Building Information Modeling (BIM) BLCN29005

Flat 50% Off Order New Solution
Added on: 2025-05-19 07:19:59
Order Code: LD523207
Question Task Id: 0
  • Subject Code :

    BLCN29005

Assessment03Brief

BLCN29005-BuildingInformationModelingTerm 3 - 2024

DueDate-Week 12 Friday (7 February 2025) 11:59 PM (BrisbaneTime)

Summary

Assessment 3 evaluates BIM knowledgeand software skills concerning the delivery stageof construction projects. In addition to software skills gained from the tutorials, students willundertake research to complete this assessment. Students will use Autodesk Revit (2020 orlater) and Autodesk Navisworks (2023 or later) to illustrate their skills on design changes, 3Dcoordinationand4D(timeintegration)and5D(costintegration)modelling.Inadditiontodigitalskill development, it is expected that students will understand the benefits and challenges ofBIM compared to traditional project delivery.

Question 1(50marks)

This part focuses on students information management and communication skills using Revit. Assume that you are an architect. Your client Matt Smith is a new property developer and hasrequestedyourassistancewithestimatingthepreliminarycostofa 4x2doublestorydwelling. The EIRs are provided to you and as below:

Role

Duty

Property

System or product

Purpose

MattSmith

Tobeinformed

Thepreliminary cost

4x2doublestory

Preliminary designapproval

MattSmith

Tobeinformed

Thepreliminary use and area

Room

Preliminary designapproval

Matt wants the preliminary design in Revit 2020 (or later). All EIRs must be extracted directly from the preliminary design authoring model, expect the referenceinformation that the preliminary cost of the house (for all areas)must be based onthe rate of AUD 2320persquaremeter.Theclienthasinformedyou thattheroom sizemustbeLOD200.

  1. Considering the problem description, develop the preliminary architecturalYou may use Revit masses or key building elements [it is recommended to use LOD100 for building elements such as walls, roof and floors]. You must assume room sizes for your design.
  2. Derive the preliminary cost estimate using

  1. The client has requested the information models in the data formats mentioned Produce the required output [These must be submitted for grading].

Informationmodel

Dataformat(s)

3Dmodel

Revit2020orlater

Floorplan

DWGand PDF

Costestimateandroomareaschedule

PDFand.XLSX(MSExcel)

  1. Assume that the client has accepted the preliminary design. Now you are tasked with developing the design development (architectural) model. The EIRs remained the same as mentioned in the problem description. Produce the:
    1. Revised 3D model;
    2. Revised floor plan; and
    3. Revised room area schedule

Your submission must include the outcomes from Steps 3 and 4. The files must be named followingthenamingconventionrecommendedbytheUKNationalAnnextoISO19650(seeFigure 1).

Figure 1:Filenamingconventionrecommended bytheUKNationalAnnextoISO19650

Question2(25marks)

YouwilluseNavisworks2023tocompletethisquestion.

In DataSet.Zip, find the Architectural, Structural, and MEP design of a conference hall insidethe folder entitled: Question 2. The files are provided to you as NWC files.

[note:youwillneedtoextractDataSet.Zipbeforecontinuingwiththisexercise]

YouaredetectingclashesbetweennumerousSystemTypesavailableintheMEPmodel and the Structural model. Clash reports must be sent to the appropriatedesigner (relevant system type engineer or structural engineer) as HTML files tofacilitate design amendments. Following the detailed process map above, complete clashmanagement(i.e., design tests andmanaging results)usingClash Detective.Use "Hard Clash" as the Clash Type.

You must submit

  1. The NWD file which includes the federated model and the Clash Detective exercise
  2. Clash reports as HTML files

Question3(25marks)

YouwilluseNavisworks2023tocompletethisquestion.

In DataSet.Zip, find the Structural design of a residential building. You are creating the 4Dmodel to illustrate the construction sequence of the structural frame using the process mapgiveninFigure2[youmayfindaclearcopyofthisprocessmapisfoundathttp://bim.psu.edu].

[note: you will need to extract DataSet.Zip before continuing with this exercise].

Messner,J.,Anumba,C.,Dubler,C.,Goodman,S.,.Kasprzak,C.,Kreider,R.,Leicht,R.,Saluja,C.,andZikic,N.(2019).BIMProjectExecutionPlanningGuide,Version2.2. Computer Integrated Construction Research Program, The PennsylvaniaState University, UniversityPark, PA, USA,August, Available athttp://bim.psu.edu.

Figure2:Level2ProcessMap:4DModelling; Source:(Messneretal.,2019)

Followingtheprocessmap,prepare:

  1. The draft schedule using MS Project [note that you will need only appropriate durations for the deliverables].
  2. The draft 4D model (planned) using Navis work

You mustsubmit:

  1. The NWD file which includes the Time liner exercise
  2. Draft schedule in MS Project
  3. 4Dmodel as an AVI file

Reference

Messner, J., Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Leicht, R., Saluja, C., and Zikic, N. (2019). BIM Project Execution Planning Guide, Version 2.2. Computer Integrated Construction Research Program, The Pennsylvania State University, University Park, PA, USA, August, Available athttp://bim.psu.edu.

Markingrubrics

Question Number

Performanceindicators

Qualitative feedback

Verypoor

Poor

Satisfactory

Good

Excellent

Question1

(50marks)

Preliminaryanddesign development3Dmodelscreatedatthe required LOD (25 marks); 10 for preliminary and 15 for design development

?

?

?

?

?

Preliminaryanddesign developmentfloorplanssubmittedatthe required LOD (12 marks)

?

?

?

?

?

Preliminary costestimates,andpreliminary and design developmentroom schedules satisfy the EIRs (13 marks)

?

?

?

?

?

Question2

(25marks)

Clashtestsaredesignedlogically(10marks)

?

?

?

?

?

Clashtestmanagement iscomplete (10marks)

?

?

?

?

?

Clash reports are produced in HTML with necessaryparametersrequiredfordesign amendments (05 marks)

?

?

?

?

?

Question Number

Performanceindicators

Qualitative feedback

Verypoor

Poor

Satisfactory

Good

Excellent

Question3

(25marks)

Draft schedule in MS Project has necessary parameterstocreate4Dmodel(planned)(05 marks)

?

?

?

?

?

Draft construction simulation is established in TimelinerwiththeaidoftheMSprojectfile(15 marks)

?

?

?

?

?

4DmodelisimportedtoAVItoenhance interoperability (05 marks)

?

?

?

?

?

  • Uploaded By : Nivesh
  • Posted on : May 19th, 2025
  • Downloads : 0
  • Views : 138

Order New Solution

Can't find what you're looking for?

Whatsapp Tap to ChatGet instant assistance

Choose a Plan

Premium

80 USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 50 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

20 USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more