Buil 1223 -Applied Project Management Assessment
- Subject Code :
Buil-1223
- Country :
United Kingdom
As a consulting Construction manager, you have been asked to consider the main issues that willhave a major bearing to the successful completion of the project (only the first floor Not thebasement).You are required to visit the site, carry out visual and any other appropriate researchandreportbackonthefollowingissues:
NB: where insufficient information is provided please make appropriate and reasonableassumptions:
- Design and Build procurement strategy under collaborative contracting has been proposedas the most ideal method of delivering the project. Outline the organisation structure andefficientsupplychainmanagement bestsuitedtodeliverthe project.
- Preparea genericWBSprogramof works(thiscan includework packages)
- Prepare a detailed scheduled program of works for this project (you may assumeinformationnot provided).
- Outline the key budgetary considerations and control mechanism. (make appropriate andreasonableassumptionsoncost breakdown)
- Outlinekeyqualitymanagementconsiderationduring theconstruction
The Harvard System of referencing should be used. Academic neglect to reference your workcorrectly will lead to a poor mark and possible failure of this assignment. The word count is to be amaximumof2000words(excludingthe referencesectionandanyappendices).