Use by Students

HYPERLINK "https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/401/Project%202%20Equations.pdf"https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/401/Project%202%20Equations.pdf

Project 2 Equations to be used in Calculations

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/430/New%20Equations%20for%20Proj%202.pdf

Project 2 Design Approach and videos recommended

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/403/Videos%20%20Design%20Approach%20for%20Proj%202.docx

10. Project 2 Data Sheets - View only if interested in origin of data !!

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/402/Project%202%20Data%20Sheets.pdfProject 2 Calculation Sheets + Video & Design Approach

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/429/Proj%202%20Calcs%20Sheet%2C%20videos%20design%20approach.docxProject 1 Video Discussion

https://1drv.ms/v/s!AiDTmK_B-REDkVIqT3MFTY4cLlKT?e=M2FkgxProject 1 Intro 2

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/410/Proj1%20Sess1%20Intro2.pdfProject 1 Intro 1 (Stuart)

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/409/Proj1%20Sess1%20Intro1.pdfProject 1 & 2 Calculation sheets Discussion ( if anyone interested to use this sheet)

https://1drv.ms/v/s!AiDTmK_B-REDkWfSxM2XwDXAb9Zm?e=1jwxC6Presentation Slides Discussion (Stuart)

https://us06web.zoom.us/rec/share/eNeHv4XgnKJtbG13cyQMzavMtTYsv9px26oaifRaPuQJ-OqyiGXiUA3VdUi8L0QN.BesyKtFeiIiDKHof?startTime=1693011210000Passcode: r^F7GAdF

Pile Design Infographics - for your general info

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/417/Pile%20Design%20Infographics.docxNew Proj 2 Drawing - Building on soft clay - minor additions FYI

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/434/New%20Proj%202%20Drawing.pdfMarking Guide Example

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/384/ss%20%20Geotech%20MG.docxs

Learner Guide Discussion pages1-18 (Stuart)

https://us06web.zoom.us/rec/share/UgZiSz2WUlq6b7xJqFHfBn4oYVPWcQBDcUp4SS4ScxeF5Bqw0b4WPQpsSNw29j_i.mJXkjDq_r3RKVCWE?startTime=1692919144000Passcode: gd?k03q6

Learner Guide Discussion Pages 19-35 (Stuart)

https://us06web.zoom.us/rec/share/UgZiSz2WUlq6b7xJqFHfBn4oYVPWcQBDcUp4SS4ScxeF5Bqw0b4WPQpsSNw29j_i.mJXkjDq_r3RKVCWE?startTime=1692925553000Passcode: gd?k03q6

Intro to Soil Cohesion & Adhesion

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/419/Intro%20to%20Soil%20Cohesion%20and%20Adhesion.docxGeotech Project 2 - Building on Soft Clay

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/434/New%20Proj%202%20Drawing.pdf

Geotech Project 1 Details

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/382/Project%201%20White.pdf

Geotech Project 1 - Design Approach + Videos

s

Geotech Proj 1 - Henri Vidal Design Theory

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/381/Reif%20Earth%20Theory%20-%20Henri%20Vidal%201963.pdfFormulas & data for Project 1

Faisal Welcome Info for Geotech Students

s

Reinforced Earth Wall Egs

https://my.campbellinstitute.edu.au/pluginfile.php/10960/mod_forum/post/380/ReifEarth%20%20RetWall%20Examples.docx

0286385Learner Guide

RIICWD507D Prepare detailed geotechnical design

00Learner Guide

RIICWD507D Prepare detailed geotechnical design

08561070RIICWD507D

Prepare detailed geotechnical design00RIICWD507D

Prepare detailed geotechnical design

Table of Contents TOC o "1-3" h z u

Table of Contents PAGEREF _Toc125099721 h 2Introduction PAGEREF _Toc125099722 h 3CHAPTER 1: PLAN FOR THE DETAILED DESIGN OF GEOTECHNICAL WORKS PAGEREF _Toc125099723 h 41.1Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant PAGEREF _Toc125099724 h 61.2Obtain, read, interpret, clarify and confirm work requirements PAGEREF _Toc125099725 h 141.3Identify and confirm the geotechnical works project requirements and information PAGEREF _Toc125099726 h 191.4Prepare a design plan which makes best use of the available resources PAGEREF _Toc125099727 h 23CHAPTER 2: UNDERTAKE THE DETAILED DESIGN OF GEOTECHNICAL WORKS PAGEREF _Toc125099728 h 282.1Interpret and analyse data and identify viable options PAGEREF _Toc125099730 h 312.2Interpret and analyse data and make a recommendation for the preferred option PAGEREF _Toc125099731 h 342.3Complete the detailed design of the geotechnical works PAGEREF _Toc125099732 h 382.4Prepare a cost estimate for executing the designed geotechnical works PAGEREF _Toc125099733 h 402.5Participate in the review of the geotechnical works design with peers and stakeholders PAGEREF _Toc125099734 h 442.6Complete the documentation for the geotechnical works design PAGEREF _Toc125099735 h 482.7Monitor and coordinate the progress of other team members involved in the design process PAGEREF _Toc125099736 h 512.8Gain design approval PAGEREF _Toc125099737 h 54CHAPTER 3: FINALISE DESIGN PROCESSES OF GEOTECHNICAL WORKS PAGEREF _Toc125099738 h 583.1Ensure filing of design records is completed PAGEREF _Toc125099739 h 603.2Complete and submit design cost and other reporting PAGEREF _Toc125099740 h 633.3Participate in performance review of the design process PAGEREF _Toc125099741 h 653.4Seek client feedback and contribute to the verification of the design PAGEREF _Toc125099742 h 673.5Close out all systems PAGEREF _Toc125099743 h 69CHAPTER 4: SUPPORT AND REVIEW THE APPLICATION OF THE DESIGN OF GEOTECHNICAL WORKS PAGEREF _Toc125099744 h 734.1Provide clarification and advice to those applying the design PAGEREF _Toc125099746 h 764.2Review the application of the design and recommend changes for continuous improvement PAGEREF _Toc125099747 h 784.3Contribute to the validation of the design PAGEREF _Toc125099748 h 80Knowledge evidence (KE) Compliance PAGEREF _Toc125099749 h 83References PAGEREF _Toc125099750 h 85

Introduction

The study of soil behaviour under the influence of loading forces and soil-water interactions is known as geotechnical engineering. This knowledge is used in the design of waste containment foundations, retaining walls, earth dams, clay liners, and geosynthetics.

It is a civil engineering discipline that studies the behaviour of natural geological materials in engineered systems.

This guide describes the skills and knowledge required for a participant to prepare detailed geotechnical designs in civil construction.

This guide is appropriate for those in management positions.

293370109220 What will I learn?

This learning guide will provide you the skills and knowledge required to:

Plan for the detailed design of geotechnical works.

Undertake the detailed design of geotechnical works.

Finalise design processes of geotechnical works.

Support and review the application of the design of geotechnical works.

What will I learn?

This learning guide will provide you the skills and knowledge required to:

Plan for the detailed design of geotechnical works.

Undertake the detailed design of geotechnical works.

Finalise design processes of geotechnical works.

Support and review the application of the design of geotechnical works.

-1955793587750062801514922500

CHAPTER 1: PLAN FOR THE DETAILED DESIGN OF GEOTECHNICAL WORKS

In this chapter, we will discuss how to plan and prepare for the detailed design of geotechnical works.

289435115155 What will I learn?

In this chapter, you will learn about the following:

Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant.

Obtain, read, interpret, clarify and confirm work requirements.

Identify and confirm the geotechnical works project requirements and information.

Prepare a design plan which makes best use of the available resources.

What will I learn?

In this chapter, you will learn about the following:

Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant.

Obtain, read, interpret, clarify and confirm work requirements.

Identify and confirm the geotechnical works project requirements and information.

Prepare a design plan which makes best use of the available resources.

Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant

Geotechnical design

The investigation of subsurface soil/rock/water conditions.

The analysis of soil-structure interaction between these conditions and proposed engineered structures.

The functional structure(s) is designed to achieve stability objectives.

Geotechnical works include:

Access, interpret and apply geotechnical works design documentation

The legislation required preparing a detailed geotechnical design

Acts, Ordinances, Regulations, By-Laws, Orders, Codes, Policies, Industrial Instruments (including Awards), and Proclamations of the Commonwealth and the State or Territory in which the Works or any part thereof are being carried out; certificates, licences, consents, permits, approvals, and requirements of organisations or Authorities having jurisdiction in connection with the Works or any part thereof; and charges payable in connection with the Works.

You must be aware of the laws that apply to the construction industry. Key legislation includes:

Competition and Consumer Act 2010- external site

Australian Consumer Law (ACL) external site

National Construction Code- external site

Disability (Access to Premises-Buildings) Standards 2010- external site

Environment Protection and Biodiversity Conservation Act 1999- external site

Heritage protection- external site

National native title Tribunal

Organisation and site requirements and procedures

Organisational rules and procedures guide decision-making processes and how work should be done in an organisation. Increased openness, accountability, uniformity, and stability result from clear, well-written policies and processes.

WHS

Work health and safety (WHS) sometimes known as occupational health and safety (OH&S) is the management of threats to everyone's health and safety in the workplace. This encompasses the health and safety of your employees, as well as your customers, visitors, and suppliers.

Implementing safe procedures and installing safety equipment may cost money and time at first, but it is vital to the success of your organisation. Failure to act may also result in prosecution, fines, and the loss of your skilled personnel.

Workers' compensation rules also necessitate purchasing workers' compensation insurance coverage for your employees.

WHS Advantages

Creating a safe working environment is a legal requirement. It is also crucial to the long-term success of your company and can:

Help you keep your staff

Improve staff productivity

Reduce injury and illness in the workplace

Reduce the costs of injury and workers' compensation.

What you need to do

You must implement health and safety practices as soon as you begin your business. Under Australian WHS legislation, your company must guarantee its employees' health and safety while not endangering others' health and safety. To accomplish this, you must:

Ensure a safe working environment

Ensure that machinery and structures are safe and that they are kept in good working order

Provide safe working conditions

Ensure that machines, structures, and chemicals are used, handled, and stored safely.

Create and maintain sufficient facilities.

Give any necessary information, training, teaching, or monitoring for safety.

Workers' health and working conditions are monitored.

What your employees must do

Employees in your company have WHS responsibilities to themselves and others on the job. They are required to:

Take responsibility for their health and safety.

Take care not to do anything that can cause harm to others.

Adhere to WHS guidelines

Adhere to the workplace's WHS regulations and procedures.

WHS mandates in your state or territory

Each state has its own set of WHS legislation and a regulator enforcing them. Each state's WHS framework comprises the following elements:

Act lays out your broad responsibilities.

Regulations - establishes precise criteria for various hazards and risks, such as noise, machinery, and manual handling.

Codes of practice - provide practical guidance on how to meet the Act's and Regulations' requirements.

Regulating Agency (regulator) - administers WHS legislation by inspecting workplaces, providing advice, and enforcing the laws. Check out their website for WHS resources and information.

Manufacturer's guidelines and specifications

Manufacturer's Recommendations refer to the instructions, procedures, and recommendations issued by the manufacturer of any equipment used at the Facility relating to the operation, maintenance, or repair of such equipment, as well as any revisions or updates issued by the manufacturer from time to time.

Manufacturer's Specifications refer to

(a) the written specifications, instructions, or recommendations provided by the manufacturer of equipment or supplies that describe how the equipment or supplies are to be built, erected, installed, assembled, examined, inspected, started, operated, used, handled, stored, stopped, calibrated, adjusted, maintained, repaired, or dismantled; and

(b) an instruction, maintenance, and operating manual, including any diagrams, for the equipment or supplies.

Australian standards

Australian Standards are published papers outlining requirements and processes to ensure that products, services, and systems are safe, dependable, and consistently functioning as intended. They establish a set of minimal parameters that determine quality and safety norms.

Australian Standards are voluntary documents created through consensus. However, because of their rigour, many Australian Standards are incorporated into legislation and made required or mentioned in contracts.

The geotechnical site investigation must be performed following AS 1726.

Geotechnical Site Investigations, Soils/Rocks | AS 1726:2017

Australian Standard AS1726: Geotechnical Site Investigations

Australian Standards, AS1289 - Various Methods of Testing Soils for Engineering Purposes

Codes of practice

A code of practice is a practical guide for meeting the legal obligations imposed by the Work Health and Safety (WHS) Act and Regulations.

The WHS Act allows the relevant Minister to approve, modify, or revoke codes of practice.

The Act also specifies how codes of practice may be applied in court.

Codes of practice have a particular position since an approved code is automatically admissible as evidence in court actions under the WHS Act and Regulations. Courts may consider a code as evidence of what is known about a hazard, risk, or control, and they may rely on the code to determine what is reasonably practical in the conditions to which the code refers.

Deals with

Deal with a duty or obligation imposed by the WHS Act or Regulations.

Contain known information regarding specific hazards, risks, and mitigation measures.

Assist in establishing what is practical in the given circumstances.

It can be supplemented with additional sorts of guidance material.

Employment and workplace relations legislation

As an employer, it is your responsibility to guarantee that all aspects of Australian employment legislation are followed and that your workers may work comfortably in a safe and secure workplace free of bullying, discrimination, and harassment.

In Australia, the primary sources of employment law are:

Legislation (federal, state, and territorial laws)

Industrial instruments

Common law

Legislation enforcing labour standards

The major pieces of legislation we deal with are the Fair Work Act 2009 (FW Act) and the Fair Work Regulations 2009. In Australia, they control the employee-employer relationship. They provide a safety net of minimum entitlements, allow for flexible working arrangements and workplace fairness, and prevent employee discrimination.

The Fair Work (Transitional Provisions and Consequential Amendments) Act 2009 permitted certain aspects of the Fair Work system to be phased progressively from 1 July 2009 until roughly 2014.

The Fair Work (State Referral and Consequential and Other Amendments) Act 2009 and the Fair Work Amendment (State Referrals and Other Measures) Act 2009 amend the Fair Work Act to allow states to refer issues to the Australian federal government to establish a national workplace relations system. Before this, most individual states enacted and enforced workplace regulations. States retained control over state and local government employees regarding labour relations.

Equal employment opportunity and disability discrimination legislation

EEO, or Equal Employment Opportunity, is the notion that everyone, regardless of race, gender, or sexual orientation, has an equal opportunity to find work based on merit. Several pieces of legislation in Australia aim to ensure equal opportunity and combat employment discrimination. The majority of states have comparable legislation.

Australia's EEO Legislation

At the federal level, some examples of equal opportunity laws include:

The Age Discrimination Act 2004;

The Disability Discrimination Act 1992;

The Racial Discrimination Act 1975; and

The Sex Discrimination Act 1984.

Disability discrimination legislation

The Disability Discrimination Act of 1992 (This is covered in state and federal anti-discrimination laws above)

The Disability Discrimination Act was enacted to protect everyone, including employees, from disability-based discrimination and is now part of Australian employment law.

It is forbidden under this statute to treat an employee unfairly because they have a disability. This also applies to employees who are relatives, friends, coworkers, or companions of a disabled individual.

What the legislation defines as a "disability" includes physical problems and intellectual, sensory, neurological, and mental disorders.

As a result, it is critical to remember that you cannot discriminate against candidates or recruits based on their impairment and that you must accommodate a disabled employee to the greatest extent humanly practical.

Confirm the work activity is compliant

Employers can take a few different steps to assist in establishing a compliance culture. Here are six techniques to ensure that your personnel follows existing policies and procedures.

Any guidelines that your personnel must follow should be documented.

The first step towards workplace compliance is ensuring everyone is familiar with your policies and processes. It is critical to include your company's regulations in your employee handbook. In this manner, you may provide each employee with a handbook in which they can evaluate the policies and procedures in place.

This method provides everyone with a document to review their rights and obligations and functions as a compliance tool if someone violates business policies. Employees can sign off on obtaining and studying the handbook. You may also use checklists to ensure employees understand the necessary steps for specific operations.

Keeping your rules and processes current with new federal regulations or company trends is also critical. You can update your handbook to incorporate new policies or alter old rules; ensure every employee can access these modifications to remain compliant. Finally, these documents should be easily accessible to employees so they can peruse them at their leisure.

Apply those policies and processes regularly.

Having policies and procedures in place is one thing; how they are implemented is quite another. Everyone in your organisation is affected by your compliance regulations, from the top CEO to the newest team member.

You must constantly apply such policies and processes equitably so that your entire organisation recognises that there is no preferential treatment. Employees will be considerably less inclined to buy into the rules if they see them not being implemented evenly. This dissatisfaction might rapidly lead to non-compliance.

The simplest method to avoid this possible issue is to emphasise the importance of these policies and procedures for everyone. Conduct frequent handbook reviews with your entire employees, going through essential regulations and corporate culture and reinforcing that it takes buy-in from everyone. You can build a culture of compliance and avoid challenges caused by inconsistent treatment by leading by example and holding everyone accountable.

Take a positive approach instead of just saying no.

If you want people to genuinely buy into a compliance culture, it's important to emphasise what they should do rather than what they shouldn't do. Taking an "against" stance on workplace standards is analogous to repeatedly telling someone "no" - at some point, they may stop listening.

This natural reaction to being told what to do is why it is preferable to focus on the right actions and educate staff on why that approach is preferable. Create policies outlining what employees should do and why those behaviours are best if you have specific safety guidelines. Establish guidelines, for example, on the safety equipment employees should use and how it keeps them safe and healthy. That is, messaging will naturally impact more than saying, "don't work without a harness."

Invest in employee training

Once you've established your policies, you'll want to do more than merely explain them to staff. Training will help to reinforce those compliance procedures and regulations, making it less likely that they will make mistakes. The following topics should be covered throughout these training sessions.

Policies, objectives, and procedures for safety and health

The safety program's functions

Contact information for anyone with questions or complaints about the programme.

How to Report Dangers, Injuries, Illnesses, and Near, Misses

In an emergency, what should you do?

Training should also be more than just a one-time occurrence. A continuous training program can assist your personnel in keeping informed about company policies and processes, especially if your compliance guidelines alter.

Use positive reinforcement for doing the right thing

Positive reinforcement can not only assist in preventing problems, but it can also encourage your staff to actively participate in workplace compliance initiatives.

There are numerous approaches you might take in this situation. You can also motivate staff by instituting a small rewards program for those who actively engage in compliant behaviour.

Maintain employee engagement

Positive reinforcement is a good start, but remember that compliance is a two-way street. Therefore, it is vital to have open lines of communication for any employees who wish to discuss workplace compliance. These discussions will not only make your staff feel heard but also reveal some possible areas for improvement.

These discussions aren't always entertaining. If someone violates corporate standards about safety, harassment, or anything else, it's time to have a serious conversation about undesirable behaviour. It's critical to maintain a compliant work environment. Therefore these discussions are vital to explain why an employee's actions violated corporate policy and how to proceed.

It's also critical to have an open line of communication with employees to learn about what's happening in the workplace. For example, if employees have problems with certain regulations or have suggestions for establishing a safer work environment, let them know that management is there to listen. In addition, allowing workers to express their feelings can help develop a more engaged workforce and highlight potential possibilities to improve compliance.

Risk assessment and management

Occupational safety and health (OSH) risk management includes a function called risk assessment that focuses on locating potential hazards. The objectives include finding hazards and analysing and evaluating the risks they pose.

To reduce the likelihood of injury and sickness, risk management in OSH is a rigorous procedure for identifying hazards, assessing and analysing the risks connected to those hazards, and then taking action to mitigate the risks that can't be eliminated. Any organisation's efforts to proactively mitigate risk before an accident or tragedy must include risk management.

In any company, the risk is the primary source of uncertainty. Before an event occurs, you, as a safety expert, may assist your organisation in identifying and managing risks.

Even though your company must adhere to standards and lower its injury rate, these measures require a perspective from the past. You may minimise risk proactively, improve safety, and maximise the return on investment from safety initiatives by putting risk management principles into practice.

Principles of risk managementBy taking the following actions, risk management aims to produce and protect value:

Include risk assessment in every aspect of your business.

Set up risk management to produce reliable results.

Create a risk management programme unique to your internal and external goals.

Include information, opinions, and perceptions from all levels of stakeholders.

Be prepared for changes and hazards and act quickly to address them.

To assist in decision-making, identify historical and current data and set expectations.

Finally, recognise how culture and human performance affect risk management.

Obtain, read, interpret, clarify and confirm work requirements

Steps to obtain and confirm work requirementsConfirm work requirements with the following:

Consultation with the client: A consultation allows you to gather information from your client, understand their objectives, and recommend the best products for them. Understanding the client's needs and expectations, which are then recorded and signed off on by the customer, is the key to a great consultation.

Consultation with others within the organisation: It is easier to discuss important information, share concerns, and ask for help when people communicate effectively. A better understanding of another person's point of view and the situation leads to better decision-making and more long-term solutions to problems.

Conducting a risk assessment of the existing and potential hazards:

Determine the hazards.

Determine who may suffer harm.

Take precautions after assessing the risks.

Keep track of your findings.

Examine your assessment and, if necessary, update it.

Obtaining further site data, including:

Known and potential hazards, constraints and conditions

Potential hazards:

Vehicles and Moving Objects

During construction, many moving objects are encountered. Overhead lifting equipment, supply vehicles, diggers, and forklifts are among them.

There is frequently a high traffic volume on a working site, and equipment movement within sites is uneven. This makes the movement extremely difficult.

As a result, your safety rule should establish clear vehicle routes and ensure that your employees do not position themselves between fixed and moving objects.

Electricity Hazards

This can happen if electrical work is done in wet conditions or if non-professionals are used.

This hazard is not limited to electricians. It can also affect other workers if they work near underground or overhead cables, at a height near power lines, or in other hazardous situations. Injuries caused by this hazard can result in serious illnesses and even death.

Noise

Construction workers are prone to hearing disorders due to the noise produced by machinery, power tools, groundwork equipment, and supply vehicles. This noise can take the form of a sudden burst of high volume, which is extremely dangerous.

Long-term repetitive sounds, such as drills and compressors, can cause short- and long-term issues, including hearing loss. It can also be a source of distraction, leading to accidents.

Constraints and conditions:

Time, scope, and cost are the three primary constraints that project managers should be aware of. These are commonly referred to as the three constraints or the project management triangle.

The constraints include a limited number of machines and automated equipment, productivity rates, weather conditions, duration of activities, and interdependence, among other things; these can all significantly impact progress.

Cultural and heritage data:

This Advisory Note explains the relevant provisions of the Aboriginal Heritage Act 2006 (the Act) and the obligation to protect Aboriginal cultural heritage when conducting geotechnical investigations. In addition, this Advisory Note addresses the following topics:

The duty to safeguard Aboriginal cultural heritage during geotechnical investigations.

Preliminary issues to consider before beginning geotechnical investigations.

What should be done if Aboriginal cultural heritage is discovered before or during geotechnical exploration?

Where to find further information and advice.

Considering the impact of geotechnical investigations on Aboriginal cultural heritage includes:

Examining the Australian Aboriginal Heritage Register for specific information on any Aboriginal cultural heritage listed in the geotechnical investigation area

Determining whether a CHMP for the geotechnical investigation area has previously been prepared.

Consultation with the Registered Aboriginal Party(s) whose area the geotechnical investigation will take place.

Geological data: Information gathered or derived from geological and geochemical techniques, such as coring and test drilling, well logging, bottom sampling, or other physical sampling or chemical testing processes, are called geological data and information.

Geotechnical data: Any information describing the ground condition through which a trenchless construction project will pass is considered geotechnical information. It considers factors such as soil type, rock presence, groundwater conditions, and other existing installations in the surrounding area.

Hydrological data: Various technologies are used to collect hydrological data, from observing gauges installed at flow measuring points to automatic data recorders and remote sensing. Data from international hydrological data collection systems are transmitted via telephone, radio, and satellite.

Survey data: A geotechnical survey involves gathering information about the physical properties of the soils and rocks that comprise the land.

Geotechnical engineers and geologists conduct surveys to design earthworks and foundations for structures.

Work Instructions checklist/template

The elements required for distinct work instructions will vary depending on the job, but most work instructions must include the following:

You must be clear about what type of work you will do in the project. Moreover, everything should be written down before actual work is carried out, which includes the required procedure and equipment.

Work instruction Sources

Work specifications and strategies are the characteristics that are necessary to complete a particular job or task.

You may require a manual that includes plans, specifications, quality requirements, and operational details and checks the work's accuracy.

Work instructionsmay be obtained via:

Oral or written and graphical instructions

Signposts

Work schedules/plans/specifications

Work-related journals/newsletters/advertisements

Charts and hand drawings

Memos

Materials safety data sheets

Technical drawings or sketches

Read work instructions

All work must comply with worksite, environment, and organisation safety strategies.

Procedures help ensure the work is completed safely without damaging equipment or putting individuals in unsafe situations. They also help ensure that the work is completed in the correct order and doesnt interrupt or get in the way of other work on the site.

Your work manual will describe the safest method of performing work and the equipment based on the specifications. You must clarify work instructions with your supervisor.

If you are unclear about where you will find work instructions or any section regarding work instructions, you must seek help from your supervisor. They will help you to locate and understand the work instructions.

Interpret and apply work instructions

The meaning of interpreting is to explain or understand.

It is important to understand the work requirements. A good understanding of the compliance documents will help you to:

Make the right decisions for each work activity/solution.

Distinguish the steps that are given in the given situation.

Determine expectations.

The keywords that must be understood when reading the compliance documents are as follow:

If there is any doubt while reading the compliance documents, discuss it with the site manager to understand them.

Identify and confirm the geotechnical works project requirements and information

Geotechnical works project requirement:

Project specifications: A project specification is a document that defines the overall management plan of a project and is used for successful project management. It lists the needs, objectives, constraints, expected features, deadlines, and budget as accurately as possible.

Contains factual information and data from an office, field investigation, and a laboratory testing program for project design elements. These are typically created by or for the owner and used in Design-Build (DB) contracts. In addition, they are given to proposal teams as a starting point for developing designs and costs for the project's pursuit phase.

Owner agencies typically state that any additional investigations required are the contractor's responsibility.

Contractual requirements: A construction contract is a crucial document because it specifies the scope of work, risks, duration, duties, deliverables, and legal rights of both the contractor and the owner.

Client's requirements: Client's Requirements refer to the document prepared by the Designer and approved by the Client that outlines the goal the Client wishes to achieve in the Project (including functional requirements, environmental standards, life span, and levels of quality) and on which the Services will be rendered.

Project site geological data: The data collected during the subsoil survey of a proposed construction site is referred to as project site geological data. The study is carried out using field research, available data, and maps, from which data is compiled to provide answers about site feasibility. Below the earth's surface, trenchless construction methods such as horizontal directional drilling (HDD) and micro tunnelling are used.

Project site engineering survey data:

The engineering survey collects, evaluates, and records ground data to determine objects' exact position on the Earth's surface (whether natural or artificial).

Among the primary goals of the engineering survey are the following:

The production of topographical maps

The mapping of property lines

The planning and evaluation of new construction projects' feasibility.

The evaluation of proposed routes for roads, railways, power lines, and so on.

Existing structures, such as highways, canals, dams, and bridges, must be inspected.

Existing project design and drawings: A project design and drawing, also known as a site drawing, is a type of technical drawing that depicts grading, geotechnical works design, or other site details. These drawings are intended to give a civil engineer a clear picture of everything on a construction site.

Geotechnical reports

Geotechnical engineers investigate and evaluate the interactions of soil, rock, groundwater, and man-made materials with earth retention systems, structure foundations, and other civil engineering work.

A set of review checklists and technical guidelines has been developed to assist engineers in reviewing projects with major and unusual geotechnical features. These features may include any earthwork or foundation-related activities, such as the construction of cuts, fills, or retaining structures, that require special attention due to their size, scope, complexity, or cost.

Identify and confirm geotechnical works project requirement

This information sheet's purpose and applicability are as follows:

Ensure that development in any area of potential instability or landslide considers factors affecting land stability.

Advise on how to prepare geotechnical reports for specific types of development.

Advise on the geotechnical certifications needed for different types and stages of development.

Determine the locations that are prone to instability.

The following factors may hamper development on steep and/or potentially unstable land:

Excavation and filling of the earth.

Building and other structure construction (such as swimming pools, tennis courts, retaining walls, roads, and driveways).

Near retaining walls and any structure, underground services.

Wastewater disposal on-site.

Natural drainage patterns have also changed significantly.

Inadequate development on steep and/or potentially unstable land may pose significant risks to property and human safety on and in areas above and below the site.

The Planning Scheme requires Geotechnical Reports to be prepared where development may affect or is affected by land instability to ensure such risks are avoided or minimised.

Geotechnical project requirement information

Where a geotechnical report has already been provided to Council as support documentation for previous development applications on the site, these documents must be referenced in the report. The reference should state that the report was prepared as support documentation for the subsequent application. Support documentation must be available to Council and be current and relevant to the proposed development, not for an alternate development on the same site.

An investigation of existing site conditions must be included in the geotechnical report.

Field investigations and tests using excavators, drill rigs, and/or seismic techniques will be required to assess the following factors.

Within the proposed work areas, the subsurface profile.

Surface and subsurface material classification.

Potential for erosion; foundation conditions that could impair structural performance and suitability for wastewater disposal

Any other site characteristics that are important for slope stability.

Previous instability (curved and/or non-vertical tree trunks, broken kerbs and gutters, cracked or uneven roadway surfaces, distressed houses or other structures). It is necessary to determine the classification of any existing slips.

The extent and type of any existing erosional occurrences.

Surface drainage patterns and characteristics.

Subsurface drainage characteristics, as well as the likelihood of this occurring as a result of heavy rain events.

current vegetation cover

Any existing site improvements

Environment management

Geotechnical engineers, closely related to civil engineers, also play an important role in sustainable development. Geotechnical engineering has the potential to embed sustainability early in project development, reducing negative environmental impact and adding social and economic value to society.

Wherever site contamination has occurred, the Environment Protection Agency (EPA) recommends and encourages remediation. Remediation is the treatment, containment, removal, or management of chemical substances or wastes so that they no longer pose an actual or potential risk to human health or the environment while considering the site's current and intended use.

Contamination is defined in the National Environment Protection (Assessment of Site Contamination) Measure 1999 (NEPM) as "the condition of land or water in which any chemical substance or waste has been added at or above background level and represents, or potentially represents, an adverse health or environmental impact."

Cultural and heritage management

The profession and practice of managing cultural heritage are known as cultural heritage management (CHM). Although it draws on cultural conservation, restoration, museology, archaeology, history, and architecture practices, it is a subset of cultural resource management (CRM).

CHM focuses on identifying, interpreting, upkeep, and preserving important cultural locations and tangible cultural assets. However, intangible cultural factors are also considered, including traditional skills, customs, and languages. When there is a threat, it usually receives the most attention and resources, and the emphasis is frequently on salvaging or rescuing archaeology. Urbanisation, industrial agriculture, mining, looting, erosive activities, or an increase in visitors beyond acceptable levels are all potential risks.

The interpretation and presentation of heritage to the general public, a substantial tourism component, serves as the public face of CHM and a key source of revenue to support ongoing heritage management. Thus, effective communication with the government and the general public is essential.

Quality management

Quality assurance (QA) is defined as having a measurable test result. Geotechnical engineers can conduct tests that yield factual, scientific data that project teams can use to make informed project decisions and ensure contract requirements are met.

The geotechnical engineer performs visual quality control (QC). For example, the engineer would monitor soil compaction to ensure it was done following contract documents.

Quality control of geotechnical design work should be an ongoing process that takes place regularly throughout the design process. Each Region is in charge of quality control for geotechnical products manufactured in its region.

Prepare a design plan which makes best use of the available resources

Prepare design plan according to resourcing

The design plan includes the following:

Human resource requirements

Human resource needs refer to the particular skills or qualities that project workers will need to possess. Managing people within an organisation is known as human resource management (HRM). HRM in construction is primarily concerned with ensuring that a project has enough human resources with the necessary skill sets and experience to complete the project successfully.

Human resource managers must be able to identify and document project roles and responsibilities and create a plan describing the end-to-end processes required on a project (or series of projects) to determine its human resource requirements.

Design hardware and software

Automatic processes are used for data collecting, contouring, terrain modelling, site design, and earthwork quantities. As a result, everything is completed quickly, including the design of culverts, corridors, drainage layers, barriers, guardrails, roundabouts, and alignments.

Simply input the necessary information, and the computer will handle the rest. Most will also permit customisation to more accurately reflect the complexity of taxing projects.

The geotechnical designer is given complete authority over pertinent design data and has ongoing access to project information, both of which are significant.

Design softwares

Autodesk Architecture, Engineering & Construction Collection

Civil 3D by Autodesk

Revit LT

Scheduling

What is the schedule for construction?

Every activity and event in a construction project has a timeline, which is called a construction schedule. The construction schedule is essential to project planning because it identifies the teams and resources required to complete each activity.

Making a construction schedule in 5 easy steps

These five stages will help you address all the key issues that must be addressed when making a building timetable.

1. Obtain information and tools.

Scheduling for construction requires a variety of resources, stakeholders, and players. There are always a lot of subcontractors involved in a construction project, so start by identifying them all. Once you get the list, contact the people on it and find out how long it will take to get the items. Then, enquire about the anticipated duration of their portion of the project. The accuracy of your time estimation depends on this.

The local code office must also obtain a list of requirements and the inspections required during the build. You must conduct the necessary study to ensure that your project complies with all applicable code requirements because they differ depending on the sort of building and materials you'll be using.

2. Collect and prioritise tasks

The project needs to be broken down into the steps that will take it from a building plan to a completed project now that you have the context and resources necessary. These are the assignments. A complete inventory of every activity that has to be completed for the construction to be successful is a requirement before you can create an accurate construction timetable.

A work breakdown structure (WBS) can help you understand the scope and scale of your project. This tool can be used to visualise your deliverables by starting with anything you're going to build and then disassembling it until you reach the most basic components. It doesn't hurt to collect the team and any subcontractors you plan to use at this time and ask them for advice. Always remember that your job list will determine your building timeline's precision. Remember that tasks might cause a project to fail; therefore, focus on the scope. Finally, remember that certain jobs depend on others, so link those together.

You must arrange the tasks on your task list after it is as complete as feasible. The WBS can help with this since it simplifies complex projects by identifying their key components and the critical dates for their completion. To distribute these jobs throughout a project timetable, use Gantt chart software. Soon, we'll go into more depth about that.

Small tasks are a good thing. Of course, larger tasks must be divided into more manageable, smaller bits. But breaking the project up into bigger sections or milestones also helps. A project's major phases, such as the addition of electrical or the cementing of the foundation, are completed at a milestone. Effective construction scheduling depends on an accurate assessment of all the many jobs and milestones that make up your project.

3. Add duration

Give each task a start and end date so that a bar chart showing the task's duration may be created on the Gantt chart. These conclusions must be grounded in reality. For example, climate impacts building schedules, and long-term weather forecasts are particularly inaccurate. Therefore, to estimate how the climate might affect the task, look at historical weather data.

You may need to determine your construction schedule holidays and consider employee sick and vacation days depending on how long the project will last. Be sure to use them as a ruler when calculating the length of your schedule if there are any potential seasonal or personal concerns.

Working with suppliers and subcontractors is an additional concern. Your contract will contain details; however, remember that these dates are frequently subject to change. Therefore, your construction timeline needs to provide flexibility to account for changes.

Making the schedule realistic is crucial. You can have a deadline in mind, but to meet it, you'll need to make quality compromises and cut shortcuts. Unfortunately, construction prohibits this from being done. The consequences are too severe. Therefore, be sincere with yourself and provide enough time in your construction timetable for everything to be finished appropriately.

Don't overlook scheduling non-task-related items like delivery, procurement, and other sources essential to the project. You must know the materials you need to order or replenish. It's equally crucial to the build. The same goes for planning any inspections, so you have time to address code violations.

When planning, bear into consideration the project's financial component as well. Add the bank draws and associate them with the relevant construction schedule assignments. When money is needed, you and the bank need to be aware. On the other hand, you don't want to delay the project by chasing after money.

4. Allocate and execute

The activities and resources are the focus of the construction schedule. Of course, tasks can't be completed independently, but assigning the work to teams in your construction plan might become complex when you have so many subcontractors to keep track of. Instead, you may simply distinguish between the various teams and work by colour-coding tasks. Once the project execution phase starts, you can identify who is working on what.

To assign your teams appropriately, you should have estimated how long the work will take them to complete and a full description of their talents and expertise. A project management solution like a project manager can provide notifications when new tasks are given, and deadlines are approaching after allocating your resources.

The construction timetable is prepared to enter the actual world once the persons allocated to the task are in place.

5. Review

The scheduling of construction is extremely complicated and requires ongoing supervision. The timeframe for any successful construction project is not set in stone. Things change, and if you don't keep track of them and review them as the project progresses, those changes will throw you off course or even worse.

As a result, you must review the building schedule at every stage of the project to ensure that your progress matches your expectations. Look at your schedule daily and make frequent updates depending on your time. To monitor the development of your construction project, utilise our daily report template for construction.

This is a time management issue. Suppose you discover that providing a daily update diverts you from other project concerns and obligations. In that case, you may need to make time each week to address the adjustments you've noticed daily and incorporate them into the timetable. The most crucial part of keeping your project on track may be monitoring and modifying your construction schedule when on- and off-site challenges develop.

Industry and organisational design

The organisational structure of a construction company refers to the arrangement of job roles and the reporting and operational relationships between and within these roles. A variety of roles and responsibilities, such as marketing, purchasing, human resources, finance, pre-construction tasks, and construction operations, most often result in such a corporate structure being organised according to departments, functions, or areas of responsibility most appropriate to organisational design.

Current industry best practices:

Procurement

The procurement procedure entails the following:

Choosing the Best construction management method

The best design team was chosen.

Choosing the best team to deliver.

Choose the best team to run the facility.

Partnering

Compared to the traditional way of working, partnering is a unique working style. Working on this requires a collaborative approach. It has been demonstrated through great projects that collaboration aids in achievement.

Greater monetary value

Increased profits for the company

Quality enhancement

Project completion forecast

Risk Management

Risks in projected are always to be expected, and a "risk register" must be kept. This will assist in entering all risks encountered from the beginning to the end of the project. The method used to manage the risk is also recorded along with the risk. This can be used in other projects. Risk assessment and analysis will aid in assigning appropriate actions to various project teams.

Value Management

This critical practice considers time, cost, and risk constraints to meet the client's business needs. The value management method will entail complete team collaboration. The team is in charge of project design and delivery.

299720127000 Self-check assessment

QUESTION 1

Discuss the documentation required for geotechnical works.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

What are the Australian standards for geotechnical works?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

How do you prepare design plan for geotechnical works?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Self-check assessment

QUESTION 1

Discuss the documentation required for geotechnical works.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

What are the Australian standards for geotechnical works?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

How do you prepare design plan for geotechnical works?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

-1574805111750060973616827500CHAPTER 2: UNDERTAKE THE DETAILED DESIGN OF GEOTECHNICAL WORKS

HAPTER 2: UNDERTAKE THE DETAILED DESIGN OF GEOTECHNICAL WORKS

In this chapter, we will learn how to undertake the detailed design of geotechnical works.

Geotechnical works plant and equipment capabilities

Geotechnical plant and equipment Capabilities

Skid steer Attachments it should be able to fit and work with the following attachments:

a) Excavator buckets with capacities of 300 mm, 450 mm, and 600 mm

b) Riper Tooth with five teeth

c) Ditch cleaning bucket size 550 mm-700 mm

d) Rock Breaker, Hydraulic vibrating type.

Streamlined track loaders:

A tracked loader, also known as a crawler loader, is a type of engineering vehicle that consists of a tracked chassis and a loader for digging and loading material. Three design evolutions can define the evolution of tracked loaders.

Wheelbarrow:

A wheelbarrow is a small hand-propelled vehicle with only one wheel designed to be pushed and guided by a single person using two handles at the back or by a sail to propel the ancient wheelbarrow by the wind.

Theodolite The theodolite is a telescope that pivots around horizontal and vertical axes to measure horizontal and vertical angles. Angles are read from circles with degrees and smaller intervals of 10 or 20 minutes.

.

28880189077 What will I learn?

In this chapter, you will learn about the following:

Interpret and analyse data and identify viable options.

Interpret and analyse data and make a recommendation for the preferred option.

Complete the detailed design of the geotechnical works.

Prepare a cost estimate for executing the designed geotechnical works.

Participate in the review of the geotechnical works design with peers and stakeholders.

Complete the documentation for the geotechnical works design.

Monitor and coordinate the progress of other team members involved in the design process.

Gain design approval.

What will I learn?

In this chapter, you will learn about the following:

Interpret and analyse data and identify viable options.

Interpret and analyse data and make a recommendation for the preferred option.

Complete the detailed design of the geotechnical works.

Prepare a cost estimate for executing the designed geotechnical works.

Participate in the review of the geotechnical works design with peers and stakeholders.

Complete the documentation for the geotechnical works design.

Monitor and coordinate the progress of other team members involved in the design process.

Gain design approval.

Interpret and analyse data and identify viable optionsInterpret

It takes analysis, contextual interpretation, and presentation to give data meaning so that the reader can utilise it to further their goals.

Evaluating material and formulating conclusions and recommendations for both expert and non-expert audiences are typical tasks within the critical thinking skills category. They are crucial to academic and professional activity.

A step-by-step approach

Working through data in three steps might be helpful when dealing with it.

1. Analyse

Analyse each piece of information to reach conclusions. Do you see any trends or patterns? Do you notice any mistakes or contradictions?

2. Interpret

Describe the implications of these discoveries in the setting at hand. What does this suggest to your reader, exactly?

3. Present

Choose, arrange, and classify ideas and supporting documentation logically. Which research findings are more crucial or pertinent? Will text or visuals help your reader understand what you mean?

To identify viable options for design

Three major activities are included in geotechnical engineering design:

1.) The comprehensive examination of subsurface soil/rock/water conditions.

2.) An examination of the interaction of soil structure with these conditions and proposed engineered structures.

3.) The design of a functional structure(s) to achieve the required stability objectives.

Design methods and options for geotechnical work:

The following factors determine the thickness of the layers used:

nature of the fill and reinforcement and

the structure's geometry.

The filling material must be compaction-ready; granular fill is typically compacted to 95% of its maximum dry density as determined by the modified proctor test.

The type of reinforcement, facing, and connections used are determined by the soil type, wall height, slope, and other factors. For example, polymeric geosynthetics are typically considered extensible, whereas steel strips are typically considered inextensible; using extensible or inextensible reinforcements may result in differences in the analysis method.

External stability evaluation will take into account the following:

Overturning

Sliding at or near the bottom

The foundation bearing failed.

The overall stability of the reinforced soil system includes the unstable or potentially unstable ground behind it.

They are carried out in static and seismic conditions using simplified methods for conventional earth-retaining structures.

Internal stability assessments will include the following:

Structural checks on the reinforcement to ensure that their tensile strength is sufficient to withstand the tensile forces generated by the interaction with the soil with adequate safety factors.

Geotechnical checks on the reinforcement to ensure that their length is sufficient to provide adequate pull-out resistance to withstand the tension generated by the interaction with the soil with adequate safety factors.

Structural checks on the facing, paying special attention to the connections with the reinforcement and local bending and shear in the facing.

Slope stability:

Slope stability analyses consider slope geometry, soil mechanical properties, and groundwater conditions to determine a slope's performance about a specified safety factor. These properties change spatially over time; geotechnical design codes require factored design parameter values to account for worst-case scenarios.

Soil shear strength

unit weight

embankment height

slope steepness

soil pore pressure.

If the geotechnical designer determines that a slope stability study is required, the following information will be required for analysis:

An accurate cross-section showing topography

Grade proposed

Profiles of soil units

Unit weight and strength parameters

As well as the loading conditions) for each soil unit

The location of the water table, as well as the flow characteristics.

For static slope stability, the design factor of safety is 1.25. For slopes where failure would significantly impact adjacent structures, this safety factor should be increased to at least 1.30. The factor of safety can be reduced to 1.1 for pseudo-static seismic analysis. Cut slopes are generally not designed for seismic conditions unless the slope failure could impact adjacent structures.

Seepage analysis and impact on design

A cut slope below the groundwater table destabilises seepage forces, adds weight to the soil mass, and increases the driving forces for slope failures. It is critical to identify and accurately model seepage within proposed cut slopes to use appropriate slope and drainage designs.

Pore pressures must be known or estimated for slope stability analysis that requires effective stress parameters. This is best accomplished by using open standpipes or observation wells to measure the surface of the phreatic (water table).

Considerations and design for surface and subsurface drainage

When designing cut slopes, the importance of adequate drainage cannot be overstated. Surface drainage can be achieved by placing drainage ditches and berms above the cut's top, around the cut's sides, and at the bottom. Surface water should be directed to appropriate collection facilities by surface drainage facilities.

Interpret and analyse data and make a recommendation for the preferred option

Requirements of a design plan

1. Identify the project's design needs and the owner's design criteria

The design manager should obtain any extra design-related information from the owner and any pertinent sources in addition to the design-related data obtained to create the workplace case. Any informational gaps should be noted, and sources should be sought as necessary.

2. Employ design advisers

Now is the time to hire all the important design experts to create the functional and concept design brief. The consultant's scope of work must be clearly defined in their contract agreement and the quantity of contribution needed.

3. Create the concept design and the functional design brief.

Control and direct the design consultant team to produce the functional design brief and the concept design that will address and document all owner requirements and needs and serve as the foundation for the design to be implemented across all design disciplines.

The concept design sketches and report, which give an overview of the suggested design, will complement the functional design brief.

4. Create a design management strategy.

For the greatest outcomes, the design management plan must be created at this stage since it serves as the road map for managing the design. It is an important part of the project manager's project management plan.

The following are the major sections of a design management plan:

Introduction

Project Overview

Design Objectives

Design Process and related procedures

Design Status

Design Documentation & Deliverables Schedule

Value Engineering

Design Reviews

Design Change

Peer Review Checks, Permits

Design Quality Management

Owner SignOffs

Design Close Out & As Built Record

5. Cost-outline plan

The creation of the outline cost plan must be managed and coordinated by the design manager and the quantity surveyor with participation from all pertinent design consultants.

6. Recognise design risks

With participation from the entire design team, any design-related risks identified during the workplace case stage should be examined and expanded upon. Any design hazards related to safety should be noted as well. The overall risk register should then be used as the foundation for the use and continuous management of the design risks after they have been evaluated and their mitigation recorded.

7. Value administration

At this point, the design manager needs to set up a value management workshop. Value management systematically evaluates a project's core capabilities or results to ensure that the best possible return on investment is realised. It considers the project's overall purpose as well as the project's capital and ongoing costs.

A value management report should be created after the workshop, reviewed by the owner, and any recommendations executed.

8. Establish the procedure for project approval

Now the design manager and design team should outline and specify the planning approval procedure and align it with the needs of the design process.

9. Create the report on the outline design.

Create a report outlining the outline design process and submit it to the owner with the functional design brief, concept drawings, and findings. This gives the owner an update and an opportunity to comment before going on to the following design phase.

The design manager can move on to the schematic design stage of the project lifecycle once the owner approves.

Preferred option factors for geotechnical design include:

Cost: The cost of performing a geotechnical design is the number of worker hours spent performing standard calculations, the time and experience spent evaluating the most likely conditions and the most unfavourable conceivable deviations from these conditions that will affect the proposed project.

Site constraints: In a given environment or context, a constraint is a condition, agency, or force that impedes or limits progress toward an objective or goal. It may have unintended consequences that are detrimental to the company's goals. Constraints in construction are classified into several types.

Economic constraints

Legal constraints

Environmental constraints

Technical constraints

Social constraints.

Available resources:

Resource management is the process of planning, supplying, and managing the resources required to meet the client's requirements on time and within budget. Proper resource management ensures that resource demand is met while maximising resource benefits.

Resource management may involve more than one project, ensuring that resource utilisation is optimised across projects. However, this can lead to conflicts when the resources needed to optimise project delivery differ from those needed to optimise performance across a portfolio of projects.

Risk assessment of the existing condition:

A risk assessment is a thorough examination of your workplace to identify those things, situations, processes, and so on that could cause harm, especially to people. After identifying the risk, you must assess its likelihood and severity. Once this determination has been made, you can decide what measures should be implemented to effectively eliminate or control the harm.

The overall process of hazard identification, risk analysis, and risk evaluation is known as risk assessment.

The process of locating, listing, and characterising hazards is known as hazard identification.

Risk analysis is the process of determining the nature of hazards and the level of risk.

Maintainability of the completed works

Design for Maintainability emphasises the importance of early project design integration of design and construction knowledge with operations and maintenance (O&M) experiences.

The stand-alone and combined processes are the two basic approaches for implementing design for maintainability. The standalone maintainability process is solely concerned with meeting project maintainability objectives. The project's resources and procedures are solely dedicated to implementing appropriate levels of maintainability.

Techniques for choosing a preferred option

Personnel: A design must be carried out by a licensed geotechnical designer supervised by a licenced professional engineer with relevant geotechnical work design experience consistent with the project's scope.

Australian agencies only recognise qualifications that meet their standards. Engineering teams typically carry out designs with assistance from many other professional fields.

Project objectives: A design should achieve project goals while considering geotechnical earthwork link and network goals. To achieve the project's goals, the design team must comprehend the project's scale, purpose, and relevance to the growth of the design.

Fit for purpose: While attempting to attain the highest degree of design, operational efficiency, and safety within the constraints of the site, the project scope, and the budget, a design must be fit for purpose.

To properly apply pertinent principles and engineering judgement and build a design solution that is fit for purpose, the design team must comprehend the purpose and function of the geotechnical design and the project scope. All aspects of geotechnical design engineering (geometric design, slope stability etc.) should be considered while creating a design.

Site specifics: To achieve the goals of the design and a balance of frequently opposing and contradictory aspects, a design must be context-sensitive, take into account, and incorporate input from all applicable disciplines and stakeholders. Each site is different. Thus the design team must consider it. It's possible that what has worked at one place won't work at another. The design team must consider various stakeholders' and disciplines' suggestions and opinions.

External factors: To meet project objectives, the design team must consider all environmental, cultural heritage, and social needs and issues, as well as how best to offset any negative effects.

Complete the detailed design of the geotechnical works

Complete the detailed design of the geotechnical works

Determine the distribution of soil and rock types for the concept design and evaluate how material properties will affect the design and construction of project elements.

Define the ground and surface water regimes for the project concept design. It is especially important to determine the depth of groundwater or surface water and its seasonal and spatial variability. It is also necessary to identify the locations of confined water-bearing zones, artesian pressures, and seasonal or tidal variations.

Identify and consider any impacts to adjacent facilities that the Concept Design's construction may cause.

Identify and characterise any geologic hazards within or adjacent to the project boundaries (e.g., landslides, rockfall, debris flows, liquefaction, soft ground or otherwise unstable soils, seismic hazards) that could affect the concept design as well as adjacent facilities that the concept design's construction could impact.

Evaluate the feasibility of proposed alignments, including the feasibility and conceptual evaluation of retaining walls and slope angles for cuts and fills, as well as the impact of concept design construction on adjacent facilities.

Geotechnical works options

Satisfactory pavement performance depends on the proper design and operation of the pavement system's key components. These include:

A smooth, friction-resistant, and sealing-wearing surface.

A sealing surface or surface water drainage (i.e., to minimise hydroplaning).

Bound structural layers (asphalt or portland cement concrete) that provide adequate load-carrying capacity as well as water intrusion barriers into the underlying unbound materials.

Unbound base and subbase layers provide additional strength and resistance to moisture-induced deterioration, particularly in flexible pavement systems.

A subgrade that provides a uniformly stiff, strong, and stable foundation for the layers above it.

Water-removal systems remove water from the pavement system quickly before it deteriorates the properties of the unbound layers and subgrade.

Remedial measures, such as soil improvement/stabilisation or geosynthetics in some cases, to increase the strength, stiffness, and/or drainage characteristics of various layers or to provide separation between layers (e.g., to prevent fines contamination)

Geotechnical works geometric

Slope geometry is an important factor that influences slope stability. Bench height, overall slope angle, and surface area are the basic geometrical slope design parameters. The stability of a slope decreases as its height and slope angle increase.

The stability of both naturally and artificially formed rock slopes can be rationally assessed. Slope stability can be improved by modifying factors such as slope geometry and groundwater conditions and adding engineered reinforcement. The slope materials' geology determines the rock mass's nature, which serves as an invariant in any subsequent analysis.

Five factors influence the slope stability of an embankment:

Soil shear strength

Unit weight

Embankment height

Slope steepness

Pore pressure within the soil.

Geotechnical work surfacing

The surfacing materials section develops standards and specifications for asphalt and concrete pavements and bridges and designs and evaluates material mixes for these products. In addition, the section evaluates new materials and manages the approved products list, which identifies construction and maintenance materials approved for procurement.

The term "aggregate" generally refers to materials that began as bedrock. Aggregate is commonly used for unpaved access roads, heavy-use area protection sites, stream crossings, trails, and other projects that require subgrade stabilisation.

Prepare a cost estimate for executing the designed geotechnical works

Prepare a cost estimate for executing the designed geotechnical works

Estimating appears to be a relatively straightforward process for the average individual. However, it involves some tasks that must be included in an estimate. To ensure a correct bid with a lucrative end, it is necessary to take into account labour, materials, equipment, subcontracting, contingencies, sales tax, and profits, which are fully stated as follows:

Labour costs: wages and benefits of workers.

Materials costs: materials required for the project. Plants, boulders, fertilisers, mulch, PVC, sprinklers, valves, controllers, wood, concrete, etc.

Equipment costs: equipment needed to complete a project, whether rented, making payments, or completely owned. Tiller, backhoe, etc.

Subcontracting costs: Even if the geotechnical design contractor isnt doing a specific task on site, it still needs to be included in the bid. Usually, subcontracting occurs if it falls out of the contractors expertise.

Contingencies: this is a backup plan in case something occurs during a project that wasnt accounted for; this can range from missing certain tasks to missed items. However, the contingencies only account for a fraction of the overall bid, so a geotechnical contractor will lose money if too many items are forgotten.

Profits: profits need to be included in a bid, or the job is practically being done for free. This section in a bid usually ranges from seven to fifteen percent. A profit section in a bid ensures that the company performing the tasks makes enough money to keep thriving long-term.

Estimating a full design requires meticulous attention to detail to ensure a profit is made at the very end of the process. The margin of error is rather high if this phase is skipped and/or guessed at.

Making an excel spreadsheet is the quickest approach to finishing this section. Once a specific plan is finished, put all the materials needed to build or construct the design into the sheet. Understanding the requirements for constructing a certain structure or setting up an irrigation or drainage system requires experience. After becoming familiar with this building style, assembling all the necessary components becomes increasingly simple.

A labour rate must be added once all materials and labour have been considered. This section focuses on the cost of hiring a labourer to complete a task. It's critical to remember that this sum encompasses more than simply the employee's hourly wage.

Including a contingency, sales tax, and profit margin in the bid is the last step in calculating the cost of a project. A category called contingency is used to account for anything that is overlooked. For instance, a contingency will take this into account if a backflow is not taken into consideration. Additionally, the contractor will probably incur losses if several duties or supplies are overlooked. Particularly, the contingency for this bid only represents 3% of the total bid.

Steps to estimate the cost

1. Define the Cost Estimates Purpose

Establish the cost estimate's purpose, the required level of detail, the recipient of the estimate, and the estimate's overall scope.

2. Develop estimating plan

Organise a team to estimate costs and describe the methods they will use. Establish a schedule and choose the person who will conduct the independent cost estimate. Make the team's schedule last.

3. Define characteristics

Establish a baseline description of the goal, the system, and the performance metrics. This covers all technological implications, system setups, plans, and interactions with current systems. Don't overlook the need for support, security, risk considerations, testing and production, deployment and maintenance, and comparable older systems.

4. Determine cost-estimating techniques

Create a work breakdown structure (WBS) and select the optimal estimating technique for each WBS component. Cross-check for drivers of cost and schedule, then make a checklist.

5. Identify rules and assumptions and obtain data

Determine explicit assumptions and specify what is included and excluded in the estimate.

6. Develop a point estimate

By calculating each WBS component, a cost model may be created.

7. Conduct sensitivity analysis

Determine the primary cost drivers and test the sensitivity of costs to changes in predicting input values and key assumptions.

8. Conduct risk and uncertainty analysis

Decide how to manage each WBS item's cost, scheduling, and technical risks.

9. Document the estimate and present it to management

To keep everyone on the same page with the cost estimate, have documentation for each step in the process. After that, you can inform the project's stakeholders about cost projections and request their permission.

10. Update Cost Estimate

The cost estimate needs to be updated and reported on if anything changes. Perform a post-mortem as well so you can record the things you learnt.

Cost estimation techniques

One of the crucial elements of the assessment and planning of geotechnical work is cost calculation. Therefore, these estimations must be reliable and consistent.

Cost estimates are necessary for various tasks, such as policy and strategy planning, rapid and in-depth initiative evaluation, cost-benefit analysis, financing decisions, budgeting, contract negotiation, and contract management for initiative delivery.

Components of an estimate

A project cost estimate itself comprises three core components:

The Base Estimate

A Contingency Allowance

An Escalation Allowance.

The Base Estimate is the sum of the Construction Costs and the Clients Costs.

Costs associated with planning and completing the tasks or activities related to a project's construction components are referred to as construction costs. They consist of direct and indirect costs, such as supervision, preliminary work, paving, and drainage.

Client costs are the expenses the proponent (for instance, a public sector agency) incurs to create and implement an initiative. These expenses include project management, design and investigation, client-specified insurance, fees, levies, and the acquisition of land and property.

The first principles estimation method is preferred to other base estimate approaches, including:

Unit rate estimates multiply the amount of work by historical unit rates obtained from earlier initiatives to determine the number of each initiative's element. Despite being a quicker way of estimation than a first-principles estimate, it is less accurate. Such a technique has inherent problems because it applies factors and allowances defined for a previous initiative (which might not apply to the initiative being assessed) inside the unit rate. After all, each initiative has specific restrictions and requirements.

Global estimating is an estimation technique that uses "all in" or "global" composite rates, like the cost of a road per kilometre. This approach may be acceptable at the beginning of an initiative when the scope is not sufficiently specified to develop a first-principles estimate, even though it is less satisfactory for later advanced initiatives.

Contingency allowance

Cost estimating contains risks and uncertainties; it is not an exact science. A contingency allowance calculates a project's cost portion that considers or represents risks and uncertaintiesrelated to the project.

Escalation allowance, outturn (nominal) cash flow and cost

The Real Cash Flow (including Contingency Allowance) for the financial years in which the expenditure will take place is then adjusted with an escalation allowance. This accounts for variations in expenses over the time from the estimate's base date (the day it was created) until the project is finished. Changes in market conditions, technology, regulation, overall industry or regional productivity, and other economic factors often impact an economic sector or segment and are among the causes that drive escalation (AACE International, 2011). As a result, escalation rates may change between economic sectors or subgroups, geographic regions, and other factors.

Participate in the review of the geotechnical works design with peers and stakeholders

Who is a stakeholder?

A stakeholder is any person, group, or organisation whose interests are affected by the success or failure of a project. Stakeholders can be inside or outside the company funding the project, and they all have a vested stake in the project's success. Stakeholders are significant because their choices can positively or negatively affect the project. In addition, there are additional crucial or important stakeholders whose backing is necessary for the project to proceed.

Reviewing geotechnical work design with peers and stakeholders

A set of review checklists and technical guidelines has been developed to assist engineers in reviewing projects with major and unusual geotechnical features. These features may include any earthwork or foundation-related activities, such as the construction of cuts, fills, or retaining structures, that require special attention due to their size, scope, complexity, or cost.

A geotechnical peer review checks for compliance with minimum code standards, completeness, obvious factual errors, consistency of data with conclusions, and geotechnical practice standards, as well as identifying areas where the proposed design may lead to future significant problems.

The geotechnical reviewer should understand that differing viewpoints characterise geotechnical engineering among geotechnical professionals.

Suppose the geotechnical consultant of record's professional opinion is supported by sufficient data and geologic and engineering analyses, and professional experience indicates that the recommendations will provide satisfactory performance. In that case, the consultant of record's opinion should be accepted. However, given the diversity of experience and background of the professionals involved, no single valid opinion or interpretation is often possible.

The geotechnical reviewer should be a licenced professional geotechnical engineer and/or engineering geologist who practises in the field being reviewed (e.g., reports by a registered geotechnical engineer should be reviewed by a registered geotechnical engineer, reports by an engineering geologist should be reviewed by an engineering geologist).

To ensure that the evolving design accurately reflects the client's objectives and that the design and budget do not diverge, it is crucial to conduct regular evaluations throughout the design process.

The main designer usually organises design reviews. They could involve the client, the consultant team, independent client advisers, and the contractor if there is one. They might also work with outside businesses that are experts in conducting design evaluations.

Design review principles

Design reviews may consider the following:

Design excellence.

Value administration.

Risk management in design.

Risks (other than risks to health and safety) related to the design, such as using novel components, goods with extended lead times, and non-standard design aspects.

Coordination in design.

Path for procurement.

Adherence to the project's guidelines. If necessary, the project brief should be modified.

Adherence to the guidelines outlined in the project execution plan. If necessary, the project execution plan should be modified.

Adherence to pertinent laws, directives, guidelines, rules, and regulations (particularly the building regulations). Consultation with statutory authorities, including the local planning authority, building control officials, or emergency services, who may have opinions on key elements of the design, may be necessary for this situation.

Plans for emergencies.

The design's viability, constructability, packageability, cost, and programming.

Coordination and integration of the design are many components or packages.

The requirement for specialised designers or contractors.

The requirement for samples, testing, mockups, and inspections (in the later stages of the design process, it may be appropriate to visit the premises of specialist contractors or suppliers to assess samples, mock-ups and tests).

Creation of a site waste management strategy that addresses ways to cut back on resource use and waste production

Evaluation of design submission methods, such as building information modelling (BIM) protocols.

After a design review, the lead designer often aggregated the feedback and gave the consulting team the go-ahead to modify or improve the design as needed.

It may be appropriate in some cases to hire specialised design review companies or unaffiliated client counsel to conduct design reviews. Design audits are another name for these reviews.

The government mandates that gateway evaluations be conducted on projects in the public sector at crucial junctures in the project's development. First, a review team conducts gateway, impartial peer reviews on behalf of the senior responsible owner. After that, the review team writes a private report for the senior responsible owner.

As a designer, to conduct an effective design review, please consider the following:

1. Set clear design review goals and rules

Every successful design review has a defined objective. Most design evaluations aim to improve the design. Therefore, issues and suggestions for improvement should take centre stage.

2. Set a clear design review process and schedule

Choose the design review procedure to help you reach your objectives, and then make sure to convey it to your team before the review begins. Finally, create a schedule to make the most of your limited time.

3. Make it user centred

User-centred design reviews are the most successful. They are all focused on the user and how to give them the best experience. Don't pay attention to what you or your colleagues prefer.

4. Make wireframes the first thing people see

An excellent location to obtain the initial round of feedback is always using wireframes. In place of specifics, it will concentrate on and emphasise the broad issues.

Design review and validation techniques

1. Review: assessing a designs acceptability, sufficiency, or efficacy in achieving predetermined goals.

Examples include peer review, design and development review, customer requirement review, review of remedial action, and review of management.

2. Verification: confirming that certain standards have been met by providing unbiased proof.

The results of an inspection or other types of decision, such as doing alternative calculations or analysing documents, can yield the objective evidence required for verification.

The corresponding status is denoted by the phrase "verified".

3. Validation: confirming that the conditions for a particular intended use or application have been met by providing objective proof. The outcome of a test or another type of determination, such as conducting alternative calculations or evaluating documents, offers the objective evidence required for validation.

The corresponding status is denoted by the word "validated".

Real or simulated use situations may be used for validation.

Performance review techniques

1. Self-Evaluation

Employees must evaluate their performance in light of established standards as part of self-evaluation. To facilitate a more in-depth conversation and ensure employees are aware of how they will be evaluated, self-evaluation is typically taken into account during an official performance review. Employees may assess their performance too high or too low, making the self-evaluation too subjective to accurately reflect work performance. However, the differences between employee and company evaluations might be instructive.

2. Behavioral Checklist

The behavioural checklist is exactly what it sounds like: a list of actions that must be taken by an employee to be regarded as a valuable team member and, consequently, to receive a positive review. Of course, the actions expected of an employee vary depending on the job type. To complete the evaluation, the employer must answer a series of precisely written yes-or-no questions, each of which may be weighted with a predetermined value.

3. 360-Degree Evaluation

A 360-degree feedback evaluation, as its name suggests, gives a thorough assessment of an employee's performance by incorporating comments from external sources. While the employee's work performance and technical skill set will still be evaluated by the employee and his or her manager, this review process will incorporate input from peers, direct reports, and/or non-direct supervisors with whom the employee routinely collaborates. A character and leadership abilities evaluation of the employee may also be included in a 360-degree feedback review.

Complete the documentation for the geotechnical works design

Complete the documentation for the design of the geotechnical work

The Geotechnical Data Report (GDR), Geotechnical Baseline Report (GBR), Geotechnical Memoranda (GM), and other geotechnical documents provided as part of or in support of a design-build project.

A GDR should only present factual geotechnical and geological information obtained for the project through site and subsurface investigation and laboratory testing and should not include interpretive information. The GDR is typically considered part of the contract in the RFP.

A Geotechnical Baseline Report (GBR) is a document provided to design-build project proposers that provides the primary contractually binding interpretation of geotechnical conditions for proposal submission.

Geotechnical design documentation includes:

A review of historical records from previous investigations and facility construction.

A geological site survey of the proposed alignment emphasises all key project features and identifies potential hazards within and adjacent to the alignment.

A subsurface investigation includes borings, cone probes, field testing, field instrumentation (such as piezometers or inclinometers), geophysical surveys, and laboratory testing.

The following elements should be included in the final geotechnical reports:

A general description of the project, its elements, and its history.

Surface conditions and current use of the project site.

Geology of the region and the site. This section should include the site's stress history, depositional/erosional history, bedrock and soil geologic units, etc.

Final reports of field test

The design method(s) used for each set of calculations must also be identified, including any assumptions used to simplify the calculations, if any, or to determine input values for variables in the design equation.

In addition to the final geotechnical report, the geotechnical design file should include the following information:

Historical project geotechnical and as-built data

Development documents for geotechnical investigation plans

The findings of geologic reconnaissance. If such data is not included in the geotechnical report, critical end area plots, cross-sections, structure layouts, and so on demonstrate the project scope and project feature geometry as understood at the time of the final design.

Information that illustrates design constraints, such as right-of-way location of critical utilities, location and type of adjacent facilities that could be affected by the design, etc.

Laboratory data, including rock core photos and records.

Measurements from field instruments

Only use final calculations unless preliminary calculations are required to demonstrate design development.

To give the contractor and the construction engineering staff a clear and simple project proposal, including the design's intent in the project plans and specifications. Maintain effective communication between the engineers responsible for the design, construction, and maintenance. This will support the design's goal and offer input on the project's constructability, maintainability, and performance to help promptly evaluate the chosen rehabilitation option.

Complete documentation required for geotechnical works

1. The construction agreement

The most basic document in a collection of building contracts is the agreement. This is essential to "the contract," the basis upon which the remaining project specifics are constructed. Therefore, the overall intent of the contract, as well as the agreed-upon price, will be stated in this document.

2. General conditions

The general conditions serve as the basis for the written construction contract papers.

Most crucially, general conditions define all contracting parties' rights and obligations. The roles and obligations of each party will also be outlined.

3. Special conditions

Usually, the general conditions section is expanded upon or modified to include special conditions. The particular terms and conditions for each assignment or project are described in full in this document. For instance, unique circumstances could contain detailed guidelines that only apply to a particular task or section of the construction.

4. Scope of work

A construction contract must include a statement of work with a clearly defined scope. The duties and goals of each contractor will be outlined in detail in this document.

The amount of work the contractor must accomplish to fulfil their contractual obligations depends on the scope of the work. Therefore, the scope is a crucial point of reference when creating change orders and punch lists.

5. Drawings

A set of blueprints or drawings should be included in every building project. Drawings offer a quick overview of the entire project. Before any construction work starts, the architect or construction manager should deliver these to the contractors.

The contractors are given instructions in this paper on what to build and how to execute it. Then, the architect, the clients, and the contractor work together to create the construction drawings. These are ideally the most recent iterations of the drawings.

6. Specifications

All technical information and performance specifications are contained in the construction specifications section. For example, the materials and methods the contractors must employ for each task should be specified in the specs. In addition, it will list all the requirements for approved materials, quality standards, and any quality checks required to ensure compliance.

The engineer or the architect will create these, and the client will confirm them. The client then gives the specifications to the contractors, who must carry out the work following them. However, if the specifications are flawed, the customer can be held responsible for any additional expenditures the contractor may have incurred due to the specs.

7. Bill of quantities

On some contracts, a bill of quantities is required but not always beneficial. For example, an itemised inventory of the components, labour hours, and materials needed is called a bill of quantities. Usually, this list is made available during the bidding process.

This will make it easier for potential bidders to evaluate their costs and enable more precise cost estimation. A quantity surveyor or building estimator often creates the bill of quantities.

Often, a schedule of values will resemble a bill of quantities to the extent that some individuals conflate the two concepts.

8. Construction Schedule

Detail-oriented planning is necessary for a successful construction timetable. All project participants should have easy access to any updates. Construction managers can create schedules using the Critical Path Method, Gantt charts, a line of balance, or any other method that best suits the project's needs. In addition, simple project outlines can be included in schedules.

However, there is a greater demand for more formal, thorough procedures the bigger and more involved the project is. In addition, everyone is updated on the project's progress via detailed construction timetables, which can lessen disagreements and delays.

9. Schedule of values

A contractor offers a schedule of values that details every aspect of the work from beginning to end. It will divide the contract payment among the different parts of the work. The schedule of values is a helpful management tool for submitting and evaluating progress payments. This document can support timely bill payments and financial flow.

Monitor and coordinate the progress of other team members involved in the design process

To clarify the project's scope, timetable, budget, and expected objectives collaborate with the many stakeholders, designers, and project executors.

Monitor and coordinate before a project

Before a project starts, ensure sufficient preparation and coordination to ensure everyone is working towards the same goals.

Determine the project's timetable, budget, scope, and quality goals.

Describe any restrictions on the current site.

Engage all parties immediately, highlight the project's advantages, and establish a continual, open communication channel.

All stakeholders' roles and obligations should be clearly defined.

Sync project plans with regional laws, regulations, and ordinances.

Early on in the process, identify probable obstacles, and budget for unforeseen expenses and delays

Establish a schedule for regular site visits, updates, and follow-ups to guarantee that the project is carried out as intended and that problems are dealt with as soon as they arise.

Coordinate with nearby ongoing projects to maximise effects and minimise the need for reconstruction or repair in the future.

Monitoring project progress:

Monitoring the progress of a project entails keeping track of numerous moving parts. For example, most projects have multiple team members working on different aspects of the project simultaneously. In addition, you must keep track of the budget, scope, schedule, resources, and tasks to be completed. Accurate and effective monitoring allows us to stay on schedule and identify problems early in the process, ensuring project success.

Make sure to develop a solid project plan.

Oversee project timelines.

Budget management.

Monitoring the project's scope.

Keeping track of project resources

Interagency coordination

It can be difficult to coordinate the several entities involved in forming roadways, but it is essential to a project's success.

Work with planning, transportation, health, design and construction, parks, enforcement, utilities, and other departments to coordinate projects, schedules, and budgets.

Establish a coordinating body responsible for assembling taskforce teams.

Organise regular gatherings and encourage the agency to agency collaborate.

Seek improved incorporation into the development of grand plans through coordinating with local, state, and federal governments.

Public-private coordination

Project managers should improve communication and coordination between all concerned public agencies and the public and private sectors.

Make sure to keep the client up to date on the project's progress and development.

Let all contractors know what the goals and deadlines are.

Engage community members who are enthusiastic about the initiative.

Coordination with utility companies

Work with utility companies and maintenance stakeholders to explain how their efforts contribute to the project's long-term success.

Make sure project objectives are well communicated and rules are established for restoring the street to its previous condition or a better one.

Communicate information

To ensure accurate construction, include detailed design documentation, illustrations, and diagrams with simple-to-follow directions.

Throughout the process, keep the community informed to foster and sustain support.

Use a variety of channels to share progress, such as social media, update signs, weekly fliers, in-person meetings, and announcements.

Think about hiring a dedicated employee to inform folks regularly.

Principles and techniques for leading and coordinating teams.

Works effectively with others to undertake and complete detailed geotechnical works design that meets all the required outcomes, including:

Complying with written and verbal reporting requirements and procedures

Reporting is an essential component of evaluation because it allows you to:

Explain what you do;

Track and monitor progress

Demonstrate influence;

Record the lessons learned;

Communicating clearly and concisely with others to receive and clarify work instructions:

When messages are given clearly, there is no possibility for misinterpretation or message modification, which lowers the likelihood of conflict. When conflict does arise, effective communication is critical to ensuring that it is resolved respectfully.

Communicating clearly and concisely with others to coordinate work activities:

Organising people, systems, activities, and other things is called coordination (or coordination). In general, coordination increases effectiveness and efficiency, whereas fragmentation can result in inefficiencies and conflicts.

Providing clarification and advice to those applying the design:

A design review is performed to ensure that all contributing factors and reasonable design options have been considered and that the design meets the requirements outlined in the geotechnical design development Specification.

The design team provides an accurate, concise overview of the design to date and facilitates productive discussions. Reviewers are responsible for evaluating the design to ensure that it can be manufactured, tested, installed, operated, and maintained acceptably to the clients.

n design approval

Design approvals and records filing

That documentation provided for building approval includes sufficient information to:

Demonstrate how each regulatory requirement will be met and document the assessment methods used to support the design.

Allow the statutory building surveyor to conduct a comprehensive evaluation of the project.

Allowing the project to be built following the NCC (National Construction Code) and other specified requirements.

Advise the statutory building surveyor on the appropriate compliance assessment to be performed during construction; and provide information on each registered practitioner responsible for the building's design and certification.

Record filing:

Filing entails storing documents in a secure location and being able to locate them quickly and easily. As a result, Cared-for documents will not easily tear, become lost, or become dirty. A filing system is an organisation's central record-keeping system. It assists you in being more organised, systematic, efficient, and transparent.

Geotechnical engineering Record keeping in construction projects allows you to better understand what happened on the job site. Keeping daily records of work progress allows you to better understand ongoing projects, organise them better, and plan for the future.

A general description of the project, project elements, and project background.

A summary of the regional and site geology. The detail included here will vary depending on the project's scope.

A summary of the site data available, including as-built information.

If applicable, a summary of the field exploration.

If applicable, a summary of the laboratory testing.

A description of the soil and rock conditions for the project. The amount of information included here will vary depending on the type of report.

Gaining design approvals for geotechnical work design

The geotechnical site investigation shall be carried out following AS 1726, and the logging of encountered subsurface materials during the geotechnical investigation shall be carried out following the departmental Geotechnical Logging Guideline.

When AS 1726 and this Geotechnical Design Standard (GDS) conflict, the content of this GDS takes precedence.

All geotechnical design reports, including drawings, must be submitted in electronic format (and hard copy if requested) to the Transport and Main Roads Geotechnical Section for review. The reports must clearly state the assumptions, justify the adopted geotechnical profiles, parameters, and design methods, and address all relevant issues or concerns for the design element.

The following items must be provided as minimum documentation for each project, as applicable:

Identify the site and the characteristics and conditions influencing the design (e.g. title, survey plan, soil sampling, climate zone, easements, vegetation, known hazards, etc.).

Site plan with confirmed boundaries, setbacks, dimensions, levels, contours, north points, existing buildings, and other site features that may impact the design.

Any notice of a local government decision or other referral body that conditions the site.

A description of the construction work to be done, including the building Class, Type, Importance Level, and, if required, complexity.

The Deemed-to-Satisfy or Performance Solution pathway was used for each relevant Performance Requirement, which includes a reference to where the evidence in support can be found in the documentation. The checklist also keeps track of which version of the NCC was used in the design.

Geotechnical design approval:

Concept designs are more casual drawings, often consisting of freehand sketches and diagrams. They are intended to explore options and design solutions for a project. The drawings will typically include site and floor plans, sections, and, on occasion, three-dimensional modelling to aid the client's early consideration of a proposal.

Following client feedback, concept designs are developed in greater detail as more certainty about the project is defined.

Following completing these designs, the next step is to prepare a development application, also known as D.A. documents. These documents contain all the information required for a formal development approval submission to the local Council.

During this stage of the project, an Architect will be juggling various tasks at once, including but not limited to the following:

Design refinement

Adding notes and dimensions to the design drawings

Creating an environmental impact statement

Development Application/D.A

A Development Application, or D.A., is a formal application to the local Council for building permission.

The approved D.A. represents the Council's approval of the project's design aspects. These aspects include the height, setbacks from the boundaries, site coverage, compatibility with the streetscape, colours and materials, and vehicle parking and access.

The requirements for D.A. drawings these days include many detailed notes and dimensions. Unfortunately, these drawings do not usually contain enough information to build the project.

Construction certificate:

The Construction Certificate is the authorisation required for an owner or builder to begin construction. A local council or a private building certifier can issue a Construction Certificate.

299720127000 Self-check assessment

QUESTION 1

Discuss the requirements of geotechnical design plan.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

How do you prepare cost estimation for geotechnical design work?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Write the procedure to gain design approval.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Self-check assessment

QUESTION 1

Discuss the requirements of geotechnical design plan.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

How do you prepare cost estimation for geotechnical design work?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Write the procedure to gain design approval.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

933450171450010922151117500CHAPTER 3: FINALISE DESIGN PROCESSES OF GEOTECHNICAL WORKS

Operational techniques:

Operations management (OM) is the administration of business practices within an organisation to achieve the highest efficiency possible.

Operations management aims to convert materials and labour into goods and services as efficiently as possible.

Corporate operations management professionals strive to maximise net operating profit by balancing costs and revenue.

Techniques

Business process redesign (BPR) is analysing and redesigning a company's workflow and business processes. BPR's goal is to assist businesses in dramatically restructuring their organisations by designing the business process from the ground up.

Reconfigurable manufacturing systems are built to accommodate rapid structure, hardware, and software changes. This enables systems to respond quickly to changes in the capacity with which they can continue production and the efficiency with which they function in response to market or intrinsic system changes.

Six Sigma is a quality-focused approach. The term "six" refers to the control limits, which are set at six standard deviations from the mean of the normal distribution. In addition, trending charts, potential defect calculations, and other ratios are tools used in the Six Sigma process.

301009116840 What will I learn?

In this chapter, you will learn about the following:

Ensure filing of design records is completed.

Complete and submit design cost and other reporting.

Participate in performance review of the design process.

Seek client feedback and contribute to the verification of the design.

Close out all systems.

What will I learn?

In this chapter, you will learn about the following:

Ensure filing of design records is completed.

Complete and submit design cost and other reporting.

Participate in performance review of the design process.

Seek client feedback and contribute to the verification of the design.

Close out all systems.

Ensure filing of design records is completedEnsure filing of design records is completed

Construction projects should be documented appropriately and kept on file for the duration. This produces a contemporary history of what occurred during the project's course that may be consulted if necessary.

This not only creates a paper trail or memory for the project that can be used to assess actions and decisions, but it also enables the reconstruction, examination, and analysis of events and timeframes in the event of a disagreement. It is commercially crucial to the parties involved that accurate records are kept since disputes are frequently resolved based on the records that are accessible rather than the facts.

There are several justifications for maintaining records:

Legal prerequisites.

Contractual conditions

To manage work.

To offer data for the next research.

The sort of project will determine how much record-keeping is necessary. It's important to balance keeping sufficient documents in case a disagreement arises and trying to capture everything, which can be challenging, time-consuming, and expensive.

High-quality records must be kept. Otherwise, they might not include the data that is expected when it is needed. Therefore, a document management system should be in place to enable effective storage and retrieval, and records, in particular, should be dated (including incoming records) and signed as needed.

Specialised software is now frequently used to manage information. Some apps make record-keeping simpler and more trustworthy. This may, for instance, enable mobile phone records to be produced on the job site and then instantly uploaded to a project document management system.

Lodge a geotechnical report

Significant engineered constructions are typically subject to some additional geotechnical tenement requirements when approved by the Department of Mines, Industry Regulation and Safety (DMIRS).

Tenement owners must submit geotechnical reports to the government within the time range given by their tenancy agreements. For example, these reports may need to be filed every month or as a one-time submission (such as a TSF construction report) (such as an annual TSF operational review report).

Submitting your report

Geotechnical reports must be provided electronically through DMIRS Submissions to satisfy a tenancy condition. In the "Reference" field, please list the tenement condition number(s) corresponding to the geotechnical report.

When submitted to satisfy a tenement condition, it is inappropriate to include geotechnical reports with the site's annual environmental report(s).

Geotechnical reports should not be submitted through the DMIRS Submissions system; rather, they should be submitted with the corresponding mining proposal or mine closure plan to support the approval of a new substantial engineered structure (such as a TSF design report).

When the report has been examined, the agency will respond in writing to tenement holders.

Types of information and Documents

Numerous decisions are taken, and a vast amount of project-related information is produced throughout a project. There must be documentation for all such facts and choices. The following crucial project information will be included:

Plans for project scope, time, cost, quality, resources, communication, risk, procurement, stakeholder involvement, and change management are all included in project management plans. Contains the scope, time, and cost baselines as well.

Project Documents - Several documents are produced during the project's planning, execution, and closeout phases.

Project charter, stakeholder register, requirement traceability document, project scope statement, WBS, activity list, activity attributes, milestone lists, network diagram, duration estimation document, project schedule, cost estimation sheet, resource estimation sheet, risk register, SOWs, bid documents, issue log, assumption log, lessons learned register, change request logs, change request forms, issue log, assumption log, lessons learned register, change request forms, and status report are some of the documents.

Project Contracts and Agreements - Consists of various contracts and agreements with outside clients and suppliers.

Project Records Management

Records from the projects above must be managed. Not all project records are documents. Therefore, there needs to be a clear set of guidelines for determining which papers above will be classified as project records and require efficient management. The management process for all such records will include the following steps:

Creation

Upkeep, holding, and retrieval

Preservation and disposal

Organisations do develop their own internal records management rules and procedures. It is made sure that every employee is informed of these rules and regulations. Records management can benefit from the usage of information technology. For example, it is possible to design appropriate file structures where the records will be stored for the project's management.

Complete and submit design cost and other reporting

Complete and submit design cost and other reporting

Cost reporting is informing a client (or another party) about a construction project's estimated or actual cost. This can be expressed in absolute terms or as a percentage of the project budget.

Cost reports are typically prepared by a cost consultant (such as a quantity surveyor) and updated regularly (perhaps monthly) to keep the client informed and to assist the client and project team in cost control.

Cost reports typically evolve throughout a project, increasing in detail and accuracy as more information about the nature of the design becomes available. Finally, specialist contractors and suppliers provide the actual prices and costs incurred.

A cost report will typically include all costs incurred up to the date of the report, where known, a forecast of the costs likely to be incurred during the remainder of the project, to the extent that these can be predicted and estimated, and risk allowances for the possibility of unforeseeable costs. Contingencies to cover these risks are frequently expressed as percentages.

Hard cost: The labour and materials used to construct the finished structure, excluding large appliances (though it generally includes installing those appliances). This includes any demolition, removal, or site work required to complete the project. This is sometimes referred to as the project's "hard cost."

General conditions refer to work that must be completed for the project to function but does not directly contribute to the finished product. Some examples include securing the site during construction, managing water runoff, providing toilet facilities during construction, and paying for the insurance required of the General Contractor (G.C.).

Calculating the cost

When it comes to each construction project, it is critical to understand the two types of charges. Soft costs and hard costs are the two types of costs:

Soft expenses

Soft costs account for 30% of total construction costs and include project management, taxes, and inspection fees.

Inspection fees apply to all transactions involving building inspections and permits. In addition, the costs of filing and obtaining necessary permits are required for project approval.

Loan interest, accounting fees such as loan-generated interest, bank transaction fees, construction loan commitment fees, mortgage broker fees, permanent commitment fees, and a few others are correlated fees.

Soft costs include construction equipment, rentals, tools, office supplies, and communication devices.

Additional soft costs may include project management fees, construction insurance, professional dues, local and state taxes, advertising, and public relations fees.

The high costs

High costs account for roughly 70% of total construction costs. The hard cost category includes any expense that is a substantial asset, such as labour and materials, to build the structure and is required to complete the project. In addition, the following are references that can also be used to offset hard costs:

Site costs include utility underground, aerial, water systems, drains, fire, paving, and grading.

A contingency fund is money for unforeseen problems that may arise during construction. It typically ranges between 5% and 10% for new projects and 10% to 20% for remodelling projects.

Overhead: covers the costs of general business operations such as staff, management, temporary facilities, utilities, tools and safety, and security.

Submission of design records and other documents include:

A general description of the project site's geological conditions.

All subsurface exploration data collected include finalised boring logs, boring location plan sheets, subsurface soil profiles, laboratory or in-situ test results, acid-producing soil presence, and groundwater information. In addition, existing water tables and standard penetration blow counts should be included in soil profiles.

Subsurface data interpretation and analysis, including laboratory and in-situ testing, and determination of design soil engineering properties such as unit weight, shear strength, compressive strength, and compressibility.

Documentation and reporting

It is critical to reduce risk in every field as much as possible. Documentation is an excellent tool for avoiding lawsuits and complaints. Documentation helps to ensure that consent and expectations are met. It is beneficial to tell the story of decisions made and how you or the client responded to various situations.

A report is a written document that contains data. Reports in the construction industry are typically formal documents that provide information to a client, local authority, purchaser, and so on about key events, project stages, or processes. However, they can also provide more general information about the state of something, from individual components to the entire construction industry or the economy.

Participate in performance review of the design process

Participate in performance review of design process according to workplace requirements

To ensure that the design being generated accurately reflects the client's needs and that the design and budget do not diverge, it is crucial to perform regular reviews throughout the design process. Furthermore, the project's solutions must abide by all applicable laws. Before moving to implementation, a qualified individual must typically review the project.

The construction control specialists offer clients their professional judgement on suggested design solutions, optimising investment implementation costs while considering industry-specifics and particular client needs. In addition, investors can save money by avoiding costly errors by thoroughly reviewing all documentation before it is published for implementation.

It conducts assessments of the documentation during the draught and detailed design phases to ensure its accuracy, conformity to the contract, and compliance with all relevant laws. Verifies the accuracy of the assumptions used for the project computation in specific instances at the client's request.

The project manager starts the review process for designs.

The scope of the review is laid forth by the project managers, together with the choice of an appropriate Reviewer (or review team). The Project Manager should suggest a method for conducting the review. There are the possibilities above (in no particular order of preference).

By discipline, e.g. civil, electrical, structural etcBy element, e.g. horizontal alignment, vertical, drainage etcBy drawing numbers

No preferences (left to the Reviewer to decide how they want to conduct the review).

The Design Review Coordinator must receive any requests for design reviews that the construction and geotechnical Engineering Branch will conduct.

Before sending the document to the reviewer(s), the project manager should complete all the fields.

Significant projects should be assessed at critical junctures during the design development process to minimise rework. However, sometimes it is advantageous to review certain project components more frequently than at the important milestone.

For each project, a plan for design reviews should be created. A design review plan may be necessary depending on the project's size, complexity, and the number of different design disciplines involved. The project manager should consider the risks associated with starting the project without a design review plan.

Requests for evaluations should include the following information:

Project Details - To inform the Reviewer of any matters they should be aware of, such as restrictions, approvals, or directions that deviate from accepted practises and the project's current state. A Design Report including all design-related topics (such as survey, environmental, geotechnical, lighting, etc.) and any additional pertinent documentation, such as Project Charters and Plans, should be included with the design.

Information Provided: A list of documents provided for review and those provided merely as background material, such as the design brief.

Review Requirements: To state whether a site inspection is necessary, the length of the project that needs to be evaluated, the features that need to be taken into account (such as drainage, geometry, etc.), and the deadline for the review report.

Material about whether the information delivered is a copy or whether it is returned to the project manager after evaluation.

Site visits are typically helpful for the review, especially for projects with a high level of risk. Site inspections, however, are not always a wise investment due to travel expenses. The risks involved in failing to recognise a project issue because a site visit was not made should be considered when determining the requirement for a site visit.

Before the review, it is frequently advantageous for the project manager and designer to speak with the reviewers about the project.

The geotechnical Engineering Branch can conduct some design reviews. By speaking with the Design Review Co-ordinator, Project Managers can check the availability of geotechnical Engineering resources. A project manager might need to engage external resources if the necessary resources are not readily available. For projects that are internally evaluated, the project manager still must coordinate each design element, such as geotechnical studies, structures, and other elements that the appropriate departments examine.

According to project managers, a design review should take ten working days. However, complex projects may take longer.

Seek client feedback and contribute to the verification of the design

Review client feedback

Both supervisors and peers can give feedback, and when done properly, the process can result in a stronger, more harmonious workplace. Positive and negative feedback is essential because it helps to break bad habits, reinforces positive behaviour, and allows teams to work more effectively toward their goals.

Contribute to design verification according to workplace requirements

Unless there are good reasons not to, the Designer should make changes to the design to remedy the faults in the review.

The Designer should be allowed to comment on the review's conclusions. Typically, a reaction can be categorised into one of the following categories:

Agree with the comment and will make the amendment.

Agree with the comment but propose not to amend it because of project constraints - (proper justification required).

Understand the comment but propose not to amend it because it is beyond the scope of the brief.

Disagree with the comment and propose not to make the amendment. Details on why the Designer disagrees with the comment are required.

Disagree with the comment but will amend it as instructed by the Project Manager.

This report should provide information on how the Designer intends to address the shortcomings noted. If the Designer disagrees with a change to address discovered flaws, they should document their reasoning in the design review report.

The project manager assesses responses and determines outcomes

The Project Manager ensures that the right course of action is implemented in response to the review's findings.

To decide on a course of action, the Project Manager and the Designer should discuss the Designer's findings and reactions. Some conclusions will be regarded as the Designer's fault, while others as a shift in the commission's original parameters. This occasionally results in a dispute over who should pay for the change. Finally, to finish the last column of the review report, it is necessary to agree on the cost of the necessary adjustments at this point.

While the Reviewer is not involved in the closeout of design changes, a Project Manager may desire to consult the Reviewer for further review information. In rare cases, a closeout meeting with the Project Manager, Designer, and Reviewer might help to explain issues presented during the review.

Several iterations may be required to resolve review concerns. Using the same review table with extra comments added for subsequent issues reported as the project proceeds for a project to be reviewed through several phases (e.g., preliminary and detailed design) may be suitable.

Any deviation from the norm or the adoption of a prescribed therapy over the Designer's advice must be approved following the Delegation of Authority.

As a formal record of the outcomes, the Project Manager must complete the last column of the design review report after the agreement has been obtained. The Designer shall receive a copy of the final report.

The Project Manager must ensure that the Designer has made the agreed-upon changes and that a copy of the finished design review report is added to the relevant project files.

Close out all systems

System closeouts

Project close-out concludes all activities throughout all phases to formally terminate and transfer the finished or abandoned project as necessary. Project closeout evaluates the project, guarantees its completion, and identifies lessons learned and best practices that can be used in similar projects. However, in multi-phase projects, the close-out approach may be used at many points in the project, such as the completion of a deliverable, a phase, an iteration, at predetermined intervals during the project's duration, or at any other point that designates a completed section of project work. When the close-out procedure is used in this way, only the portion of the project scope and related activities that pertain to that section of the project is closed out.

The final stage of construction design, known as a "construction design closeout," is frequently seen as the most challenging because it frequently results in the longest delays.

It is a process for which coordination must take into account a variety of factors:

Contractors and subcontractors

Equipment rental

Trash management

Area cleaning and delivery to the owner

As well as documentation collection and delivery to the client.

The construction design closeout's goal is to make sure that:

All project management procedures have been followed, all work has been finished as planned, and all necessary permissions have been acquired.

What steps must be taken to complete the construction process?

The seven stages that must be taken to accomplish the construction closure are as follows:

Gathering all necessary paperwork.

Verification of technical specification conformity.

Delivery to a customer.

Ensure client satisfaction.

Termination of all pending contracts.

Creating the report on the project's completion.

Archiving and outcome analysis

Collection of the necessary documentation

A substantial amount of documentation is produced throughout a project's execution, including records, estimates, orders, invoices, and reports on testing, quality, and risk.

Before the work can be finished, you must have all the required paperwork ready.

Verification of compliance with the technical specifications

It is advisable to confirm that all systems and features adhere to the client's specifications and are compatible with the project.

Delivery to the client

After the verification procedure is finished, all that is left to do is deliver the project to the client.

The client's expectations will be satisfied, and the delivery process will be completed without a hitch if all work phases have been adhered to diligently. On the other hand, if there are any administrative or quality problems, you'll almost likely need to justify any adjustments.

Client satisfaction check

Client feedback is crucial, especially their approval, which is nearly always required for a project to be considered closed.

It could be helpful to develop a feedback survey to examine and expand on the findings to improve future efforts.

Closure of pending contracts

With the client's agreement, it is possible to close any unfinished contracts and move forwards with payment to suppliers and contractors.

Preparation of the works closure report

The works closing report is the last document to be written and is used to assess the project's level of success, point out any flaws and identify any positive features before formally wrapping up the entire procedure.

The project, its goals, and its accomplishments should all be summarised in the report.

Analysis of results

As with any project, it's crucial to compile as much data as possible to support ongoing improvement. For instance, a survey conducted internally could help address the following questions:

What organisational elements proved to be successful?

What was ineffective?

Have there ever been enough resources for the workforce?

What crucial elements were a surprise?

Which areas need to be improved?

The project can then be deemed complete, and all files and data will be archived.

299720127000 Self-check assessment

QUESTION 1

How do you file design records?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

Discuss performance review.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Discuss system closeouts.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Self-check assessment

QUESTION 1

How do you file design records?

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

Discuss performance review.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Discuss system closeouts.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

72390041592500

-6159554927500cHAPTER 4: SUPPORT AND REVIEW THE APPLICATION OF THE DESIGN OF GEOTECHNICAL WORKS

WORKS

In this chapter, we will discuss the support and review of the application of the design of geotechnical works.

Team leadership techniquesUnderstand your goals clearly

Ensure you understand the project details to outline your plans and communicate them to your team.

Get to know your coworkers

Next, the best leaders are acquainted with and understand their team members. Take the time to get to know each team member, and you'll be able to communicate with them more effectively, all while assisting them in doing their best and achieving the best results possible.

Always be learning

Looking to constantly improve your skill set will allow you to expand your opportunities and effectively lead your team.

Listen

Good leaders can listen and understand what is being said. Soliciting feedback from your team and taking their suggestions seriously can significantly impact the results. Getting advice from your team could also be beneficial to you.

Learn to Delegate

A good leader can effectively delegate. This includes knowing how to enlist the help and ensuring that tasks are outsourced ahead of time to allow for adequate completion time.

Encourage collaboration

Following that, good leaders encourage team collaboration. A team with open communication channels can interact well, and supporting one another will produce the best collaborations.

26380490489 What will I learn?

In this chapter, you will learn about the following:

Provide clarification and advice to those applying the design.

Review the application of the design and recommend changes for continuous improvement.

Contribute to the validation of the design.

What will I learn?

In this chapter, you will learn about the following:

Provide clarification and advice to those applying the design.

Review the application of the design and recommend changes for continuous improvement.

Contribute to the validation of the design.

Provide clarification and advice to those applying the designProvide clarification and advice to those applying design

Why clarifying the scope of work is essential

Clarity is critical when it comes to this crucial project paperwork.

Making your expectations clearer reduces room for misunderstanding. By doing this, your construction team will easily complete your project the way you want it to.

Preventing errors and reworks

The less likely your contractor will need to undo work already done, the clearer the expectations in the scope of work should be. Even though it's crucial, editing work can be time- and money-consuming. In addition, a professional relationship may become overly stressed due to figuring out who is responsible for those charges.

Ensure timely delivery of materials and equipment

Planning is one of the best ways a contractor can complete your project on schedule, especially given the state of the supply chain today. They may plan and schedule deliveries with a clear scope of work so that necessary components arrive on time. Otherwise, items with long lead times may delay important tasks.

Choosing the best talent

Maintaining the project's schedule depends on having the appropriate personnel on-site at the appropriate time. Without a defined scope of the work, this gets complicated. In addition, finding the talent the project needs without planning could be difficult, as partners and subcontractors are frequently booked months in advance.

Provide advice to personnel implementing design

Focus on the problem

Because they first misidentify the client or problem, workplaces frequently struggle to solve issues successfully or achieve goals. To pinpoint your issue, you can:

Listen: Consider users' perspectives and put yourself in their position.

Pose inquiries: Who runs into the issue and why? Why did earlier tries to address it fall short?

Finally, engage in a cooperative dialogue.

Stay impartial

2. Train your team members on design thinking techniques.

Engineers or project managers have traditionally handled the ideation stage of the geotechnical design thinking process. However, it is not restricted to those uses. Everyone should contribute by clarifying, comprehending, and testing.

Develop the mindset: Start putting the approach into practice in your role as soon as possible.

Encourage interest: Encourage experimentation or consider paying for design thinking workshops if you have team members who wish to take the initiative and broaden their skill sets.

3. Increase the frequency of your debriefings.

This process is ongoing. Iterating on prior experiments enables the outcome or product to be improved. However, without feedback, learning cannot be put into practice.

4. Adopt a feedback loop.

Finding the optimal solution is what design thinking aims toward, not perfection. And it's unlikely that the initial response will always be the best. So the feedback loop must always be active. For example, you can use a feedback loop to:

Make as many tests and revisions as you can. Look for fresh approaches and perspectives to test your theories. You might discover something that would have never occurred to you otherwise.

Hold frequent feedback sessions. When you accept feedback, you establish a safe environment for innovation and stop the same errors from repeating.

The geotechnical design team may find it helpful to use design thinking to find and address important problems. In addition, you may spend time productively solving the correct problems and creating procedures that will affect your company's success if you adopt a design-thinking mentality.

Review the application of the design and recommend changes for continuous improvement

Review the application of the design and recommend changes for continuous improvement

Design review concerns the appearance of new construction, site planning, geotechnical work, hydrological data etc.

A set of review checklists and technical guidelines has been developed to assist engineers in reviewing projects with major and unusual geotechnical features. These features may include any earthwork or foundation-related activities, such as the construction of cuts, fills, or retaining structures, that require special attention due to their size, scope, complexity, or cost.

The goal is to compare the current state of the design to a set of requirements, using the team's collective wisdom to digest the information and provide feedback on the emerging design solution. Finally, the team either approves the design state or creates a prioritised list of issues that must be addressed before moving on to the next stage of development.

1. Appoint a facilitator: The facilitator will plan the review, decide who will participate, and determine whether the review will be complex enough that information will need to be provided ahead of time, among other things. Assign someone to take notes.

2. Outline the review's objectives: Begin with a level-setting exercise to ensure that participants understand the project's status and the purpose of the review.

3. Give the team context: What are the requirements and constraints? What are the critical success factors?

4. Display the design. This can take various forms, including CAD models and screenshots, functional prototypes, schematics, and theory of operation documents.

5. Maintain a productive and focused discussion- Don't be defensive if you're the technical lead. The review's goal is to identify problems and make improvements. Some comments will undoubtedly be subjective, such as "that's not how I would do it..." Investigate further to comprehend the issue with the current design state. Refrain from turning the design review into a brainstorming session for improvement. First, locate all of the issues. A follow-up activity could be brainstorming solutions.

6. Make a list of issues and prioritise them. This is why having someone assigned to take notes is extremely beneficial. As people get tired and time runs out, this can be the most difficult part of the meeting. Ensure that you adhere to your Design Review procedures, categorise issues, and create follow-up tasks and sign-offs as needed.

7. Document, follow up, and conclude. Send meeting notes, and make sure action item lists are completed and signed off on.

Report on design review

The scope and content of the report will be determined by the clients and what was agreed upon during the design review. This report should typically be issued within a month of the design review meeting. In addition to the meeting minutes, the report should include the status of each issue or action item and details on how these items were resolved. If additional investigation, testing, or other analyses have been completed, proof of these should be provided.

It is not unusual for the results of a design review to result in changes in direction, schedule, and budget. The impact of these changes should be assessed, and an updated project plan should be included.

Contribute to the validation of the design

Contribute to design validation process as required to meet job requirements

Design Validation Process

Some designs may be validated by comparing them to similar equipment serving similar functions. This method is especially useful for validating configuration changes for existing infrastructure or standard designs used in a new system or application.

Validation of requirements and other product functionality may be accomplished through demonstration and/or inspection.

The design can be analysed using mathematical modelling and simulation techniques to recreate the required functionality.

On the final design, tests are performed to validate the system's ability to operate as specified.

The test plan, execution, and results should all be documented and kept as part of the design records. As a result, Validation is a compilation of the outcomes of all validation activities.

Because validation is all about ensuring that the product/intended service's purpose is met, it is critical to specify as a design input:

The environment and circumstances in which the final product/service will be used

The end-user's skills, knowledge, and abilities

How the finished product or service will be used, and so on.

After the architect has completed the design and verified the drawings using the steps outlined earlier, he must determine whether the geotechnical designmeets the intended purpose.

Any defects or issues discovered during the design verification and validation activities must be resolved before the organisation moves forward with production.

Before beginning validation tests, establishing acceptance criteria is always a good idea. This can be subjective or objective as long as it is relevant to the product/service you are providing. Another important point to remember is that final design validation always comes after design verification activities, never before.

.

299720127000 Self-check assessment

QUESTION 1

Discuss about providing clarification and advice to personnel.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

Discuss about design validation.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Discuss about design verification. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Self-check assessment

QUESTION 1

Discuss about providing clarification and advice to personnel.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 2

Discuss about design validation.

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

QUESTION 3

Discuss about design verification. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Knowledge evidence (KE) Compliance

Evidence of the ability to:

To be competent in this unit, a candidate must demonstrate knowledge of the following: Mapped to performance criteria Chapter in the learner guide Page number and paragraph

Accessing, interpreting and applying legislative, organisation and site requirements and procedures for:

risk assessment and management

work health and safety

environmental management

cultural and heritage

quality management

Australian and other relevant standards

industry and organisational design

current industry best practice

geotechnical works options

geotechnical works geometric

geotechnical works surfacing

reporting and documentation

design approvals and records filing

performance reviews

systems close out 1.1

1.1

1.3

1.3

1.3

1.1

1.4

1.4

2.3

2.3

2.3

3.2

2.8

2.5

3.5 01

01

01

01

01

01

01

01

02

02

03

02

01

03 12-13

7-8

20

20-21

21

9

26

26

38

39

39

65

55

47-48

70

Potential hazards, constraints and conditions

1.2 01 14-15

Techniques for choosing preferred options

2.2 02 37-38

Team leadership techniques

Introduction 04 75

Operational techniques

Introduction 03 60

Geotechnical works plant and equipment capabilities

Introduction 02 30

Cost estimation techniques

2.4 02 42-44

Design review principles 2.5 02 45-47

51754-68370ReferencesAustralian Building Codes Board. ABCB. (n.d.). Retrieved 2022, from https://www.abcb.gov.au/

Federal Highway Administration. (n.d.). Retrieved 2022, from https://www.fhwa.dot.gov/engineering/geotech/pubs/reviewguide/checklistd

9 steps to define design requirements on your project Project Manager. (2022). Retrieved 2022, from https://projectmanager.com.au/9-steps-design-requirements-project/(2022). Retrieved 2022, from https://www.levelset.com/blog/construction-contract-documents-guide/Design Review Guideline | Main Roads Western Australia. (2022). Retrieved 2022, from https://www.mainroads.wa.gov.au/technical-commercial/technical-library/road-traffic-engineering/typical-project-processes/design-review-guideline/

  • Uploaded By : Pooja Dhaka
  • Posted on : November 21st, 2024
  • Downloads : 0
  • Views : 170

Download Solution Now

Can't find what you're looking for?

Whatsapp Tap to ChatGet instant assistance

Choose a Plan

Premium

80 USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 50 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

20 USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more