Manage Innovation & Improvement BSBSTR601
- Subject Code :
BSBSTR601
|
StudentIDNo |
|
|
StudentName |
|
|
UnitCode |
BSBSTR601 |
|
UnitTitle |
Manage innovation and continuous improvement |
AssessorUseOnlyInitial Submission Re-Submission
|
Please attachthefollowingdocumentationtothissheet |
Assessment Outcome |
Re Assessment Outcome |
||||||
|
Assessment1 |
Knowledge Questions |
S |
NYS |
NA |
S |
NYS |
NA |
|
|
Assessment2 |
Project |
S |
NYS |
NA |
S |
NYS |
NA |
|
|
FinalAssessmentResultforthisunit: C /NYC |
||||||||
|
Comments:
|
|
Assessor: Ideclare thatI haveconducted afair, valid,reliable andflexibleassessmentwiththis student,and Ihave provided appropriatefeedback. Assessor Name: Signature: Date: |
|
Student Declaration: I declare that I have been assessed in this unit, and I have been advised of my result. I am also aware of my appeal rights. Name: Signature Date: |
BSBSTR601
Manage innovation and continuous improvement
Assessment Tool
|
Assessment Resource Summary |
||
|
Assessment Type |
This is a summative assessment, which requires the assessment to be conducted in conditions that are safe and replicate the workplace |
|
|
Assessment Tasks |
Assessment Task 1 |
Knowledge Questions |
|
Assessment Task 2 |
Project |
|
|
Assessment Cover Sheet Please complete cover sheet clearly and accurately for assessment tasks and other types of evidence you submit for your course. All student assessment tasks submissions including any associated checklists where applicable, are to be attached to this cover sheet. |
Student Use
|
Student ID No |
|
|
Student Name |
|
|
Unit Code |
BSBSTR601 |
|
Unit Title |
Manage innovation and continuous improvement |
|
Assessment No. |
1 |
|
Assessment Method |
Knowledge Questions |
|
Initial Submission Re-Submission |
|
|
Student DeclarationI declare that: |
|
|
These tasks are my own work. None of this work has been completed by any other person These tasks are not plagiarised or colluded with any other student/s. I have correctly referenced all resources and reference texts throughout these assessment tasks. |
I have read and understood NTCAs policy on Plagiarism, cheating and collusion and understand that if I am found to be in breach of this policy, disciplinary action may be taken against me by NTCA. I have a copy of my assessment work with me, which I can produce if the original is lost. |
|
Student Signature: |
Submission Date: |
Assessor Use Only
|
Outcome |
|
Satisfactory / Not Yet Satisfactory |
Assessor Feedback:
|
Assessor Name: |
Signature:Date:
|
Student Submission Receipt:Your submission has been received. Please keep a copy of this record.
Student ID & Name: .... Submission Date:...
Unit Code: ..Assessment No & Method:......
Initial Submission Re-Submission
Received By (Name):..Signature:....Date:....
The results will be updatedwithin twenty-one (21) days from your final submission. Please check your student portal regularly to make sure that your results are updated. If there are any discrepancies, please discuss with the Trainer/Student Support Officer.
Assessment Task 1: Knowledge Questions
|
Task instructions |
|
This is an individual assessment. The purpose of this assessment task is to assess the students knowledge essential to work and communicate effectively in an ICT environment in a range of contexts and industry settings. To make full and satisfactory responses you should consult a range of learning resources, other information such as handouts and textbooks, learners resources and slides. All questions must be answered in order to gain competency for this assessment. You may attach a separate sheet if required. You must include the following particulars in the footer section of each page of the attached sheets: oStudent ID or Student Name oUnit ID or Unit Code oCourse ID or Course Code oTrainer and assessor name oPage numbers This is the first (1) unit assessment task you have to successfully complete to be deemed competent in this unit of competency. The Unit Knowledge Test is comprised of twenty-two (22) Knowledge Questions. You must respond to all questions and submit them to your Trainer/Assessor. You must answer all questions to the required level, e.g. provide the number of points, to be deemed satisfactory in this task. |
Short Answer Questions
|
Question 1 |
|
|
Identify two methods of cost-benefit analysis. Briefly explain when each method should be used. |
|
|
Method |
Explanation of When Each Method is Used |
|
a.????? |
????? |
|
b.????? |
????? |
|
|
||
|
Define knowledge management systems and provide at least two examples of knowledge management systems used in an organisation. |
||
|
a.Definition of knowledge management systems |
||
|
????? |
||
|
b.Two examples of knowledge management systems |
||
|
i.????? |
||
|
ii.????? |
||
|
Question 3 |
|
|
Outlined below are two creativity and innovation theories. Briefly explain each theory. |
|
|
Creativity and Innovation Theory |
Brief Explanation of the Theory |
|
a.Incremental innovation |
????? |
|
b.Disruptive innovation |
????? |
|
Question 4 |
|
Not every new idea or product or method can be termed as an innovation. List the four key tenets of innovation. |
|
a.????? |
|
b.????? |
|
c.????? |
|
d.????? |
|
Question 5 |
|
|
List and define in your own words any three learning principles in an organisation. |
|
|
Learning Principle |
Definition |
|
a.????? |
????? |
|
b.????? |
????? |
|
c.????? |
????? |
|
Question 6 |
|
|
Outlined below are three different objectives of an organisation. Identify the most appropriate quality management and continuous improvement theory to meet that objective and briefly explain why this theory is the most appropriate. |
|
|
Organisational Objective |
Quality Management and Continuous Improvement Theory |
|
a.Minimise variance (variation) in time taken for forms processing |
????? |
|
Explanation |
|
|
????? |
|
|
b.Reduce wastage on the production floor |
Quality Management and Continuous Improvement Theory |
|
????? |
|
|
Explanation |
|
|
????? |
|
|
c.Implement continuous improvement across the entire organisation |
Quality Management and Continuous Improvement Theory |
|
????? |
|
|
Explanation |
|
|
????? |
|
|
Question 7 |
|
|
Identify and define any two key risk categories relevant to innovation and continuous improvement in an organisation. |
|
|
Risk Category |
Risk Definition |
|
a.????? |
????? |
|
b.????? |
????? |
|
Question 8 |
||
|
Outlined below are core internal systems in an organisation. For each of these systems, identify and define at least two key aspects based on which improvements can be defined and measured for each of them. |
||
|
Internal Systems |
Key Aspects |
Definition |
|
a.Supply Chains |
i.????? |
????? |
|
ii.????? |
????? |
|
|
b.Operational Systems |
i.????? |
????? |
|
ii.????? |
????? |
|
|
c.Product Systems |
i.????? |
????? |
|
ii.????? |
????? |
|
|
i.Service Systems |
i.????? |
????? |
|
ii.????? |
????? |
|
|
Question 9 |
|
|
Outline and explain the five steps for conducting gap analysis. |
|
|
Step |
Explanation |
|
i.????? |
????? |
|
ii.????? |
????? |
|
iii.????? |
????? |
|
iv.????? |
????? |
|
v.????? |
????? |
Assessor Checklist: Assessment Task 1 (Knowledge Questions)
|
Questions |
Satisfactory |
|
Q1. |
rYes rNo |
|
Q2. |
rYes rNo |
|
Q3. |
rYes rNo |
|
Q4. |
rYes rNo |
|
Q5. |
rYes rNo |
|
Q6. |
rYes rNo |
|
Q7. |
rYes rNo |
|
Q8. |
rYes rNo |
|
Q9. |
rYes rNo |
|
Moodle Quiz Questions completed online or verbally |
rYes rNo |
|
Assessment Cover Sheet Please complete cover sheet clearly and accurately for assessment tasks and other types of evidence you submit for your course. All student assessment tasks submissions including any associated checklists where applicable, are to be attached to this cover sheet. |
Student Use
|
Student ID No |
|
|
Student Name |
|
|
Unit Code |
BSBSTR601 |
|
Unit Title |
Manage innovation and continuous improvement |
|
Assessment No. |
2 |
|
Assessment Method |
Project |
|
Initial Submission Re-Submission |
|
|
Student DeclarationI declare that: |
|
|
These tasks are my own work. None of this work has been completed by any other person These tasks are not plagiarised or colluded with any other student/s. I have correctly referenced all resources and reference texts throughout these assessment tasks. |
I have read and understood NTCAs policy on Plagiarism, cheating and collusion and understand that if I am found to be in breach of this policy, disciplinary action may be taken against me by NTCA. I have a copy of my assessment work with me, which I can produce if the original is lost. |
|
Student Signature: |
Submission Date: |
Assessor Use Only
|
Outcome |
|
Satisfactory / Not Yet Satisfactory |
Assessor Feedback:
|
Assessor Name: |
Signature:Date:
|
Student Submission Receipt:Your submission has been received. Please keep a copy of this record.
Student ID & Name: .... Submission Date:...
Unit Code: ..Assessment No & Method:......
Initial Submission Re-Submission
Received By (Name):..Signature:....Date:....
The results will be updatedwithin twenty-one (21) days from your final submission. Please check your student portal regularly to make sure that your results are updated. If there are any discrepancies, please discuss with the Trainer/Student Support Officer.
|
Task instructions |
|
This is the second (2) assessment task you have to successfully complete to be deemed competent in this unit of competency. This assessment task requires you to complete a project. You will receive your feedback within two weeks - you will be notified by your trainer/assessor when results are available. You must attempt all activities of the project for your trainer/assessor to assess your competency in this assessment task |
Practical Assessment
|
ThePractical Assessmentis a set of tasks that must be completed in a workplace, or in an environment with conditions similar to that of a real workplace. To be assessed for this unit of competency, you must demonstrate your skills and knowledge to sustain and develop an environment in which continuous improvement, innovation and learning are promoted and rewarded. The Practical Assessments in this workbook include: 1.Workplace Project Assessment A series of written practical tests assessing the learners practical knowledge and skills underpinning of the unit of competency. This includes the learner completing workplace documents or similar as evidence of competent performance. 2.Workplace Practical Observation A set of assessment tasks where the learner must demonstrate practical skills relevant to the unit of competency. These skills are to be demonstrated while being observed by the assessor. IMPORTANT! All signatures/initials in your submissions, including yours, must be handwritten and dated. Submissions with signatures/initials must be scanned. The supervisor/observer who completes and signs your evidence submissions must provide their real name, contact number, and email address for your assessors reference. Should you encounter issue or concerns regarding your assessment, contact your assessor. |
|
This workplace project assessment requires you to manage and promote innovation and continuous improvement for an organisation or work area on at least one occasion. This assessment is divided into eleven tasks: Task 1 Prepare Innovation and Continuous Improvement Fact Sheet Task 2: Identify Improvement Opportunities Task 3: Coach Team in Innovation and Continuous Improvement Task 4: Mentor Team in Innovation and Continuous Improvement Task 5:Prepare Innovation and Continuous Improvement Opportunities Report Task 6: Confirm Innovation and Continuous Improvement Opportunities with Team Task 7: Implement Innovative Processes Task 8: Analyse Failures and Manage Learnings Task 9: Evaluate Innovation and Continuous Improvement Systems and Processes Task 10: Respond to Innovation and Continuous Improvement Feedback Task 11: Establish a Rewards Programme This project requires you to complete the assessment tasks in a workplace or simulated environment where the conditions are typical of those in a working environment in this industry. Each task comes with a set of instructions. You are to follow and perform these instructions while being observed by the assessor and/or submit any required documentation. Before starting this assessment, your assessor will discuss with you these tasks, including instructions and guidance for satisfactorily completing them. |
|
You are required to: Complete the tasks within the time allowed, as scheduled in-class roll. Identify opportunities for improvement. Consult with stakeholders. Promote the value of creativity, innovation and sustainability and recognising successes. Support testing and trialling of new ideas. Undertake risk management and cost-benefit analysis for options. Plan for and implement improvements using organisations processes for approvals, project management and change management. Facilitate contributions to and communications about continuous improvement and innovation. Capture insights, experiences and ideas for improvements and incorporate them into the organisations knowledge management systems and future planning. Resources Required for Assessment Resources you need to access to complete the project assessment are outlined in theResources Required for Assessmentsection of this workbook, and in the correspondingAssessors Checklist and/or Observation Formof each task. Discuss each requirement with your assessor before commencing with each task.They will organise the resources required for this assessment. IMPORTANT: Additional workplace resources may be required upon the contextualisation of this assessment. Forms and Templates Generic forms and templates are provided in the project tasks, unless otherwise specified. These can be accessed from the following link: If you are currently in a workplace, use similar workplace templates and forms used by your organisation to complete each assessment task. Discuss with your supervisor and your assessor first to ensure that the forms/templates you will use from your organisation cover all criteria required by each assessment task. Review these forms and templates with your assessor before starting the task. |
Task 1: Prepare Innovation and Continuous Improvement Fact Sheet
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to prepare an Innovation and Continuous Improvement Fact Sheet, incorporating strategies for performance evaluation and monitoring of two key systems and two processes, and identifying at least two team members who use the systems and processes. Use your workplace/organisations template to complete this task or use the genericInnovation and Continuous Improvement Fact Sheettemplate, provided at the Bounce Fitness site. You will use this information to completeWorkplace Project Tasks 3, 4, 5 and 6. To complete this task, you must: Access and review organisational requirements relevant to key systems and processes in the organisation and their performance objectives. These can include: Organisational documents related to the systems and processes Relevant personnel who are owners or managers of the systems and processes Performance reports related to the systems and processes Key systems in the organisation refer to the systems used by the organisation to operate and manage their core business functions, such as the Human Resource Information System or Customer Relationship Management system. Key processes in the organisation refer to business processes or workflows that are implemented to meet the organisations business goals and requirements, such asthe procurement process or the employee recruitment process. Identify two key systems and two key processes in the organisation List the key objectives established by the organisation relevant to each of the identified systems and processes. Key objectives must include: oAt least one performance objective, such as improving employee productivity or enhanced customer experience oAt least one sustainability objective, such as minimising resource use or improving resource efficiency Identify and establish the strategy to evaluate the systems and processes against the key objectives Identify and establish the strategy and schedule to monitor the systems and processes, against the key objectives Identify at least two team members who use these systems and processes, to be mentored and coached on innovation and continuous improvement |
|
oWays of working oInnovation and continuous improvement objectives oExpectations oDesired outcomes Access and review your organisations style guide Prepare an Innovation and Continuous Improvement Fact Sheet incorporating the above, in accordance with organisational style guides to suit the audience of internal stakeholders ReviewWorkplace Project Task 1 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use the provided genericInnovation and Continuous Improvement Fact Sheettemplate provided at the Bounce Fitness site. Submit the completed Innovation and Continuous Improvement Fact Sheet to your assessor. Include any supplementary documents/sources used to create the Innovation and Continuous Improvement Fact Sheet, such as the organisational style guide. You must also submit evidence of email communication with the identified team members on: Ways of working Innovation and continuous improvement objectives Expectations Desired outcomes |
|
INNOVATION AND CONTINUOUS IMPROVEMENT FACT SHEET |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
|
Date Prepared |
????? |
SYSTEMS AND PROCESSES KEY OBJECTIVES
|
Key Systems Indicate the name and a brief description of the system. |
Performance Objective |
Sustainability Objective |
|
1.????? |
????? |
????? |
|
2.????? |
????? |
????? |
|
Key Processes Indicate the name and a brief description of the process. |
Performance Objective |
Sustainability Objective |
|
a.????? |
????? |
????? |
|
b.????? |
????? |
????? |
EVALUATION AND MONITORING STRATEGIES
|
Evaluation Strategy |
||
|
Strategy |
????? |
|
|
Established Date |
????? |
|
|
Evaluation Metrics |
Performance |
Sustainability |
|
????? |
????? |
|
|
Evaluation Tools/Methods |
????? |
|
|
Outcome |
????? |
|
|
Monitoring Strategy |
|||||
|
Established Date |
????? |
||||
|
Monitoring Schedule (select any one) |
Daily |
Weekly |
Monthly |
Annual |
Other (please specify) ????? |
|
Outcome |
????? |
||||
TEAM MEMBERS
|
Member 1 Details |
|||
|
Name |
????? |
||
|
Contact Information |
????? |
||
|
User Role List the relevant system or process that this team member uses, from the table above and their role/function for that system/process. |
|||
|
System/Process Used by Team Member |
Team Members Role for the System/Process |
||
|
????? |
????? |
||
|
Communication to Team Member |
|||
|
Ways of Working |
????? ????? |
||
|
Key Objectives |
????? ????? |
||
|
Expectations |
????? ????? |
||
|
Desired Outcomes |
????? ????? |
||
|
Member 2 Details |
|||
|
Name |
????? |
||
|
Contact Information |
????? |
||
|
User Role List the relevant system or process that this team member uses, from the table above and their role/function for that system/process. |
|||
|
System/Process Used by Team Member |
Team Members Role for the System/Process |
||
|
????? |
????? |
||
|
Communication to Team Member |
|||
|
Ways of Working |
????? ????? |
||
|
Key Objectives |
????? ????? |
||
|
Expectations |
????? ????? |
||
|
Desired Outcomes |
????? ????? |
||
Task 2: Identify Improvement Opportunities
|
ASSESSMENT INSTRUCTIONS |
|
Your assessor will observe you as you conduct a meeting to consult with and seek advice from relevant internal stakeholders to identify at least two improvement opportunities for the organisational systems and processes fromWorkplace Project Task 1. Relevant internal stakeholders are individuals or groups associated with the selected organisational systems and processes through their roles and responsibilities. Internal stakeholders may include but are not limited to: Management Team leaders Technical experts System or process users Improvement opportunities may be identified for the systems and processes identified in Workplace Project Task 1 or other key systems or processes in the organisation. Use your workplace/organisations template to complete this task or use the genericMeeting Minutestemplate provided at the Bounce Fitness site. You will be assessed on your practical skills to: Set the context and expected outcome from the meeting based on the information in Innovation and Continuous Improvement Fact Sheet fromWorkplace Project Task 1. Consult and seek advice from stakeholders through the course of this meeting Facilitate effective group interaction between the stakeholders during the meeting to identify and prioritise ideas and areas of improvement, relevant to the systems and processes Identify and decide on at least two improvement opportunities |
|
Workplace Project Task 2 Assessors Checklist Workplace Project Task 2 Observation Form These forms outline the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. All practical skills you need to demonstrate to satisfactorily complete the observation task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use theMeeting Minutestemplate provided at the Bounce Fitness site. Submit the completed Meeting Minutesto your assessor. |
|
MEETING MINUTES |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
[MEETING TITLE]
|
Date |
????? |
Time |
????? |
Meeting Location |
????? |
||
|
Purpose of meeting |
????? |
||||||
|
Facilitator |
????? |
||||||
|
Notetaker |
????? |
||||||
|
Attendees |
Attendees must sign beside their name after the meeting. ????? |
||||||
|
Review of Previous Action Items Write NA or Nil if not applicable for this meeting. |
|||||||
|
Action Items |
Person Responsible |
Remarks |
|||||
|
????? |
????? |
????? |
|||||
|
????? |
????? |
????? |
|||||
|
????? |
????? |
????? |
|||||
|
|
|||||||
|
Discussion |
|||||||
|
????? |
|||||||
|
Agenda Item 2:[Topic] |
|
Discussion |
|
????? |
|
Agenda Item 3:[Topic] |
|
Discussion |
|
????? |
Add more sections as necessary.
WORKPLACE PROJECT TASK 2 OBSERVATION FORM
Learner Details
|
Learner Name |
????? |
|
Title/Designation |
????? |
Assessor/Observer Details
|
Assessor/Observer Name |
????? |
|
Training Organisation |
????? |
|
Relevant Qualifications Held |
????? |
Assessment Context
|
Assessment Environment |
oLearners Workplace |
oSimulated Workplace |
|
Mode of Observation |
oDirect Observation Assessor must be physically present in the assessment environment. |
|
|
oObservation via video recording Learner and the assessment requirements must be present in the video recording. |
||
|
Workplace/Organisation |
????? |
|
|
State/Territory |
????? |
|
|
Resources required for assessment |
Minutes of Meetingtemplate, or similar from the learners workplace/organisation Innovation and Continuous Improvement Fact Sheet,created fromWorkplace Project Task 1 At least one relevant internal stakeholder for each relevant system and process Relevant internal stakeholders are individuals or groups associated with the selected organisational systems and processes through their roles and responsibilities. Internal stakeholders include: Management Team leaders Technical experts System or process users Improvement opportunities may be identified for the systems and processes identified in Workplace Project Task 1 or other key systems or processes in the organisation. Opportunity for learner to meet with the internal stakeholders, to consult with and seek advice from to identify improvement opportunities Meeting may be conducted in a physical or virtual (online) environment. |
Learner Assessment Briefing
|
Date of assessment briefing |
????? |
|
The assessor confirms: |
YES/NO |
|
1.They have discussed with the learner the workplace task they are required to complete for this assessment. |
oYES oNO |
|
2.They have discussed with the learner the resources they are required to access to complete the workplace task. |
oYES oNO |
|
3.The learner understands they will be assessed while completing this workplace task, as well as any document(s) they will complete as part of this task. |
oYES oNO |
|
4.They have discussed with the learner the instructions on how they are to undertake the workplace task. |
oYES oNO |
|
5.They have provided the learner guidance on how they can satisfactorily complete the task. |
oYES oNO |
|
6.They have discussed with the learner the practical skills (outlined below) they are required to meet to satisfactorily complete the task. |
oYES oNO |
|
7.They have addressed the learners questions or concerns about the workplace task and the assessment process. |
oYES oNO |
|
ASSESSORS CHECKLIST |
||
|
During the meeting with the internal stakeholders, learner: |
YES/NO |
Assessors comments |
|
1.Describes the purpose of the meeting. Learner must mention that the purpose of the meeting is to consult and seek advice from the stakeholders to identify improvement opportunities. |
oYES oNO |
????? |
|
2.Discusses the target outcome of the meeting. Learner must mention that the target outcome of the meeting is to identify at least two improvement opportunities for the systems and processes in scope. |
oYES oNO |
????? |
|
3.Discusses relevant information in the Innovation and Continuous Improvement Fact Sheet including: |
oYES oNO |
????? |
|
a.Key systems and processes identified |
oYES oNO |
????? |
|
b.Performance objectives for the key systems and processes |
oYES oNO |
????? |
|
c.Sustainability objectives for the key systems and processes |
oYES oNO |
????? |
|
If the systems and processes in scope for this task are different from those identified in the Innovation and Continuous Improvement Fact Sheet, the learner must discuss all of the above for the new systems and processes identified for this task. |
||
|
4.Consults and seeks advice from the internal stakeholders about each system and process. In demonstrating this, learner: |
oYES oNO |
????? |
|
a.Frames questions appropriately Learners questions must be relevant to the purpose of identifying opportunities for improvement, such as questions about: Current challenges faced in using or managing the systems or processes Best practices or relevant learnings from the stakeholders experience |
oYES oNO |
????? |
|
b.Uses active listening skills to elicit views of internal stakeholders regarding the topic discussed. During the meeting, learner: |
oYES oNO |
????? |
|
Refrains from interrupting the person speaking Focuses on the words spoken by the other person Uses appropriate facial expressions such as nodding or smiling to show that they are listening Summarises discussion point or questions from speaker to confirm understanding Provides relevant responses to the persons questions Suspends judgment when the person answers a question or provides their opinion on the topic |
oYES oNO |
????? |
|
5.Identifies two opportunities for improvement to address the purpose of the meeting. This must take into consideration the evaluation of ideas and advice during the meeting. Two opportunities must be identified, which may both be for one or more of the systems and processes discussed and includes: Automation to improve process efficiency Alternate supplier identification to reduce cost of material |
oYES oNO |
????? |
|
6. In demonstrating this, learner: |
oYES oNO |
????? |
|
Uses words that show interest in understanding the stakeholders problems and ideas Speaks in a polite and professional manner, such as using: Intonation that doesnt sound rude or aggressive Indirect language, such as Could you instead of can you; Would it be alright if instead of Can I Please and Thank you when requesting something from the stakeholder Injects humour that is non-derogatory or judgmental to lighten the mood of the conversation |
oYES oNO |
????? |
|
7.Takes into account the audience, purpose and contextual factors during the meeting In demonstrating this, learner: |
oYES oNO |
????? |
|
a.Uses respectful communication to demonstrate consideration of the needs of those from diverse backgrounds, such as: Avoids use of slang, idioms and jargon Clarifies that information shared is sufficiently understood. Avoids referencing to a culture by mentioning someones race, cultures, ethnic group, etc. Uses supplementary gestures or sign language to support verbal communication, if necessary |
oYES oNO |
????? |
|
b.Examines all suggestions, ideas and advice from stakeholders with the focus on determining opportunities for improvement |
oYES oNO |
????? |
|
|
c.Evaluates the suggestions, ideas and advice from stakeholders in the context of the performance and sustainability objectives discussed earlier |
oYES oNO |
????? |
|
|
8.Collaborates with the stakeholders to achieve joint outcomes In demonstrating this, learner: |
oYES oNO |
????? |
|
|
Suggests possible ideas for improvement in response to stakeholders inputs on current challenges and problems in using or managing the systems or processes Provides relevant examples of improvement opportunities for similar systems or processes or challenges |
oYES oNO |
????? |
|
|
9.Encourages improvement and innovation ideas and discussions In demonstrating this, learner: |
oYES oNO |
????? |
|
|
Guides the discussion around improvement and innovation ideas Supports further dialogue of ideas for improvement or innovation |
oYES oNO |
????? |
|
|
10.Facilitates effective group interaction. In demonstrating this, the learner: |
oYES oNO |
????? |
|
|
Allows others to ask questions or clarify their understanding Encourages discussions and brainstorming between the stakeholders to identify improvement opportunities |
oYES oNO |
????? |
|
|
By signing here, I confirm that I have observed the candidate, whose name appears above: Consult and seek advice from internal stakeholders Identify at least two improvement opportunities I confirm that the information recorded on thisObservation Formis true and accurately reflects the learners performance during their completion of the workplace task. |
|||
|
Assessors signature |
????? |
||
|
Assessors name |
????? |
||
|
Date signed |
????? |
||
Task 3: Coach Team in Innovation
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to provide coaching about innovation to the team members identified in the Innovation and Continuous Improvement Fact Sheet fromWorkplace Project Task 1. To complete this task, you must: Access and review the following documents: oOrganisational policies and procedures on coaching team members oPrinted or online sources relevant to promoting creativity, innovation, sustainability, recognising successes and coaching team members Conduct meeting with team members identified in Innovation and Continuous Improvement Fact Sheet, fromWorkplace Project Task 1 Coach at least two team members on how they can be innovative Promote the value of creativity, innovation, sustainability, and recognising successes ReviewWorkplace Project Task 3 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Submit evidence of coaching at least two team members to your assessor. Evidence must be at least one of the following: Email correspondence Meeting minutes Certificate of completion where coaching is performed through training workshops Include any supplementary documents/sources used to complete this task, such as: Organisational policies and procedures relevant to coaching Printed or online sources relevant to promoting creativity, innovation, sustainability, recognising successes and coaching team members |
Task 4: Mentor Team in Continuous Improvement
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to conduct two mentoring sessions about continuous improvement with team members identified in Innovation and Continuous Improvement Fact Sheet fromWorkplace Project Task 1. To complete this task, you must: Access and review the following documents: oOrganisational policies and procedures on mentoring team members oPrinted or online sources relevant to promoting creativity, innovation, sustainability, recognising successes and coaching team members Conduct two mentoring sessions with team members identified in Innovation and Continuous Improvement Fact Sheet, fromWorkplace Project Task 1 Mentor team on ways of working that contribute to continuous improvement Promote the value of creativity, innovation, sustainability, and recognising successes ReviewWorkplace Project Task 4 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Submit evidence of mentoring at least two team members to your assessor. Evidence must be at least one of the following: Email correspondence Meeting minutes Include any supplementary documents/sources used to complete this task, such as: Organisational policies and procedures relevant to mentoring Printed or online sources relevant to promoting creativity, innovation, sustainability, recognising successes and mentoring team members |
Task 5: Prepare Innovation and Continuous Improvement Opportunities Report
|
ASSESSMENT INSTRUCTIONS |
|
|
This task will require you to analyse performance reports and changing trends and opportunities, perform gap analysis, risk management and cost-benefit analysis, and prepare an Innovation and Continuous Improvement Opportunities Report or similar evidence of your analysis. Use your workplace/organisations template to complete this task, or use the genericInnovation and Continuous Improvement Opportunities Reporttemplate provided at the Bounce Fitness site. To complete this task, you must: Part A. Analyse performance reports and changing trends and opportunities To complete this task, you must: Access and review in your organisation: oTwo performance reports for systems and processes related to supply chain, operational systems and service systems The systems and processes must be the same as identified in the Innovation and Continuous Improvement Fact Sheet from Workplace Project Task 1 If performance reports and organisational plans are not available for the systems and processes from the Innovation and Continuous Improvement Fact Sheet, you may use any two available performance reports and organisational plans instead. The systems or processes identified in the Innovation and Continuous Improvement Opportunities Report may, therefore vary from those in the Innovation and Continuous Improvement Fact Sheet. oOrganisational plans corresponding to these performance reports The performance reports and organisational plans must refer to the same system or process. oReports on changing trends and opportunities Analyse the two performance reports for variance against the corresponding organisational plans. Identify whether the system or process is relevant to supply chain, operational system and service system. |
|
|
Identify and analyse changing trends and opportunities related to the systems and processes from the previous step. This will require you to: oGather trend and opportunity data from internal and external sources Internal data sources are within the workplace and may include organisational plans and similar documents or internal stakeholders. External data sources may include but are not limited to social media, competitor performance reports or opinions of industry influencers. oMap the trends that are relevant to your organisation and the systems and processes oAnalyse the various scenarios and impact of changing trends and map the scenarios to customer or user needs Complete the following sections of Innovation and Continuous Improvement Opportunities Report incorporating the above oPerformance Variance Analysis oTrends and Opportunities Analysis Part B. Collect data and analyse areas for improvement, and perform gap analysis, risk management and cost-benefit analysis To complete this task, you must: Access and review your organisations: oRisk management policies and procedures including the Risk Rating Matrix Use your workplace/organisations Risk Rating Matrix to complete this task, or use the genericRisk Rating Matrixprovided at the Bounce Fitness site. oProcesses for approvals and project management Collect data and analyse areas for improvement in supply chains, operational systems and service systems Refer to the systems and processes identified in Part A of this task. Conduct a gap analysis of the above and identify improvement needs and opportunities This will require you to: oBaseline current state performance against the organisation performance objectives oAnalyse the gaps and their underlying causes |
|
Identify at least one improvement need and opportunity for each system or process analysed Undertake risk management and cost-benefit analysis for identified improvement opportunities This will require you to: oIdentify and prioritise the risks oDevelop contingency plans mapped to the risks oDefine a solution for at least two improvement opportunities oDefine all costs and benefits associated with the solution oImplement cost-benefit analysis Complete the following sections of Innovation and Continuous Improvement Opportunities Report incorporating the above oAreas for Improvement oGap Analysis oRisk Assessment oCost-Benefit Analysis ReviewWorkplace Project Task 5 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use theInnovation and Continuous Improvement Opportunities Reporttemplate provided at the Bounce Fitness site. |
|
Submit the completed Innovation and Continuous Improvement Opportunities Report to your assessor. Include any supplementary documents/sources used to create the Innovation and Continuous Improvement Opportunities Report, such as: Copies of two performance reports in the organisation for systems and processes related to supply chain, operational systems and service systems Copies of two organisational plans, corresponding to the performance reports in the previous point Organisational Reports on changing trends and opportunities Printed or online sources relevant tochanging trends Sources of data about each system or process to identify area for improvement Organisational risk management policies and procedures Organisations processes for approvals and project management Risk Rating Matrix, when using a Risk Rating Matrix different from the one provided at the Bounce Fitness site. |
|
RISK RATING MATRIX |
|||||
|
Likelihood (L) |
Impact (I) |
||||
|
Insignificant 1 |
Minor 2 |
Moderate 3 |
Major 4 |
Severe 5 |
|
|
Rating |
|||||
|
A.Almost certain |
High (H) |
High (H) |
Critical I |
Critical I |
Critical I |
|
B.Likely |
Moderate (Mo) |
High (H) |
High (H) |
Critical I |
Critical I |
|
C.Possible |
Low (L) |
Moderate (Mo) |
High (H) |
Critical I |
Critical I |
|
D.Unlikely |
Low (L) |
Low (L) |
Moderate (Mo) |
High (H) |
Critical I |
|
E.Rare |
Low (L) |
Low (L) |
Moderate (Mo) |
High (H) |
High (H) |
RISK RATING INTERPRETATION
|
Likelihood (L) |
Impact (I) |
||
|
A.Almost certain |
Is expected to occur in most circumstances |
1. Insignificant |
Nearly negligible but does not really affect the overall progress of the project |
|
B.Likely |
Will probably occur in most circumstances |
2. Minor |
Results into damage but will not likely affect the overall progress of the project |
|
C.Possible |
Could occur at some time |
3. Moderate |
Results into damage but do not pose a great threat to the project |
|
D.Unlikely |
Not likely to occur in normal circumstances |
4. Major |
Risks are significant and can lead to a great amount of project loss |
|
E.Rare |
May occur only in exceptional circumstances |
5. Severe |
Project may be completely unproductive and unfruitful |
|
Risk Priority Scale |
||
|
Risk Rating |
Risk Priority |
Description |
|
1 3 |
L |
Low: May require consideration in any future changes to the work area or processes, or can be fixed immediately. |
|
4 6 |
M |
Moderate: May require corrective action through planning and budgeting process. |
|
8 12 |
H |
High: Requires immediate corrective action. |
|
15 25 |
E |
Extreme: Requires immediate prohibition of the work process and immediate corrective action. |
|
INNOVATION AND CONTINUOUS IMPROVEMENT OPPORTUNITIES REPORT |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
|
Date Prepared |
????? |
PERFORMANCE VARIANCE ANALYSIS
|
Performance Variance Analysis 1 |
|||
|
System / Process Name |
????? |
||
|
System / Process Type |
Supply Chain |
Operational System |
Service System |
|
Documents Analysed |
|||
|
Performance Report |
Name: ????? Date: ????? |
||
|
Organisational Plan |
Name: ????? Date: ????? |
||
|
Variance Analysis |
|||
|
Amount of Variance |
????? |
||
|
Cause of Variance Analyse and explain the reason for variance, for example objectives were mapped incorrectly. |
????? |
||
|
Performance Variance Analysis 2 |
|||
|
System / Process Name |
????? |
||
|
System / Process Type |
Supply Chain |
Operational System |
Service System |
|
Documents Analysed |
|||
|
Performance Report |
Name: ????? Date: ????? |
||
|
Organisational Plan |
Name: ????? Date: ????? |
||
|
Variance Analysis |
|||
|
Amount of Variance |
????? |
||
|
Cause of Variance Analyse and explain the reason for variance, for example objectives were mapped incorrectly. |
????? |
||
TRENDS AND OPPORTUNITIES ANALYSIS
|
|
Description Briefly describe two trends and two opportunities and the source of information |
Organisational Relevance Explain how the trend / opportunity is relevant to your organisation |
System / Process Relevance Explain how the trend / opportunity is relevant to your organisations key systems and processes |
Trend / Opportunity Analysis |
|
|
Internal Impact Analysis Analyse impact on internal systems or processes if the trend / opportunity becomes stronger and weaker |
External Impact Analysis Analyse impact on customers, suppliers, partners, etc. if the trend / opportunity becomes stronger and weaker |
||||
|
Trends |
a.????? |
????? |
????? |
i.????? ii.????? |
????? ????? |
|
b.????? |
????? |
????? |
i.????? ii.????? |
????? ????? |
|
|
Opportunities |
a.????? |
????? |
????? |
i.????? ii.????? |
????? ????? |
|
b.????? |
????? |
????? |
i.????? ii.????? |
????? ????? |
|
Add more rows as necessary.
AREAS FOR IMPROVEMENT
|
Supply Chain |
||
|
System / Process Name |
????? |
|
|
Data Source Mention how primary and secondary data was collected. |
Primary Data ????? |
Secondary Data ????? |
|
Improvement Area |
????? |
|
|
Improvement Analysis |
????? |
|
|
Operational System |
||
|
System / Process Name |
????? |
|
|
Data Source Mention the details for primary and secondary data collected. |
Primary Data ????? |
Secondary Data ????? |
|
Improvement Area |
????? |
|
|
Improvement Analysis |
????? |
|
|
Service System |
||
|
System / Process Name |
????? |
|
|
Data Source Mention the details for primary and secondary data collected. |
Primary Data ????? |
Secondary Data ????? |
|
Improvement Area |
????? |
|
|
Improvement Analysis |
????? |
|
GAP ANALYSIS
|
|
System / Process |
Organisation Objective |
Current State Performance |
Improvement Need Identify the performance gap |
Gap Analysis Identify the causes |
Improvement Opportunity Select one cause as the improvement opportunity with explanation |
|
Supply Chain |
????? |
????? |
????? |
????? |
a.????? b.????? |
????? |
|
Operational System |
????? |
????? |
????? |
????? |
a.????? b.????? |
????? |
|
Service System |
????? |
????? |
????? |
????? |
a.????? b.????? |
????? |
RISK ASSESSMENT
|
Risk Description |
Risk Assessment Refer to the Risk Rating Matrix to populate the values below |
Contingency Measure |
|||
|
Likelihood (L) |
Impact (I) |
Risk Rating (R) |
Priority Level |
||
|
a.????? |
????? |
????? |
????? |
????? |
????? |
|
b.????? |
????? |
????? |
????? |
????? |
????? |
Add more rows as necessary.
COST BENEFIT ANALYSIS
|
Improvement Opportunity-1 |
|||||
|
Improvement Opportunity Implementation Approach Outline the key steps to implement the improvement opportunity |
a.????? b.????? c.????? Add more bullets as needed. |
||||
|
Assumptions |
????? |
||||
|
Costs |
|||||
|
Cost Head |
Q1 |
Q2 |
Q3 |
Q4 |
Total per Cost Head |
|
Identify the costs and benefits along with the period when they will occur. Modify the period as applicable. Ensure that the period used for costs matches the period used for benefits below. |
|||||
|
????? |
????? |
????? |
????? |
????? |
????? |
|
????? |
????? |
????? |
????? |
????? |
????? |
|
Total Costs per Period |
????? |
????? |
????? |
????? |
????? |
|
Benefits |
|||||
|
Benefit |
Q1 |
Q2 |
Q3 |
Q4 |
Total per Benefit |
|
????? |
????? |
????? |
????? |
????? |
????? |
|
????? |
????? |
????? |
????? |
????? |
????? |
|
Total Benefits per Period |
????? |
????? |
????? |
????? |
????? |
|
Cost Benefit Analysis |
|||||
|
Total Cost |
????? |
Total Benefit |
????? |
Return on Investment |
????? |
Add more rows as necessary.
|
Improvement Opportunity-2 |
||||||||||
|
Improvement Opportunity Implementation Approach Outline the key steps to implement the improvement opportunity |
a.????? b.????? c.????? Add more bullets as needed. |
|||||||||
|
Assumptions |
????? |
|||||||||
|
Costs |
||||||||||
|
Cost Head |
Q1 |
Q2 |
Q3 |
Q4 |
Total per Cost Head |
|||||
|
Identify the costs and benefits along with the period when they will occur. Modify the period as applicable. Ensure that the period used for costs matches the period used for benefits below. |
||||||||||
|
????? |
????? |
????? |
????? |
????? |
????? |
|||||
|
????? |
????? |
????? |
????? |
????? |
????? |
|||||
|
Total Costs per Period |
????? |
????? |
????? |
????? |
????? |
|||||
|
Benefits |
||||||||||
|
Benefit |
Q1 |
Q2 |
Q3 |
Q4 |
Total per Benefit |
|||||
|
????? |
????? |
????? |
????? |
????? |
????? |
|||||
|
????? |
????? |
????? |
????? |
????? |
????? |
|||||
|
Total Benefits per Period |
????? |
????? |
????? |
????? |
????? |
|||||
|
Cost Benefit Analysis |
||||||||||
|
Total Cost |
????? |
Total Benefit |
????? |
Return on Investment |
????? |
|||||
|
PERSONNEL APPROVALS |
||||||||||
|
|
Objectives |
Timeframes |
Measures |
Communication Plan |
||||||
|
Date |
????? |
????? |
????? |
????? |
||||||
|
Received From |
????? |
????? |
????? |
????? |
||||||
|
Mode of Approval |
????? |
????? |
????? |
????? |
||||||
Task 6: Confirm Innovation and Continuous Improvement Opportunities with Team
|
ASSESSMENT INSTRUCTIONS |
|
Your assessor will observe you as you conduct a team meeting to agree on and communicate improvement needs and opportunities identified in the Innovation and Continuous Improvement Opportunities Report fromWorkplace Project Task 5and identify learning opportunities for team members. Team members must be the same as identified in Innovation and Continuous Improvement Fact Sheet from Workplace Project Task 1. You will be assessed on your practical skills to: Communicate with and agree on identified improvement needs and opportunities in Innovation and Continuous Improvement Opportunities Report fromWorkplace Project Task 5with team members Identify learning opportunities for team members Facilitate contributions to and communications about continuous improvement and innovation ReviewWorkplace Project Task 6 Observation Formbefore starting this task. This form outlines all the practical skills you need to demonstrate to satisfactorily complete this task. Your assessor will also discuss with you the practical skills outlined in this form prior to the assessment. |
WORKPLACE PROJECT TASK 6 OBSERVATION FORM
Learner Details
|
Learner Name |
????? |
|
Title/Designation |
????? |
Assessor/Observer Details
|
Assessor/Observer Name |
????? |
|
Training Organisation |
????? |
|
Relevant Qualifications Held |
????? |
Assessment Context
|
Assessment Environment |
oLearners Workplace |
oSimulated Workplace |
|
Mode of Observation |
oDirect Observation Assessor must be physically present in the assessment environment. |
|
|
oObservation via video recording Learner and the assessment requirements must be present in the video recording. |
||
|
Workplace/Organisation |
????? |
|
|
State/Territory |
????? |
|
|
Resources required for assessment |
Innovation and Continuous Improvement Opportunities Reportsubmitted by the learner fromWorkplace Project Task 5 At least two team members, as identified in the Innovation and Continuous Improvement Fact Sheet fromWorkplace Project Task 1. Opportunity for learner to meet with the team members Meeting may be conducted in a physical or virtual (online) environment. |
Learner Assessment Briefing
|
Date of assessment briefing |
????? |
|
The assessor confirms: |
YES/NO |
|
8.They have discussed with the learner the workplace task they are required to complete for this assessment. |
oYES oNO |
|
9.They have discussed with the learner the resources they are required to access to complete the workplace task. |
oYES oNO |
|
10.The learner understands they will be assessed while completing this workplace task, as well as any document(s) they will complete as part of this task. |
oYES oNO |
|
11.They have discussed with the learner the instructions on how they are to undertake the workplace task. |
oYES oNO |
|
12.They have provided the learner guidance on how they can satisfactorily complete the task. |
oYES oNO |
|
13.They have discussed with the learner the practical skills (outlined below) they are required to meet to satisfactorily complete the task. |
oYES oNO |
|
14.They have addressed the learners questions or concerns about the workplace task and the assessment process. |
oYES oNO |
|
ASSESSORS CHECKLIST |
|||||
|
During the meeting with the team members, learner: |
YES/NO |
Assessors comments |
|||
|
11.Describes the purpose of the meeting. Learner must mention that the purpose of the meeting is to communicate improvement needs and opportunities fromWorkplace Project Task 5and discuss learning opportunities for team members. |
oYES oNO |
????? |
|||
|
12.Discusses the target outcome of the meeting. Learner must mention that the target outcome of the meeting is to agree on the improvement needs and opportunities and identify at least two learning opportunities for team members. |
oYES oNO |
????? |
|||
|
13.Communicates the three identified improvement needs and three opportunities. The improvement needs and opportunities must match those identified in the Gap Analysis section of the Innovation and Continuous Improvement Opportunities ReportfromWorkplace Project Task 5. In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
a.Includes at least one improvement need and one opportunity for each of supply chain, operational systems and service systems |
oYES oNO |
????? |
|||
|
b.Includes details of the improvement needs and opportunities This must include the information from the Gap Analysis section in Innovation, and Continuous Improvement Opportunities ReportfromWorkplace Project Task 5. |
oYES oNO |
????? |
|||
|
c.Explains the benefits of addressing the improvement needs and opportunities |
oYES oNO |
????? |
|||
|
14.Allows opportunity for team members to also identify improvement needs and opportunities |
oYES oNO |
????? |
|||
|
15.Agrees on identified improvement needs and opportunities with team members In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
Shows appreciation for the inputs from the team members Facilitates decision-making to come to an agreement, by discussing: Benefits and risks of addressing the opportunity Prioritisation of opportunities, if more than two are identified |
oYES oNO |
????? |
|||
|
16.Identifies learning opportunities for each team member, including: |
oYES oNO |
????? |
|||
|
a.Areas of learning for the team memberrelevant to innovation and continuous improvement in general |
oYES oNO |
????? |
|||
|
b.Skill level of the team member in that area to identify the learning required |
oYES oNO |
????? |
|||
|
c.Sources of learning in the organisation This includes: |
oYES oNO |
????? |
|||
|
Knowledge management systems in the workplace Coaching opportunities Training programmes and certifications Learning management systems |
oYES oNO |
????? |
|||
|
17. In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
a.Uses respectful communication to demonstrate consideration of the needs of those from diverse backgrounds, such as: |
oYES oNO |
????? |
|||
|
Avoids use of slang, idioms and jargon Clarifies that information shared is sufficiently understood. Avoids referencing to a culture by mentioning someones race, cultures, ethnic group, etc. Uses supplementary gestures or sign language to support verbal communication, if necessary |
oYES oNO |
????? |
|||
|
b.Examines all suggestions and ideas from team members with the focus on agreeing on improvement needs and opportunities and identifying learning opportunities for team members |
oYES oNO |
????? |
|||
|
18.Collaborates with the team members to achieve joint outcomes In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
Does not use power, pressure or force on team members to make them agree |
oYES oNO |
????? |
|||
|
Highlights suggestions from team members that align to the discussion on improvement opportunities |
oYES oNO |
????? |
|||
|
Provides relevant examples of improvement opportunities |
oYES oNO |
????? |
|||
|
Shares ideas on relevant learning opportunities |
oYES oNO |
????? |
|||
|
19. In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
Allows others to ask questions or clarify their understanding |
oYES oNO |
????? |
|||
|
Encourages discussions and brainstorming between the team members to identify improvement opportunities |
oYES oNO |
????? |
|||
|
20.Demonstrates the use of appropriate verbal communication techniques to build rapport with the team member. In demonstrating this, learner: |
oYES oNO |
????? |
|||
|
Uses words that show interest in understanding the team members ideas |
oYES oNO |
????? |
|||
|
Speaks in a polite and professional manner, such as using: |
oYES oNO |
????? |
|||
|
Intonation that doesnt sound rude or aggressive Indirect language, such as Could you instead of can you; Would it be alright if instead of Can I Please and Thank you when requesting something from the team member |
oYES oNO |
????? |
|||
|
Injects humour that is non-derogatory or judgmental to lighten the mood of the conversation |
oYES oNO |
????? |
|||
|
By signing here, I confirm that I have observed the candidate, whose name appears above: Communicate with and agree on identified improvement needs and opportunities with team members Identify learning opportunities for team members I confirm that the information recorded on thisObservation Formis true and accurately reflects the learners performance during their completion of the workplace task. |
|||||
|
Assessors signature |
????? |
||||
|
Assessors name |
????? |
||||
|
Date signed |
????? |
||||
Task 7: Implement Innovative Processes
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to prepare an Innovation and Continuous Improvement Implementation Report on implementing innovative processes from Innovation and Continuous Improvement opportunities and transition plans in accordance with organisations processes for approvals, project management and change management. Use your workplace/organisations template to complete this task, or use the genericInnovation and Continuous Improvement Implementation Reporttemplate provided at the Bounce Fitness site. To complete this task, you must: Access and review in your organisation: oImplementation plan for innovation and continuous improvement oTransition plan oProcesses for communication oProcesses for approvals, project management and change management Identify a plan to be implemented within the organisation for Innovation and Continuous Improvement and the corresponding system or process Obtain confirmation from relevant personnel on readiness of objectives, timeframes, measures and communication plans Relevant personnel are individuals or groups who have knowledge or experience with the information or instructions you will need to obtain. Implement improvements from Innovation and Continuous Improvement opportunities fromWorkplace Project Task 5 Implement the transition plan for at least two people affected by the change, addressing the change impact and consequences and following organisations processes for change management Support testing and trialling of new ideas Prepare an Innovation and Continuous Improvement Implementation Report incorporating the above |
|
ReviewWorkplace Project Task 7 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use theInnovation and Continuous Improvement Implementation Reporttemplate provided at the Bounce Fitness site. Submit the completed Innovation and Continuous Improvement Implementation Report to your assessor. Include any supplementary documents/sources used to create the Innovation and Continuous Improvement Implementation Report, such as: Organisation implementation plan for Innovation and Continuous Improvement Organisational transition plan Organisations processes for communication Organisations processes for approvals, project management and change management You must also submit evidence of obtaining confirmation of readiness, implementation of innovative processes and implementation of Transition Plan. For obtaining confirmation of readiness, evidence must be at least one of the following: Email correspondence Meeting minutes |
|
For implementation of innovative processes, evidence must be at least one of the following: Email correspondence Meeting minutes This must include any of the following: Sign-off by relevant stakeholders of the system or process for Innovation and Continuous Improvement implementation Updated performance report for the system or process Acceptance and approval by relevant personnel of the system or process for the learners implementation Acceptance and approval by the learners organisations management for the learners implementation For implementation of Transition Plan, evidence can include but is not limited to: Email correspondence Meeting minutes Sign-off on completion of knowledge transfer by both the individuals who have been impacted This must address the impact and consequences of change due to the implementationof improvements from Innovation and Continuous Improvement opportunities. |
|
INNOVATION AND CONTINUOUS IMPROVEMENT IMPLEMENTATION REPORT |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
|
Date Prepared |
????? |
PRE-IMPLEMENTATION CHECKLIST
|
Organisation Implementation Plan |
|
|
Plan Name |
????? |
|
Plan Date |
????? |
|
System/Process Name |
????? |
|
Target Outcome |
????? |
|
Organisation Transition Plan |
|
|
Plan Name |
????? |
|
Plan Date |
????? |
INNOVATION IMPLEMENTATION DETAILS
|
Objectives |
|
|
????? |
|
|
Method/Framework |
|
|
????? |
|
|
Activities |
Timelines |
|
Activities and timelines may also be represented using a Gantt chart. |
|
|
????? |
????? |
|
????? |
????? |
|
Testing and Trialling Explain support for testing and trialling of new ideas prior to full implementation. |
|
|
????? |
|
|
Outcomes/Milestones |
|
|
????? |
|
|
Communications |
|
|
????? |
|
TRANSITION IMPLEMENTATION DETAILS
|
Impacted Individuals List at least two people. |
|||
|
Name |
Previous Role/Responsibilities |
New Role/Responsibilities |
|
|
a.????? |
????? |
????? |
|
|
b.????? |
????? |
????? |
|
|
Change Impact and Consequences Outline the change impact and resulting consequences such as resultant gaps in the individuals skill or experience (change impact) or role change for the individual (consequence). |
|||
|
Individuals Name |
Change Impact |
Consequences |
|
|
a.????? |
????? |
????? |
|
|
b.????? |
????? |
????? |
|
|
Activities |
Timelines |
||
|
Activities and timelines may also be represented using a Gantt chart. |
|||
|
????? |
????? |
||
|
????? |
????? |
||
|
Knowledge Transfer |
|||
|
Outline how knowledge transfer has been done, for example using training sessions or workshops. Include the participant, method and date of knowledge transfer sessions. |
|||
|
Knowledge Transfer Method |
Participants |
Date |
|
|
????? |
????? ????? |
????? |
|
|
Communications |
|||
|
????? |
|||
Task 8: Analyse Failures and Manage Learnings
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to identify and manage emerging challenges and opportunities by implementing contingency plans, prepare a post-implementation analysis of failures and learnings, and update the organisational knowledge management system accordingly. Use your workplace/organisations template to complete this task, or use the genericInnovation and Continuous Improvement Post-implementation Analysistemplate provided at the Bounce Fitness site. To complete this task, you must: Identify opportunities to implement two contingency plans Access and review the following from the organisation: oTwo action plans that have failed oTwo contingency plans corresponding to each of the failed action plans oRelevant personnel from the organisation who can provide information on the failure of the two actions plans Relevant personnel are individuals or groups who have knowledge or experience with the information or instructions the learner will need to obtain. oKnowledge management system (KMS) and process Investigate and analyse the causes of failure of action plans Implement the identified contingency plans for the two action plans that have failed Prepare an Innovation and Continuous Improvement Post-Implementation Analysis containing: oInvestigation and analysis of causes of failure oContingency plans implemented oLearnings from innovation and continuous improvement activities including insights, experiences and ideas Update your organisations knowledge management system (KMS) and future planning activities with the following: oLearnings from innovation and continuous improvement activities oInsights oExperiences oIdeas for improvements |
|
ReviewWorkplace Project Task 8 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use theInnovation and Continuous Improvement Post-implementation Analysistemplate provided at the Bounce Fitness site. Submit the completed Innovation and Continuous Improvement Post-implementation Analysis to your assessor. Include any supplementary documents/sources used to create the Innovation and Continuous Improvement Post-implementation Analysis, such as: Two action plans in the organisation that have failed Two contingency plans corresponding to each of the failed action plans Organisational knowledge management system (KMS) and process You must also submit evidence of: Implementation of contingency plans. Evidence must be at least one of the following: oCopies of documents created or received during the implementation of each action item oSpecific documentation related to each action item (e.g., if action item is to set a schedule of tasks per day, learner can submit a copy of their daily scheduled tasks) oEmail correspondence oMeeting minutes Confirmation of updating KMS and future planning. Evidence must be at least one of the following: oDepartment circular/announcement mailer oEmail correspondence oMeeting minutes |
|
INNOVATION AND CONTINUOUS IMPROVEMENT POST-IMPLEMENTATION ANALYSIS |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
|
Date Prepared |
????? |
FAILURE ANALYSIS
|
Analysis of causes of failure of Action Plan-1 |
||
|
Action Plan Outline |
????? |
|
|
Performance Target |
????? |
|
|
Performance Achieved |
????? |
|
|
Investigation Approach List all sources used to collect information about the failure |
????? |
|
|
Deviation from Plan Identify the step(s) in the action plan where any deviation occurred |
????? |
|
|
????? |
||
|
????? |
||
|
Deviation Analysis Analyse why the deviation occurred and how it could be prevented |
????? |
|
|
Deviation Cause of Failure? |
Yes |
No |
|
Root Cause Analysis of Failure Perform root cause analysis of failure if it is identified that deviation is not the cause of failure |
|||
|
Failure Description |
????? |
||
|
Failure Cause Identification |
Cause |
Occurrence |
Impact |
|
????? |
????? |
????? |
|
|
Analysis of causes of failure of Action Plan-2 |
||
|
Action Plan Outline |
????? |
|
|
Performance Target |
????? |
|
|
Performance Achieved |
????? |
|
|
Investigation Approach List all sources used to collect information about the failure |
????? |
|
|
Deviation from Plan Identify the step(s) in the action plan where any deviation occurred (if any) |
????? |
|
|
????? |
||
|
????? |
||
|
Deviation Analysis Analyse why the deviation occurred and how it could be prevented |
????? |
|
|
Deviation Cause of Failure? |
Yes |
No |
|
Root Cause Analysis of Failure Perform root cause analysis of failure if it is identified that deviation is not the cause of failure |
|||
|
Failure Description |
????? |
||
|
Failure Cause Identification |
Cause |
Occurrence |
Impact |
|
????? |
????? |
????? |
|
CONTINGENCY PLAN
|
Contingency Plan Title |
Corresponds to Action Plan |
Contingency Action Items |
Expected Date of Implementation |
Expected Outcome |
Actual Date of Implementation |
Actual Outcome |
|
a.????? |
????? |
????? |
????? |
????? |
????? |
????? |
|
b.????? |
????? |
????? |
????? |
????? |
????? |
????? |
|
Learnings |
|
|
Insights |
a.????? |
|
b.????? |
|
|
Experiences |
a.????? |
|
b.????? |
|
|
Ideas |
a.????? |
|
b.????? |
|
Task 9: Evaluate Innovation and Continuous Improvement Systems and Processes
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to prepare an Innovation and Continuous Improvement Evaluation Report for two continuous improvement processes and two systems, identity the costs and benefits of innovations and improvements, and seek feedback from relevant stakeholders on the Innovation and Continuous Improvement Evaluation Report. Use your workplace/organisations template to complete this task, or use theInnovation and Continuous Improvement Evaluation Reporttemplate provided at the Bounce Fitness site. To complete this task, you must: Access and review the following from your organisation: oOrganisational documents or communication on key objectives for an innovation initiative and continuous improvement systems and processes oPolicies and procedures related to evaluation of innovation initiatives and continuous improvement systems and processes. This must include a schedule on when evaluation must be conducted. Evaluate achievement of objectives on a regular basis for at least two occasions according to the organisation schedule of evaluation, for: oOne innovation initiative oTwo continuous improvement processes in the organisation oTwo continuous improvement systems in the organisation Identify costs and benefits of innovations and improvements in Innovation and Continuous Improvement Opportunities Report fromWorkplace Project Task 5 Complete the Innovation and Continuous Improvement Evaluation Report incorporating the information above Communicate the following with relevant stakeholders using email communication: Relevant stakeholders for this purpose would include: Managers of innovation initiatives in the organisation Senior management and the end users of the continuous improvement systems and processes in the organisation. oCompleted Innovation and Continuous Improvement Evaluation Report oSeek feedback on the report |
|
ReviewWorkplace Project Task 9 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Review the template you will use to complete this task. If you are using a template from your workplace/organisation, discuss with your assessor to ensure that the template covers all requirements that apply to this task. Otherwise, use theInnovation and Continuous Improvement Evaluation Reporttemplate provided at the Bounce Fitness site. Submit the completed Innovation and Continuous Improvement Evaluation Report to your assessor. Include any supplementary documents/sources used to create the Innovation and Continuous Improvement Evaluation Report or to communicate and seek feedback from stakeholders, such as: Organisation documents or communication on key objectives for innovation initiatives and the continuous improvement systems and processes Organisational policies and procedures related to evaluation of innovation initiatives and continuous improvement systems and processes (schedule of evaluation) Printed or online sources to identify costs and benefits of innovation and continuous improvement You must also submit evidence of communication to and seeking feedback from at least two relevant stakeholders of the organisation on the Innovation and Continuous Improvement Evaluation Report. Evidence must be email communication. |
|
INNOVATION AND CONTINUOUS IMPROVEMENT EVALUATION REPORT |
|
|
Learner Name |
????? |
|
Workplace/Organisation |
????? |
|
State/Territory |
????? |
|
Date Prepared |
????? |
INNOVATION AND CONTINUOUS IMPROVEMENT SYSTEM/PROCESS EVALUATION
|
Innovation Initiative |
||
|
Initiative Overview |
Title |
Department |
|
????? |
????? |
|
|
Key Objectives |
||
|
????? |
||
|
Source of Information about Objectives |
||
|
????? |
||
|
|
Evaluation Round 1 |
Evaluation Round 2 |
|
Date of Evaluation Dates must be in accordance with the organisation policies and procedures (schedule of evaluation). |
????? |
????? |
|
Key Objectives Achieved |
Yes No |
Yes No |
|
Outline of Objectives Not Achieved (if applicable) |
????? |
????? |
|
Analysis of Why Objectives were Not Achieved |
????? |
????? |
|
Recommendations |
????? |
????? |
|
Continuous Improvement System 1 |
||
|
System Overview |
Title |
Department |
|
????? |
????? |
|
|
Key Objectives |
||
|
????? |
||
|
Source of Information about Objectives |
||
|
????? |
||
|
|
Evaluation Round 1 |
Evaluation Round 2 |
|
Date of Evaluation Dates must be in accordance with the organisation policies and procedures (schedule of evaluation). |
????? |
????? |
|
Key Objectives Achieved |
Yes No |
Yes No |
|
Outline of Objectives Not Achieved (if applicable) |
????? |
????? |
|
Analysis of Why Objectives were Not Achieved |
????? |
????? |
|
Recommendations |
????? |
????? |
|
Continuous Improvement System 2 |
||
|
System Overview |
Title |
Department |
|
????? |
????? |
|
|
Key Objectives |
||
|
????? |
||
|
Source of Information about Objectives |
||
|
????? |
||
|
|
Evaluation Round 1 |
Evaluation Round 2 |
|
Date of Evaluation Dates must be in accordance with the organisation schedule of evaluation |
????? |
????? |
|
Key Objectives Achieved |
Yes No |
Yes No |
|
Outline of Objectives Not Achieved (if applicable) |
????? |
????? |
|
Analysis of Why Objectives were Not Achieved |
????? |
????? |
|
Recommendations |
????? |
????? |
|
Continuous Improvement Process 1 |
||
|
Process Overview |
Name |
Department |
|
????? |
????? |
|
|
Key Objectives |
||
|
????? |
||
|
Source of Information about Objectives |
||
|
????? |
||
|
|
Evaluation Round 1 |
Evaluation Round 2 |
|
Date of Evaluation Dates must be in accordance with the organisation schedule of evaluation |
????? |
????? |
|
|
Yes No |
Yes No |
|
Outline of Objectives Not Achieved (if applicable) |
????? |
????? |
|
Analysis of Why Objectives were Not Achieved |
????? |
????? |
|
Recommendations |
????? |
????? |
|
Continuous Improvement Process 2 |
||
|
Process Overview |
Name |
Department |
|
????? |
????? |
|
|
Key Objectives |
||
|
????? |
||
|
Source of Information about Objectives |
||
|
????? |
||
|
|
Evaluation Round 1 |
Evaluation Round 2 |
|
Date of Evaluation Dates must be in accordance with the organisation schedule of evaluation |
????? |
????? |
|
Key Objectives Achieved |
Yes No |
Yes No |
|
Outline of Objectives Not Achieved (if applicable) |
????? |
????? |
|
Analysis of Why Objectives were Not Achieved |
????? |
????? |
|
Recommendations |
????? |
????? |
COSTS AND BENEFITS OF INNOVATIONS AND IMPROVEMENTS
|
Innovation - 1 |
||||
|
Innovation Outline |
????? |
|||
|
Associated System/Process |
????? |
|||
|
Assumptions for cost and benefit calculations |
????? |
|||
|
Innovation Costs and Benefits |
||||
|
Cost |
Amount of Cost in $ |
Benefit |
Amount of Benefit in $ |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
Total Costs |
????? |
Total Benefits |
????? |
|
Add more rows as necessary.
|
Innovation - 2 |
||||
|
Innovation Outline |
????? |
|||
|
Associated System/Process |
????? |
|||
|
Assumptions for cost and benefit calculations |
????? |
|||
|
Innovation Costs and Benefits |
||||
|
Cost |
Amount of Cost in $ |
Benefit |
Amount of Benefit in $ |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
Total Costs |
????? |
Total Benefits |
????? |
|
Add more rows as necessary.
|
Improvement - 1 |
||||
|
Improvement Outline |
????? |
|||
|
Associated System/Process |
????? |
|||
|
Assumptions for cost and benefit calculations |
????? |
|||
|
Improvement Costs and Benefits |
||||
|
Cost |
Amount of Cost in $ |
Benefit |
Amount of Benefit in $ |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
Total Costs |
????? |
Total Benefits |
????? |
|
Add more rows as necessary.
|
Improvement - 2 |
||||
|
Improvement Outline |
????? |
|||
|
Associated System/Process |
????? |
|||
|
Assumptions for cost and benefit calculations |
????? |
|||
|
Improvement Costs and Benefits |
||||
|
Cost |
Amount of Cost in $ |
Benefit |
Amount of Benefit in $ |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
????? |
????? |
????? |
????? |
|
|
Total Costs |
????? |
Total Benefits |
????? |
|
Task 10: Respond to Innovation and Continuous Improvement Feedback
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to respond to and address feedback from stakeholders you communicated withinWorkplace Project Task 9,on the Innovation and Continuous Improvement Evaluation Report. To complete this task, you must: Review the feedback from at least two stakeholders you communicated to inWorkplace Project Task 9,on Innovation and Continuous Improvement Evaluation Report Respond to the stakeholders and address their feedback ReviewWorkplace Project Task 10 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Submit evidence of your response to each of the stakeholders. Evidence must be any of the following: Email correspondence Meeting minutes |
Task 11: Establish a Rewards Programme
|
ASSESSMENT INSTRUCTIONS |
|
This task will require you to establish a rewards programme for Innovation and Continuous Improvement and Learning. To complete this task, you must: Access and review rewards programmes and plans in the organisation Identify a new rewards programme in the organisation for Innovation and Continuous Improvement and Learning
oReview the expected behaviour to be rewarded oReview the key performance metrics Establish the rewards programme for Innovation and Continuous Improvement and learning This will require you to: oIdentify the scope of implementation, for example, whether the programme will be rolled out organisation-wide or at department-level or for a specific team. oIdentify the criteria and the corresponding rewards oPlan the method and costs for: Sourcing the identified rewards Delivering the rewards to the employees oGet approvals from relevant personnel for the programme, specifically for expenses Relevant personnel would include supervisors or management who have the authority and can sponsor or approve budgets for rewards programmes in the organisation. oCommunicate the rewards programme to the relevant audience, depending on the scope of implementation |
|
ReviewWorkplace Project Task 11 Assessors Checklistbefore starting this task. This form outlines the following: Resources you are required to access to complete the task. All criteria your submission must address to satisfactorily complete this task. Your assessor will discuss these resources with you, and the criteria outlined in this form prior to this assessment. Submit evidence of rewards programme established to your assessor. Evidence must be at least one of the following: Email correspondence Meeting minutes Organisation or department circular Announcement mailer Include any supplementary documents/sources used to establish the rewards programme, such as: Rewards programmes or plans in the organisation Organisational policies and procedures for internal communication Organisational policies and procedures for approvals Evidence you will submit must be relevant to the rewards programme implemented. |
|
Assessment Activity |
Satisfactory |
Needs more evidence |
||
|
Short Answer Questions |
||||
|
Short Answer Question 1 |
||||
|
Short Answer Question 2 |
||||
|
Short Answer Question 3 |
||||
|
Short Answer Question 4 |
||||
|
Short Answer Question 5 |
||||
|
Short Answer Question 6 |
||||
|
Short Answer Question 7 |
||||
|
Short Answer Question 8 |
||||
|
Short Answer Question 9 |
||||
|
Assessment Activity |
Satisfactory |
Needs more evidence |
||
|
Workplace Project Assessment |
||||
|
Task 1: Prepare Innovation and Continuous Improvement Fact Sheet |
||||
|
Task 2: Identify Improvement Opportunities |
||||
|
Task 3: Coach team in Innovation |
||||
|
Task 4: Mentor team in Continuous Improvement |
||||
|
Task 5: Prepare Innovation and Continuous Improvement Opportunities Report |
||||
|
Task 6: Confirm Innovation and Continuous Improvement Opportunities with Team |
||||
|
Task 7: Implement Innovative Processes |
||||
|
Task 8: Analyse Failures and Manage Learnings |
||||
|
Task 9: Evaluate Innovation and Continuous Improvement Systems and Processes |
||||
|
Task 10: Respond to Innovation and Continuous Improvement Feedback |
||||
|
Task 11: Establish a Rewards Programme |
||||