Minimisewasteonthebuildingandconstruction site CPC40120
- Subject Code :
CPC40120
ASSESSMENTSUMMARY/COVERSHEET
Thisformistobecompletedbytheassessorandusedafinalrecordofstudentcompetency. Allstudentsubmissionsincludinganyassociatedchecklists(outlinedbelow)aretobeattachedtothiscoversheet before placing on the students file. StudentresultsarenottobeenteredontotheStudentDatabaseunlessallrelevantpaperworkiscompletedand attached to this form. |
||||||||
StudentName: |
||||||||
StudentIDNo: |
||||||||
FinalCompletionDate: |
||||||||
CourseCode&Title: |
CPC40120-CertificateIVinBuildingandConstruction |
|||||||
UnitCode: |
CPCCBC4021 |
|||||||
UnitTitle: |
Minimisewasteonthebuildingandconstruction site |
|||||||
Pleaseattachthefollowingdocumentationtothisform: |
Result S = Satisfactory NS=NotSatisfactory |
|||||||
Assessment1 |
|
WrittenAssessment |
|
S |
|
NS |
||
Assessment2 |
|
PracticalTask |
|
S |
|
NS |
||
FinalAssessmentResultforthisunit |
|
C |
|
NYC |
||||
Student Feedback: |
||||||||
Student Declaration:I declare that I have been assessedinthisunit,andIhavebeenadvisedofmy result.I also am aware of my appeal rights. |
StudentName: |
|||||||
StudentSignature: |
||||||||
Date: |
||||||||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName: |
|||||||
AssessorSignature: |
||||||||
Date: |
||||||||
Administrativeuseonly |
||||||||
EnteredintoStudentManagementDatabase |
Date: |
Initials: |
ASSESSMENT1WRITTENASSESSMENT |
||
StudentName: |
||
Student IDNo: |
||
Final CompletionDate: |
||
1 |
Foreachpicturebelow,identifythebuildingandconstructionmethodused. |
|
Building and constructionmethods |
Pictures |
|
|
||
|
|
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
2 |
Identifythebuildingandconstructionprinciplebeingappliedtoeachscenariogivenbelow. |
|||
Buildingandconstruction principles |
Scenarios |
|||
Theconstructionmanagerinchargeofasiteinstructshisworkersthattheyarerequired to follow the sites waste management policy and dispose of waste properly. |
||||
Workersarenotallowedon-siteiftheyarenotwearingpersonalprotectiveequipment such as helmets and safety boots. |
||||
Theprojectmanagerencouragesallpersonneltofinishtheirtasksontimeandprovides incentives for tasks completed before the deadline. |
||||
Beforebeginningtheproject,materialswerecanvassed.Thefinalmaterialsselectedwere the ones at the lowest cost that still adhered to quality and safety standards. |
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
3 |
Identifythefollowingregulationsenforcedinyourstate/territory: Tworegulationsrelevanttobuildingandconstruction Oneregulationrelevanttotheenvironment Oneregulationrelevanttosustainability For each regulation: 1.Identifyasectionrelevanttominimisingwasteonabuildingandconstructionsite. 2.Brieflyexplainhoweachsectionrelatestominimisingwasteonabuildingandconstructionsite. |
||
Buildingandconstructionregulations |
Sections |
Howtheserelatetominimisingwasteona building and construction site |
|
Environmentalregulation |
Sections |
Howtheserelatetominimisingwasteona building and construction site |
|||
Sustainabilityregulation |
Sections |
Howtheserelatetominimisingwasteona building and construction site |
|||
|
Satisfactory |
|
NotSatisfactory |
||
Comments |
4 |
Identifytwostandardsthatyoumustreviewwhenminimisingwasteonabuildingand construction site. |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
5 |
AsidefromtheNationalConstructionCode(NCC),identifyoneothercoderelevantto building and construction that is applicable to your state/territory. Brieflydescribehoweachcodeappliestominimisingwasteonabuildingand construction site: i.TheNCC ii.Thecodeyouidentified |
|||
Codes |
Howthecodesapplytominimisingwasteonabuildingandconstructionsite |
|||
NationalConstruction Code (NCC) |
||||
Development Control CodeforBestPractice Waste Management in the ACT 2019 |
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
6 |
Foreachscenariobelow: i.Identifythetypeofprocurement;ifitisanexampleofeffective,efficient,or economical procurement. Brieflyexplainyouranswer. ii.Brieflydescribehowsustainabilitywaspromoted. |
|
SCENARIO 1: The plan for Project A, aside from identifying important deadlines, specified that only certain types of recyclable materials and products would be used and listed all the different equipment needed for construction. The procurement officer completed all his tasks on time. He ensured that the correctamountandtypesofbuildingmaterialsandproductswereacquiredandobtainedthenecessary equipment listed in the plan. |
||
Typeofprocurement: |
||
Howsustainabilitywaspromoted |
||
SCENARIO 2: The procurement officer for Project B was reviewing the procurement plan for the second stageprojectwhenshenoticedthatsteelbeamswereoneofthematerialslisted.Theprocurementofficer remembered that steel beams were already acquired during the first stage of the project. Upon checking the current inventory, she found that there were still a few steel beams left over and she edited the procurement plan for the second stage accordingly. |
||
Typeofprocurement: |
||
Howsustainabilitywaspromoted |
||
SCENARIO 3: When canvassing suppliers, the procurement officer for Project C did research into their productionprocessesandtookthatintoconsiderationwhensheweighedtheirprosandcons.Shegave priority to suppliers who could demonstrate that their building products were environment friendly and that they had ethical processes, even if their products were more expensive. |
||||
Typeofprocurement: |
||||
Howsustainabilitywaspromoted |
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
7 |
Foreachscenariobelow: i.Identifytwolifecyclestagesoftheproductormaterial ii.Brieflyassessthepotentialnegativeenvironmentalimpactatthestagesyouidentified |
|||
SCENARIO 1: Mary wants her house to be as environment friendly as possible. To do this, she instructs the construction company she hired to use mud bricks while building her house. The company plan to usethesoilexcavatedfromdiggingthehousesfoundationtocreatethemudbricks.Theywilldothisby mixing the excavated soil with water, pouring the mixture into moulds, and setting them aside to air dry. |
||||
Lifecyclestage |
Potentialnegativeenvironmentalimpact |
|||
SCENARIO2:ThecementsupplierthatJosephwasplanningongettingfortheprojectheisoverseeingis about to be shut down. Their production plant was inspected, and it was discovered that they leak pollutants into the environment. He also finds out that the delivery trucks they use do not comply with vehicle emission standards. Joseph is still considering going through with hiring the supplier because the project start date is very near. His plan is to keep looking for a new supplier while the original one begins work on the project so that there will be no delays. |
|
Lifecyclestage |
Potentialnegativeenvironmentalimpact |
SCENARIO 3: Peter is considering getting a certain supplier for the steel beams required in his project. The company has measures in place to reduce the nitrogen oxide levels in the exhaust they produce in themanufacturingprocess.Peterplansonplacingabulkorderwiththecompanyforthesteelbeamsso that the number of deliveries will be decreased. |
|
Lifecyclestage |
Potentialnegativeenvironmentalimpact |
SCENARIO4:Matthewinstructsthecontractorthathehiredtousecorkforhishousesflooringinsteadof composite marble tile. Matthew decides to bring all the old cork flooring to a recycling centre when the time comes for him to replace it. |
||||
Lifecyclestage |
Potentialnegativeenvironmentalimpact |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
8 |
Brieflydescribewhatsupplierpracticesyouwouldlookfortoensurethatthesuppliersprocesses: i.Minimisetheirnegativeenvironmentalimpact ii.Promotesustainability Youmustbrieflydescribeonepracticeperitemabove. |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
9 |
Brieflydescribehowthefollowingcanhelpminimisethenegativeenvironmentalimpact of a building and construction project: i.Examiningsimilarpastprojectstoseehowmanyresourceswereused ii.Makingsurethattheprojectonlyusestheallocatedresources |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
10 |
Brieflydescribehowyouwouldmanageeachenvironmentalriskbelow. |
|||
Environmentalrisk |
Howtomanagetherisk |
|||
Contaminationofgroundwater |
||||
Soilerosion |
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
11 |
Foreachscenariobelow: i.Identifyifthematerialwasrecycled,reclaimed,orreused. Recyclingreferstobreakingdownmaterialsandusingittocreatesomethingnew. Reclaimingreferstousingmaterialsforadifferentpurposewithoutbreaking them down. Reusingreferstousingmaterialsagainforthesamepurposewithout breaking them down. ii.Brieflydescribehowthispromotessustainability. |
|||
SCENARIO 1: The concrete obtained from a demolition site is broken up into much smaller pieces and thesearesiftedtoremoveanyimpurities.Thebroken-upconcreteisthenusedasabaseforanasphalt paving project. |
||||
Whathappenedtothematerial |
||||
Howsustainabilitywaspromoted |
||||
SCENARIO 2: A residential home is renovated and as part of the process, all the old tile flooring is removed.Insteadofthrowingawaytheceramictiles,theyarecarefullycleanedandusedtocreatetiletabletops. |
||||
Whathappenedtothematerial |
||||
Howsustainabilitywaspromoted |
||||
SCENARIO3:Anofficeisrenovatedandtheglasspanelstheyusedasroomdividersisreplaced.Theold glass panels are still in very good shape and after they are cleaned, they are installed in a new office building being built as room dividers. |
||||
Whathappenedtothematerial |
||||
Howsustainabilitywaspromoted |
||||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
12 |
Identifythreepracticesthatyoucanimplementonabuildingandconstructionsiteto minimise the amount of litter. Brieflyexplainhoweachpracticeworkstominimiselitter. |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
13 |
Answerthefollowingitemsrelatedtoreducingpackagingwaste: |
|||
13.1 |
Brieflydescribeonemethodofreducingpackagingwasteonabuildingandconstructionsite. |
|||
13.2 |
Identifytwoenvironmentalbenefitsofreducingpackagingwaste. |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
||||
14 |
AccessandreviewtheCascadePeakConstructionWasteManagementPoliciesand Procedures provided along with this workbook. Afterreviewingthepoliciesandprocedures,outlinetwoproceduresinthespaces provided below. |
|||
|
Satisfactory |
|
NotSatisfactory |
|
Comments |
15 |
AccessandreviewtheCascadePeakConstructionSafetyPoliciesandProcedures provided along with this workbook. Afterreviewingthepoliciesandprocedures,providethefollowinginformationinthe table below: i.FourregistersthatCascadePeakConstructionshouldkeepregardingthe safety of its workers. ii.Fivepiecesofsafetyclothingthatworkersmustwearregardlessoftheirtask. |
||
15.1 |
FourregistersthatCascadePeakConstructionshouldkeepregardingthesafetyofitsworkers |
||
15.21 |
Fivepiecesofsafetyclothingthatworkersmustwearregardlessoftheirtask. |
||
|
Satisfactory |
|
NotSatisfactory |
Comments |
|||
16 |
Identifythefollowing: i.Twodigitaltoolsthatyoucanusetoeffectivelycollaboratewithotherpeople involved in the building and construction project Digitaltoolsarecomputerprogramsorsoftware. ii.Twodigitaldevicesthatyoucanusetoeffectivelycommunicatewithpeople involved in the building and construction project Digitaldevicesarephysicalequipmentorhardware. |
||
16.1 |
Twodigitaltoolsthatyoucanusetoeffectivelycollaboratewithotherpeopleinvolved in the building and construction project |
||
16.2 |
Twodigitaldevicesthatyoucanusetoeffectivelycommunicatewithpeopleinvolvedin the building and construction project |
||
|
Satisfactory |
|
NotSatisfactory |
Comments |
17 |
Identifythefollowing: i.Oneprogramthatyoucanusetoresearchenvironmentalguidelinesandstandards ii.Twodigitaldevicesthatyoucanusetocompileinformation |
||||||
17.1 |
Oneprogramthatyoucanusetoresearchenvironmentalguidelinesandstandards |
||||||
17.2 |
Twodigitaldevicesthatyoucanusetocompileinformation |
||||||
|
Satisfactory |
|
NotSatisfactory |
||||
Comments |
|||||||
ENDOFWRITTENASSESSMENT
Beforeyouhandinyourassessment,makesurethatyou: 1.Haveyoure-checkedyouranswerstomakesureyouarehappywithyourresponses? 2.Havewritten/typeyourName,DateCompletedonthefrontpage? 3.Haveyoucompletedthestudentdeclarationsectionbelow? |
|||||||
Student Declaration:I declare that I have been assessedinthisunit,andIhavebeenadvisedofmy result.I also am aware of my appeal rights. |
StudentName |
||||||
StudentSignature |
|||||||
Date |
|||||||
ASSESSORUSEONLY |
|||||||
Results |
|
Satisfactory |
|
NotSatisfactory |
|||
Comments |
|||||||
Assessor Declaration:I declare that I have conducted a fair, valid, reliable, and flexible assessmentwiththisstudent,andIhaveprovided appropriate feedback |
AssessorName |
||||||
AssessorSignature |
|||||||
Date |
ASSESSMENT2StudentInformation |
PracticalAssessment |
ThePracticalAssessmentisasetoftasksthatmustbecompletedinaworkplace,orinanenvironmentwith conditions similar to that of a real workplace. Thisassessmentwillhelpyoudemonstrateskillrequirementsrelevanttominimisingwasteonbuildingand construction sites. ThePracticalAssessmentincludesthefollowing: ProjectAssessment Asetoftasksoractivitiescompletedaccordingtosetinstructionsandguidelinestomeettherequirementsofthe relevant unit(s). These tasks and activities require you to have access to a real workplace. |
ASSESSMENT2StudentInformation |
PracticalAssessment |
Overview |
Thisprojectassessmentwillrequireyoutominimisewasteonbuildingandconstructionsites. This project is divided into two parts: 1.PlanningtheBuildingProjects 2.ExecutingtheBuildingProjects Resourcesrequiredforassessment Tocompletethisproject,youwillneedaccesstothefollowing: Aworkplacethatwillallowyouaccessto: oPlansforbuildingandconstructionprojects Plansforprojectsthatcontainwastemanagementstrategies Oneplanmustbeforaresidentialbuildingprojectandoneplanmustbeforacommercial building project. Theseplansmustbeforprojectsthathavenotyetstarted. Plansforanyprojectsthathavenotyetstarted Asmuchaspossible,theseplansmustbesoftcopiesordigitalcopies. oOpportunitiestodothefollowing,relatedtotheplansthattheyaccessed: Communicatewithrelevantprofessionalsinvolvedinbuildingandconstructionprojects Communicatewiththeclientofabuildingandconstructionproject Assistintheexecutionofbuildingandconstructionprojects,bothresidentialand commercial oTemplatesfor: Wastemanagementstrategies Procurementspecifications Thefollowinggovernmentrequirements: oRequirementsformanagingbuildingwaste oRequirementsforminimisingbuildingwaste Thefollowingcouncilrequirements: oRequirementsformanagingbuildingwaste oRequirementsforminimisingbuildingwaste Thefollowinginformationrelevanttobuildingandconstructionprojects oEnvironmentalguidelines oEnvironmentalstandards oEnvironmentalregulations oSustainabilityregulations oSustainabilityguidelines AssessmentformsandtemplatesareprovidedineachtaskinthisProjectAssessment. |
Part1PlanningtheBuildingProjects |
1.1ResearchingRequirements |
Thistaskrequiresyoutoresearchrequirementsrelevanttowastemanagementforthebuildingprojects that you will be working on in your organisation. Specifically,youarerequiredto: Identifygovernmentandcouncilrequirements Identifyguidelines,standards,andregulations The outcomes of this task will be used in Task 1.2.1. Steps to take: 1.LocatetheBuildingProjectRequirementstemplateonthefollowingpages. This template outlines all the information you need to document to complete your research on environmental and sustainability requirements relevant to building and construction projects. ReviewtheinstructionshereandthecontentsoftheBuildingProjectRequirementstemplateso you can prepare for this task. 2.CompletetheBuildingProjectRequirementstemplate,oneforresidentialandoneforcommercial building projects, by documenting: i.Yourname ii.Yourworkplace/organisation iii.Thedateyoucompletedthetemplate iv.Yourstate/territory v.Thecitywhereyoulive vi.Thetypeofproject Ticktheappropriateboxtoindicateiftheprojectisresidentialorcommercial. vii.Thefollowinginformation: i.Onegovernmentrequirementforeachofthefollowing: 1.Managingbuildingwaste 2.Minimisingbuildingwaste ii.Onecouncilrequirementforeachofthefollowing: 1.Managingbuildingwaste 2.Minimisingbuildingwaste viii.Thefollowinginformationrelevanttothetypeofproject(i.e.residentialorcommercial): i.Twoenvironmentalguidelinesrelatedtowastemanagement ii.Twoenvironmentalstandardsrelatedtowastemanagement iii.Oneenvironmentalregulationrelatedtowastemanagement iv.Onesustainabilityregulationrelatedtowastemanagement v.Onesustainabilityguidelinerelatedtowastemanagement Environmentalguidelinesarebroaderandincluderecommendationsorbestpractices relevant to protecting the environment. Environmentalstandardsarequalitylevelsforperformancebutcompliancewiththemis voluntary and not mandatory. Environmentalregulationsarerequirementsrelevanttoprotectingtheenvironmentthat must be followed. ix.Thesourcesofinformationforeachoftherelevantinformationabove Forgovernmentsourcesofinformation,thesesourcesmustcomefromthe commonwealth government, or from your state/territory government. Forcouncilsourcesofinformation,thesesourcesmustcomefromthecouncilforthecity where you live. Bothsourcesofinformationmustbecurrentlyinforce. HaveyoursupervisorreviewyourcompletedBuildingProjectRequirementstemplatesandsign the Supervisor Declaration at the end of each. Their signatures must be handwritten. 3.SaveandsubmitthecompletedBuildingProjectRequirementstemplates,oneforeachtypeof building project. Use the filenames: a.CPCCBC40211.1BuildingProjectRequirementsResidential b.CPCCBC40211.1BuildingProjectRequirementsCommercial |
BuildingProjectRequirements |
|||||
Studentname |
|||||
Workplace/organisation |
|||||
Datecompleted |
|||||
State/territory |
|||||
City |
|||||
Projecttype |
|
Residential |
|
Commercial |
|
GovernmentandCouncilRequirements |
|||||
Governmentrequirement |
|||||
Managingbuildingwaste |
Minimisingbuildingwaste |
||||
Source: |
|||||
Managingbuildingwaste |
Minimisingbuildingwaste |
||||
Councilrequirement |
|||||
Managingbuildingwaste |
Minimisingbuildingwaste |
||||
Source: |
|||||
Managingbuildingwaste |
Minimisingbuildingwaste |
||||
EnvironmentalGuidelines1 |
Source: |
EnvironmentalGuidelines2 |
Source: |
EnvironmentalStandards1 |
Source: |
EnvironmentalStandards2 |
Source: |
EnvironmentalRegulation |
||
Source: |
||
SustainabilityRegulation |
||
Source: |
||
SustainabilityGuideline |
||
Source: |
||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|
AssessorSignature |
||
Date |
1.2ReviewingProjectPlans |
Thistaskrequiresyoutolocatethefollowinginyourworkplace: Twobuildingandconstructionprojectplansthatcontainwastemanagementstrategies Twobuildingandconstructionprojectplansforprojectsthathavenotyetbeencompleted The outcomes of this task will be used in all the sub-tasks under Task 1.2. Stepstotake: 1.Consultwithyoursupervisorregardingopportunitiesforyoutoaccessandreviewbuildingandconstruction project plans in your workplace. 2.Locatethefollowingbuildingandconstructionprojectplansinyourworkplace: 1.Twoprojectplansinyourworkplacethatcontainwastemanagementstrategies. A waste management strategy contains information related to handling waste produced on the projectsite.Thismayinclude,butisnotlimitedto,howtohandleharmfulwaste,howtosegregate waste, how to dispose of waste, etc. Oneplanmustbeforaresidentialbuildingprojectandoneplanmustbeforacommercialbuilding project. Theseplansmustbeforprojectsthathavenotyetstarted. 2.Twoprojectplansinyourworkplaceforanyprojectsthathavenotyetstarted. Thesemaybethesameplansastheoneswithwastemanagementstrategiesthatyoulocated. Asmuchaspossible,locatesoftcopiesordigitalcopiesofbuildingandconstructionplansinyour workplace. |
1.2.1DevelopingWasteManagementStrategies |
Thistaskrequiresyoutodevelopalternativewastemanagementstrategiesforbuildingandconstructionprojects while consulting with relevant professionals. Specifically,youarerequiredto: Consultwithprofessionalsinvolvedinbuildingandconstructionsprojectsregardingwasteminimisation strategies Incorporatetheirfeedbackintoalternativewastemanagementstrategiesfortwoprojects DonotproceedwiththistaskifyouhavenotcompletedTask1.1andTask1.2. The outcomes of this task will be used in Task 1.2.2 and Task 2.4.
Stepstotake: 1.Accessandreviewyourworkplacestemplateforwastemanagementstrategies. 2.LocatetheCommunicationsLogtemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentaftercommunicatingwithrelevant personnel for building and construction projects. ReviewtheinstructionshereandthecontentsoftheCommunicationsLogtemplatesoyoucanpreparefor this task. Ifyourworkplacehasitsowntemplatefordocumentingcommunications,youmayusethatinstead. However, it must contain all the information found in the Communications Log. 3.LocatetheWasteManagementStrategySubmissiontemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentwhensubmittingawastemanagement strategy for building and construction projects. ReviewtheinstructionshereandthecontentsoftheWasteManagementStrategySubmissiontemplateso you can prepare for this task. 4.Accessandreviewthebuildingandconstructionprojectplanswithwastemanagementstrategiesthatyou located in Task 1.2. Oneplanmustbeforaresidentialbuildingprojectandoneplanmustbeforacommercialbuildingproject. These plans must be for building and construction projects that have not yet started. 5.Consultwithyoursupervisorregardingopportunitiesforyoutocommunicatewiththefollowing professionals involved in the building and construction projects whose plans you reviewed: Architect Designer Engineer Oneotherrelevantprofessional Thegoalofthecommunicationistodiscussincorporatingawasteminimisationstrategyfortheprojectthat they are involved in. Youmustcontactalltherelevantprofessionalslistedaboveforeachproject. 6.CommunicatewithalltherelevantpersonnelofeachprojectwhoseplansyouandreviewedinStep4. During each communication you must |
1.Iftheplanhasanexistingwasteminimisationstrategy,askthemiftheywanttochangeanything Thegoalofwasteminimisationstrategiesspecificallyistoreducetheamountofwasteproduced on the project site. Waste minimisation strategies may be part of broader waste management strategies. 2.Iftheplandoesnothaveanexistingwasteminimisationstrategy,askthemwhatinformation should be added to one 7.Developanalternativewastemanagementstrategyforeachprojectplanyouaccessedandreviewedin Step 4. Eachalternativestrategymust: 1.Bedifferentfromthewastemanagementstrategycurrentlyincludedintheprojectplan 2.Includethefollowingstrategiesforminimisingwaste: 1.Astrategyforminimisingtheamountofsiteexcavationdisposedofinalandfill 2.Astrategyforminimisingtheamountofothermaterialsdisposedofinalandfill 3.Astrategyforminimisinglitter Whendevelopingthesewasteminimisationstrategies,incorporatetheinformationyougathered from the relevant professionals in Step 7. 3.Containthefollowinginformationrelevanttothestrategy: 1.Onecalculatedcost 2.Onecalculatedpotentialsaving 3.Oneadvantagecomparedtotheoriginalwastemanagementstrategy You must be the one to calculate and identify the items above. 4.ComplywiththefollowingrelevantitemsthatyouidentifiedinTask1.1: 1.Oneenvironmentalregulation 2.Oneenvironmentalguideline 3.Oneenvironmentalstandard 4.Onesustainabilityregulation 5.Onesustainabilityguideline UseyourworkplacestemplatethatyouaccessedandreviewedinStep1. 8.Communicatewithalltherelevantpersonnelofeachprojectandaskfortheirapprovalofthewaste minimisation strategies you developed. Youdonothavetoaskfortheirapprovaloftheentirewastemanagementstrategies,justtheportions dealing with waste minimisation. Whenaskingforapprovalfromeachprofessional: Provideasummaryofthewasteminimisationstrategiesyoudeveloped Iftheydonotapproveofthestrategiesyoudeveloped,askthemwhatyoumustchangeinthe strategies Whilecommunicatingwiththeprofessionals,youmust: Sharealltheimportantinformationregardingthewasteminimisationstrategiesyoudeveloped Makesurethattheprofessionalsunderstoodinformationyoushared 9.Finaliseyourwastemanagementstrategies. |
Foreachstrategy,youmustincorporateanyadditionalfeedbackgivenbyrelevantpersonnelinStep8. Have your supervisor review your completed alternative waste management strategies and sign in the appropriate spaces or in the corner of each page. Their signatures must be handwritten. 10.CompletetheCommunicationsLog,oneforeachprojectplanyoureviewedinStep4,bydocumentingthe following: 1.Your name 2.Your workplace/organisation 3.Thedateyoucompletedthetemplate 4.Thenameoftherelevantproject 5.Thetypeofproject Ticktheappropriateboxtoindicateiftheprojectisresidentialorcommercial. 6.Foreachrelevantpersonnelyoucommunicatedwith: a)Theplaceholdernameoftherelevantpersonnel b)Roleoftherelevantpersonnel c)Dateofthecommunication d)Modeofcommunication e)Summaryofthecommunication: Iftheplanhasanexistingwasteminimisationstrategy,whattherelevant professional wants to change Iftheplandoesnothaveanexistingwasteminimisationstrategy,whatinformation the relevant professional thinks should be added to one. Ticktheappropriateboxtoidentifywhichisapplicable. Howyouprovidedasummaryofthewasteminimisationstrategiesyoudeveloped Iftherelevantprofessionalapprovesofthewasteminimisationstrategiesyou developed Iftheydonotapproveofthestrategiesyoudeveloped,whatchangesyoumust make in the strategies. Ticktheappropriateboxtoidentifywhichisapplicable. Howyoumadesurethattherelevantprofessionalunderstoodtheinformationyou shared HaveyoursupervisorreviewyourcompletedCommunicationsLogtemplatesandsigntheSupervisor Declaration at the end of each. Their signature must be handwritten. 11.CompletetheWasteManagementStrategySubmissiontemplate,oneforeachalternativewaste management strategy you developed, by documenting the following: 1.Your name 2.Your workplace/organisation 3.Thedateyoucompletedthetemplate 4.Thenameoftherelevantproject 5.Thetypeofproject Ticktheappropriateboxtoindicateiftheprojectisresidentialorcommercial. |
6.Briefdescriptionsofthefollowing: Thestrategiesforminimisingwaste: oAstrategyforminimisingtheamountofsiteexcavationdisposedofinalandfill oAstrategyforminimisingtheamountofothermaterialsdisposedofinalandfill oAstrategyforminimisinglitter Informationrelevanttothealternativewastemanagementstrategy: oOnecalculatedcost oOnecalculatedpotentialsaving oOneadvantagecomparedtotheoriginalwastemanagementstrategy 7.ThefollowingrelevantitemsthatyouidentifiedinTask1.1: Oneenvironmentalregulation Oneenvironmentalguideline Oneenvironmentalstandard Onesustainabilityregulation Onesustainabilityguideline Briefdescriptionsforhowthealternativewastemanagementstrategycomplieswitheach. HaveyoursupervisorreviewyourcompletedWasteManagementStrategySubmissiontemplatesandsign the Supervisor Declaration at the end of each. Their signatures must be handwritten. 12.SaveandsubmitthealternativewastemanagementstrategiesyoudevelopedinStep8.Youdonotneed to submit the entire documents, just the parts related to the Waste Management Strategy Submission template. Youmustsubmitalternativewastemanagementstrategiesforeachbuildingandconstructionprojectplan you accessed and reviewed in Step 4. Use the filenames: CPCCBC40211.2.1WasteManagementStrategyResidential CPCCBC40211.2.1WasteManagementStrategyCommercial 13.SaveandsubmitthecompletedWasteManagementStrategySubmissiontemplates,oneforeach alternative waste management strategy you developed. Use the filenames: CPCCBC40211.2.1WasteManagementStrategySubmissionResidential CPCCBC40211.2.1WasteManagementStrategySubmissionCommercial 14.SaveandsubmitthecompletedCommunicationsLogtemplates,oneforeachprojectplanthatyou accessed and reviewed. Use the filenames: CPCCBC40211.2.1CommunicationsLogResidential CPCCBC40211.2.1CommunicationsLogCommercial |
CommunicationsLog |
|||||
Studentname |
|||||
Workplace/organisation |
|||||
Datecompleted |
|||||
Projectname |
|||||
Projecttype |
|
Residential |
|
Commercial |
|
RelevantProfessional: |
|||||
Roleofrelevantprofessional |
|||||
Dateofcommunication |
|||||
Modeofcommunication |
|||||
Summaryofthecommunication |
|||||
|
Theplanhasanexistingwasteminimisationstrategy |
||||
|
Theplandoesnothaveanexistingwasteminimisationstrategy |
||||
Howyouprovidedasummaryofthewasteminimisationstrategiesyoudeveloped: |
|||||
|
Therelevantprofessionalapprovesofthewasteminimisationstrategiesyoudeveloped |
||||
|
Therelevantprofessionaldoesnotapproveofthewasteminimisationstrategiesyoudeveloped |
||||
Howyoumadesurethattherelevantprofessionalunderstoodtheinformationyoushared: |
RelevantProfessional: |
||
Roleofrelevantprofessional |
||
Dateofcommunication |
||
Modeofcommunication |
||
Summaryofthecommunication |
||
Theplanhasanexistingwasteminimisationstrategy |
||
Theplandoesnothaveanexistingwasteminimisationstrategy |
||
Howyouprovidedasummaryofthewasteminimisationstrategiesyoudeveloped: |
||
|
Therelevantprofessionalapprovesofthewasteminimisationstrategiesyoudeveloped |
|
|
Therelevantprofessionaldoesnotapproveofthewasteminimisationstrategiesyoudeveloped |
|
Howyoumadesurethattherelevantprofessionalunderstoodtheinformationyoushared: |
||
RelevantProfessional: |
||
Roleofrelevantprofessional |
||
Dateofcommunication |
||
Modeofcommunication |
||
Summaryofthecommunication |
||
|
Theplanhasanexistingwasteminimisationstrategy |
|
|
Theplandoesnothaveanexistingwasteminimisationstrategy |
|
Howyouprovidedasummaryofthewasteminimisationstrategiesyoudeveloped: |
||
Therelevantprofessionalapprovesofthewasteminimisationstrategiesyoudeveloped |
||
Therelevantprofessionaldoesnotapproveofthewasteminimisationstrategiesyoudeveloped |
||
Howyoumadesurethattherelevantprofessionalunderstoodtheinformationyoushared: |
||
RelevantProfessional: |
||
Roleofrelevantprofessional |
||
Dateofcommunication |
||
Modeofcommunication |
||
Summaryofthecommunication |
||
|
Theplanhasanexistingwasteminimisationstrategy |
|
|
Theplandoesnothaveanexistingwasteminimisationstrategy |
|
Howyouprovidedasummaryofthewasteminimisationstrategiesyoudeveloped: |
||
|
Therelevantprofessionalapprovesofthewasteminimisationstrategiesyoudeveloped |
|
|
Therelevantprofessionaldoesnotapproveofthewasteminimisationstrategiesyoudeveloped |
|
Page32of68
VERSIONNO:2.0MAR23
Howyoumadesurethattherelevantprofessionalunderstoodtheinformationyoushared: |
||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|
AssessorSignature |
||
Date |
WasteManagementStrategySubmission |
||||
Studentname |
||||
Workplace/organisation |
||||
Datecompleted |
||||
Projectname |
||||
Projecttype |
Residential |
Commercial |
||
Strategies: |
||||
Minimisingtheamountofsiteexcavationdisposedofinalandfill |
||||
Minimisingtheamountofothermaterialsdisposedofinalandfill |
||||
Minimisinglitter |
||||
Calculations: |
||||
Calculatedcost |
||||
Calculatedpotentialsaving |
|
Advantagecomparedtooriginalwastemanagementstrategy |
|
Compliance |
|
Environmentalregulation |
Howthealternativewastemanagementstrategy complies with this |
Environmentalguideline |
Howthealternativewastemanagementstrategy complies with this |
Environmentalstandard |
Howthealternativewastemanagementstrategy complies with this |
Sustainabilityregulation |
Howthealternativewastemanagementstrategy complies with this |
|
Sustainabilityguideline |
Howthealternativewastemanagementstrategy complies with this |
|
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|
AssessorSignature |
||
Date |
1.2.2NegotiatingwithaClient |
Thistaskrequiresyoutonegotiatewithoneprojectclienttoimplementtherelevantalternativestrategyyou developed. DonotproceedwiththistaskifyouhavenotcompletedTask1.2.1. Stepstotake: 1.LocatetheCommunicationsLogtemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentaftercommunicatingwithbuildingand construction project clients. ReviewtheinstructionshereandthecontentsoftheCommunicationsLogtemplatesoyoucanpreparefor this task. Ifyourworkplacehasitsowntemplatefordocumentingcommunications,youmayusethatinstead. However, it must contain all the information found in the Communications Log. 2.Consultwithyoursupervisorregardingopportunitiesforyoutocommunicatewiththeclientofabuilding and construction project. Thisclientmustbeforoneoftheprojectsthatyoudevelopedanalternativewastemanagementstrategyfor in Task 1.2.1. You may communicate with the client of either project. Thegoalofthecommunicationistodiscussthealternativestrategyyoudeveloped. 3.Communicatewiththeclientofoneoftheprojectsthatyoudevelopedanalternativewastemanagement strategy for. Duringthecommunicationyoumust: I.Discusstherelevantalternativewastemanagementstrategythatyoudevelopedwiththeclient. Your discussion must include: a.Thecalculatedcostyoucomputed b.Thecalculatedpotentialsavingyoucomputed c.Theadvantageyouidentifiedovertheoriginalwastemanagementstrategy II.Asktheclientiftheywouldprefertoswitchtothealternativewastemanagementstrategyor stay with the current one. Iftheystillchoosethecurrentwastemanagementstrategy,trytoconvincethemtoswitchby: a.Askingthemwhattheydonotlikeinthealternativestrategy b.Suggestingchangestothealternativestrategythatwouldaddresswhattheydonot like Donotforcetheclienttomaketheswitchiftheyaresurethattheywouldprefertogowiththe original strategy. 4.CompletetheCommunicationsLogbydocumentingthefollowing: I.Your name II.Your workplace/organisation III.Thedateyoucompletedthetemplate IV.Thenameoftherelevantproject V.Dateofthecommunication |
VI.Modeofcommunication VII.Summaryofthecommunication: a.Briefdescriptionsofhowyoudiscussedthefollowingaspectsoftherelevantalternative waste management strategy with the client: a.Thecalculatedcostyoucomputed b.Thecalculatedpotentialsavingyoucomputed c.Theadvantageyouidentifiedcomparedtotheoriginalwastemanagement strategy b.Whattheclientdoesnotlikeinthealternativewastemanagementstrategy Foreachthingtheclientdoeslike,thechangeyousuggestedtothealternative strategy to address it. c.Theclientsfinaldecision(i.e.aretheyswitchingtothealternativestrategyorstaying with the current one) HaveyoursupervisorreviewyourcompletedCommunicationsLogtemplateandsigntheSupervisor Declaration at the end. Their signature must be handwritten. 5.SaveandsubmitthecompletedCommunicationsLog.Usethefilename: CPCCBC40211.2.2CommunicationsLog |
CommunicationsLog |
|
Studentname |
|
Workplace/organisation |
|
Datecompleted |
|
Projectname |
|
Dateofcommunication |
|
Modeofcommunication |
|
Summaryofthecommunication |
|
Aspectsofthealternativemanagementstrategy |
|
Howyoudiscussedthecalculatedcostthatyoucomputed: |
|
Howyoudiscussedthecalculatedpotentialsavingthatyoucomputed: |
|
Howyoudiscussedtheadvantageofthealternativestrategycomparedtotheoriginalwastemanagementstrategy: |
|
Clientapproval |
||
Whattheclientdoesnotlikeinthealternativewaste management strategy |
Changesyousuggestedtoaddresswhattheclient does not like |
|
Theclientsfinaldecision(i.e.aretheyswitchingtothealternativestrategyorstayingwiththecurrentone): |
||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|
AssessorSignature |
||
Date |
1.2.3EvaluatingMaterialstobeUsed |
Thistaskrequiresyoutoevaluatethematerialsthataregoingtobeusedinbuildingandconstructionprojectsin your workplace. Specifically,youarerequiredto: Evaluatetheexistingmaterialslistedinprojectplans Identifymoredurableoptionsthatcanbeusedtoreplacetheexistingmaterialslisted Identifyopportunitieswhererecycledmaterialscanbeused Do not proceed with this task if you have not completed Task 1.2. The outcomes of this task will be used in Task 2.1. Stepstotake: 1.LocatetheMaterialsEvaluationtemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumenttocompleteyourevaluationofthe materials to be used in building and construction projects. ReviewtheinstructionshereandthecontentsoftheMaterialsEvaluationtemplatesoyoucanpreparefor this task. 2.Access and review the second pair of project plans that you located in Task 1.2. Theseplansmustbeforbuildingandconstructionprojectsthathavenotyetstarted. ThesemaybethesameplansastheoneswithwastemanagementstrategiesthatyouusedinTask1.2.1. 3.Accessandreviewoneworkplacedocumentrelatedtoassessingrecycledmaterialsforuseinbuildingand construction projects. 4.Foreachbuildingandconstructionprojectplan,evaluatethematerialstobeusedby: a.Identifyingtwomaterials Identifyingonealternativeforeachmaterialidentified.Eachalternativemust: Behighquality Bemoredurablethantheoriginalmaterial Extendthelifeofthefinalstructure Simplifyanyfutureextension Simplyanyfuturerefurbishment Theremustbeonealternativeforeachmaterialidentified. b.Identifyingtwomaterialsthatcansourcedfromrecycledoptions Each recycled material must meet: Oneregulatoryrestriction Onestandardrestriction Youmustapplydifferentregulatoryrestrictionsanddifferentstandardrestrictionsforeachmaterial. UsetheworkplacedocumentsyouaccessedandreviewedinStep3asguides. 5.CompletetheMaterialsEvaluationtemplate,oneforeachprojectplanyouevaluatedinStep4,by documenting the following: a.Your name |
b.Your workplace/organisation c.Thedateyoucompletedthetemplate d.Thenameoftherelevantproject e.Twomaterialsfromtheprojectplan i.Onealternativeforeachmaterialidentified ii.Briefdescriptionsforwhyeach alternative: 1.Isconsideredhighquality 2.Ismoredurablethantheoriginalmaterial iii.Briefdescriptionsofhoweachalternative: 1.Extendsthelifeofthefinalstructure 2.Simplifiesanyfutureextension 3.Simplifiesanyfuturerefurbishment f.Twomaterialsthatcanbesourcedfromrecycledoptions For each material, brief descriptions of how they meet: i.Oneregulatoryrestriction ii.Onestandardrestriction Thesematerialsmustbedifferentfromthefirsttwomaterialsthatyoucameupwithalternativesfor. HaveyoursupervisorreviewyourcompletedMaterialsEvaluationtemplatesandsigntheSupervisor Declaration at the end of each. Their signatures must be handwritten. 6.SaveandsubmitthecompletedMaterialsEvaluationtemplates,oneforeachprojectplanwhosematerials you evaluated. Use the filenames: CPCCBC40211.2.3MaterialsEvaluation1 CPCCBC40211.2.3MaterialsEvaluation2 |
MaterialsEvaluation |
|
Studentname |
|
Workplace/organisation |
|
Datecompleted |
|
Projectname |
|
MaterialAlternatives |
|
Material: |
|
Alternative |
|
Whythealternativematerialisconsideredhighquality |
|
Whythealternativematerialismoredurablethantheoriginalmaterial |
|
Howthealternativematerialextendsthelifeofthefinalstructure |
|
Howthealternativematerialsimplifiesanyfutureextension |
|
Howthealternativematerialsimplifiesanyfuturerefurbishment |
|
Material: |
|
Alternative |
|
Howthealternativematerialisconsideredtobeofhighquality |
|
Howthealternativematerialismoredurablethantheoriginalmaterial |
|
Howthealternativematerialextendsthelifeofthefinalstructure |
|
Howthealternativematerialsimplifiesanyfutureextension |
|
Howthealternativematerialsimplifiesanyfuturerefurbishment |
|
MaterialsSourcedfromRecycledOptions |
|
Material: |
|
Howthematerialmeetsaregulatoryrestriction |
|
Howthematerialmeetsastandardrestriction |
|
Material: |
|||
Howthematerialmeetsaregulatoryrestriction |
|||
Howthematerialmeetsastandardrestriction |
|||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||
AssessorSignature |
|||
Date |
1.2.4DevelopingProcurementSpecifications |
Thistaskrequiresyoutodevelopprocurementspecificationsforbuildingandconstructionprojectsinyour workplace. Specifically,youarerequiredtodevelopprocurementspecificationsthatminimisepackagingwaste. DonotproceedwiththistaskifyouhavenotcompletedTask1.2. Steps to take: 1.Accessandreviewyourworkplacestemplateforprocurementspecifications. 2.LocatetheProcurementSpecificationsSubmissiontemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentwhensubmittingprocurement specifications that minimise packaging waste to your assessor. ReviewtheinstructionshereandthecontentsoftheProcurementSpecificationsSubmissiontemplateso you can prepare for this task. 3.AccessandreviewthesecondpairofbuildingandconstructionprojectplansthatyoulocatedinTask1.2. These plans must be for building and construction projects that have not yet started. ThesemaybethesameplansastheoneswithwastemanagementstrategiesthatyouusedinTask1.2.1. 4.Foreachbuildingandconstructionprojectplan,developprocurementspecificationsthatminimise packaging waste. UseyourworkplacestemplatethatyouaccessedandreviewedinStep1. Haveyoursupervisorreviewyourcompletedprocurementspecificationsandsignintheappropriatespaces or in the corner of each page. Their signatures must be handwritten. 5.CompletetheProcurementSpecificationsSubmissiontemplate,oneforeachprocurementspecifications you developed in Step 4, by documenting the following: a.Your name b.Yourworkplace/organisation c.Thedateyoucompletedthetemplate d.Thenameoftherelevantproject e.Abriefdescriptionofhowtheprocurementspecificationminimisespackagingwaste HaveyoursupervisorreviewyourcompletedProcurementSpecificationsSubmissiontemplatesandsign the Supervisor Declaration at the end of each. Their signatures must be handwritten. 6.SaveandsubmittheprocurementspecificationsyoudevelopedinStep4.Youdonotneedtosubmitthe entire documents, just the parts that show how the specifications minimise packaging waste. Youmustsubmitprocurementspecificationsforeachbuildingandconstructionprojectplanyouaccessed and reviewed in Step 3. Use the filenames: CPCCBC40211.2.4ProcurementSpecifications1 CPCCBC40211.2.4ProcurementSpecifications2 7.SaveandsubmitthecompletedProcurementSpecificationsSubmissiontemplates,oneforeachproject plan that you accessed and reviewed. Use the filenames: CPCCBC40211.2.4ProcurementSpecificationsSubmission1 CPCCBC40211.2.4ProcurementSpecificationsSubmission2 |
ProcurementSpecificationsSubmission |
|||
Studentname |
|||
Workplace/organisation |
|||
Datecompleted |
|||
Projectname |
|||
Howthisprocurementspecificationminimisespackagingwaste |
|||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||
AssessorSignature |
|||
Date |
1.2.5DevelopingDemolitionPractices |
Thistaskrequiresyoutoidentifydemolitionpracticesforbuildingandconstructionprojectsinyourworkplace. Specifically, you are required to identify demolition practices that increases material recovery. DonotproceedwiththistaskifyouhavenotcompletedTask1.2. The outcomes of this task will be used in Task 2.2. Stepstotake: 1.LocatetheDemolitionPracticestemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentwhenreviewingbuildingandconstruction project plans. ReviewtheinstructionshereandthecontentsoftheDemolitionPracticestemplatesoyoucanpreparefor this task. 2.AccessandreviewthesecondpairofbuildingandconstructionprojectplansthatyoulocatedinTask1.2. These plans must be for building and construction projects that have not yet started. ThesemaybethesameplansastheoneswithwastemanagementstrategiesthatyouusedinTask1.2.1. 3.Foreachbuildingandconstructionprojectplan,identifyonedemolitionpracticeintheplanforeachofthe following: a.Increasingtherecoveryofonematerialforrecycling b.Increasingtherecoveryofonematerialforreuse Youmustidentifyaminimumoftwodemolitionpracticesandaminimumoftwomaterialsacrossboth project plans. 4.CompletetheDemolitionPracticestemplate,oneforeachprojectplanyouaccessedandreviewedinStep 2, by documenting the following: a.Your name b.Your workplace/organisation c.Thedateyoucompletedthetemplate d.Thenameoftherelevantproject e.Thedemolitionpracticethatincreasestherecoveryofonematerialforrecycling f.Thedemolitionpracticethatincreasestherecoveryofonematerialforreuse g.Briefexplanationsforhoweachdemolitionpracticeincreasesmaterialrecovery HaveyoursupervisorreviewyourcompletedDemolitionPracticestemplatesandsigntheSupervisor Declaration at the end of each. Their signatures must be handwritten. 5.SaveandsubmitthecompletedDemolitionPracticestemplates,oneforeachprojectplanthatyou accessed and reviewed. Use the filenames: CPCCBC40211.2.5DemolitionPractices1 CPCCBC40211.2.5DemolitionPractices2 |
DemolitionPractices |
|||
Studentname |
|||
Workplace/organisation |
|||
Datecompleted |
|||
Projectname |
|||
Demolitionpractice |
Howthisincreasesmaterialrecovery |
||
Fortherecoveryofonematerialforrecycling: |
|||
Fortherecoveryofonematerialforreuse: |
|||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||
AssessorSignature |
|||
Date |
1.2.6ProposingaWasteDisposalMethod |
Thistaskrequiresyoutoproposeawastedisposalmethodforabuildingandconstructionprojectinyour workplace. Specifically,youarerequiredtocomeupwithadisposalmethodforunavoidablewastethatis: Safe Environmentallyeffective DonotproceedwiththistaskifyouhavenotcompletedTask1.2. The outcomes of this task will be used in Task 2.3. Stepstotake: 1.LocatetheProposedWasteDisposaltemplateonthefollowingpages. Thistemplateoutlinesalltheinformationyouneedtodocumentwhencomingupwithasafeand environmentally effective waste disposal method. ReviewtheinstructionshereandthecontentsoftheProposedWasteDisposaltemplatesoyoucan prepare for this task. 2.AccessandreviewonethesecondpairofbuildingandconstructionprojectplansthatyoulocatedinTask 1.2. Selectoneplantouseforthistask.Youmayselecteitherplan. Theseplansmustbeforbuildingandconstructionprojectsthathavenotyetstarted. ThesemaybethesameplansastheoneswithwastemanagementstrategiesthatyouusedinTask1.2.1. 3.ForthebuildingandconstructionprojectplanthatyouselectedinStep2,comeupwithonemethodto dispose of unavoidable waste from the project site. Unavoidablewasteismaterialthatcannolongerbereusedorrecycled. This method must be: a.Safe b.Environmentallyeffective 4.CompletetheProposedWasteDisposaltemplatebydocumentingthefollowing: a.Your name b.Your workplace/organisation c.Thedateyoucompletedthetemplate d.Thenameoftherelevantproject e.Thedisposalmethodforunavoidablewastethatyoucameupwith f.Briefexplanationsofhowthismethodis: i.Safe ii.Environmentallyeffective HaveyoursupervisorreviewyourcompletedProposedWasteDisposaltemplateandsigntheSupervisor Declaration at the end. Their signature must be handwritten. 5.SaveandsubmitthecompletedProposedWasteDisposaltemplate.Usethefilename: CPCCBC40211.2.6ProposedWasteDisposal |
ProposedWasteDisposal |
|||
Candidatename |
|||
Workplace/organisation |
|||
Datecompleted |
|||
Projectname |
|||
Disposalmethodforunavoidablewaste |
|||
Howthismethodissafe |
|||
Howthismethodisenvironmentallyeffective |
|||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||
AssessorSignature |
|||
Date |
Part2ExecutingtheBuildingProjects |
2.1UsingRecycledMaterials |
Thistaskrequiresyoutoassistintheexecutionofbuildingandconstructionprojectsinyourworkplace. Specifically, you will need to use the recycled materials you identified in Task 1.2.3. DonotproceedwiththistaskifyouhavenotcompletedTask1.2.3. Steps to take: 1.LocatetheObservationForm(RecycledMaterials)templateonthefollowingpages. Thistemplateoutlinesallthetasksyouneedtocompleteintheworkplacewhilebeingobservedby your assessor. ReviewtheinstructionshereandthecontentsoftheObservationForm(RecycledMaterials)template with your assessor before starting so you can prepare for the tasks. 2.Consultwithyoursupervisorregardingopportunitiesforyoutoassistintheexecutionoftwobuilding and construction projects in your workplace. ThesemustbethesameprojectsastheoneswhoseplansyouaccessedandreviewedinTask1.2.3. 3.Arrangeasuitabletimeforyourassessortoobserveyouasyouassistintheexecutionofbuildingand construction projects in your workplace. 4.Assistintheexecutionofthetwoprojects.Duringeachprojectexecution,youmustusetherelevant recycled materials that you identified in Task 1.2.3. Youmustbeobservedbyyourassessorbothtimes. 5.CompletetheObservationForm(RecycledMaterials)template,oneforeachprojectthatyouassisted in, by documenting the following: a.Your name b.Your title/designation c.Detailsoftheobservation i.Thedatetheobservationwasdone ii.Thetimetheobservationwasdone iii.Locationwheretheobservationwasdone d.Thenameoftherelevantproject e.ThetwomaterialsthatcanbesourcedfromrecycledoptionsthatyouidentifiedinTask1.2.3 f.For each material, briefly explain how you used it in the building and construction project. ProvideyourassessorwithacopyoftheObservationForm(RecycledMaterials)templatesforthemto completeandsign the AssessorDeclaration atthe end ofeach.Their signatures must be handwritten. You must do this for every project you assisted in. 6.SaveandsubmitthecompletedObservationForm(RecycledMaterials)templates,oneforeachproject that you assisted in. Use the filenames: CPCCBC40212.1ObservationForm(RecycledMaterials)1 CPCCBC40212.1ObservationForm(RecycledMaterials)2 |
ObservationForm(RecycledMaterials) |
TheAssessorsRoleasanObserver TheassessoristoobservethecandidateastheycompletethetasksoutlinedinthisObservationForm. To fulfil the role of the candidates observer, the assessor must: Beforeobservingthecandidate: ReviewanddiscussthetasksandrequirementslistedinthisObservationForm. As the candidate is completing each task outlined in this form: Observethecandidateastheycomplete/demonstrateeachtaskandeachrequirementoutlinedinthisform. Takenotesasyouobservethecandidate.Youcanuse/refertothesenoteswhenproviding comments/feedback on the candidates performance. Asthecandidatecompleteseachtaskinthisform,theywill: oRecordhowtheycompletedthistask. oRecordimportantdetailsrelevanttotheirperformanceofthistask,whererequired. The candidate will then submit their response to you. Reviewtheinformationtheyrecordedoneachtaskandprovideyourcommentsandfeedbackonthe candidates performance in the Assessors comments/feedback section. IntheObservedbysectionofeachtask: oSignyourinitialsasconfirmationthatyouhaveobservedthecandidateandasconfirmationthatthe information they recorded in this form is true and accurate. oProvidethedateandtimewhenyouobservedthecandidate. IMPORTANT:Donotsignoffonthetaskiftheinformationthecandidaterecordedisnottrueandfactual, i.e.itcontradictswhatyouhaveobserved,andiftherearemissingdetailsintheirresponses.Inthese instances, please let the candidate know immediately. Afterobservingthecandidate: CompleteandsigntheAssessorDeclarationsection.Thesignaturemustbehandwritten. Returntheformtothecandidate. |
StudentDetails |
||||||
Studentname |
||||||
Title/designation |
||||||
DetailsoftheObservation |
||||||
Dateofobservation |
||||||
Timeofobservation |
||||||
Location |
||||||
DetailsoftheProject |
||||||
Projectname |
||||||
Material1: |
||||||
Material1: |
||||||
Brieflyexplainhowyouusedthismaterialinthebuildingandconstructionproject. |
||||||
Assessorscomments/feedbackonthecandidatesperformance. |
||||||
Observedby |
||||||
Initials: |
Date: |
Time |
Material2: |
|||||||
Material2: |
|||||||
Brieflyexplainhowyouusedthismaterialinthebuildingandconstructionproject. |
|||||||
Assessorscomments/feedbackonthecandidatesperformance. |
|||||||
Observedby |
|||||||
Initials: |
Date: |
Time |
|||||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||||||
AssessorSignature |
|||||||
Date |
2.2UsingDemolitionPractices |
Thistaskrequiresyoutoassistintheexecutionofbuildingandconstructionprojectsinyourworkplace. Specifically, you will need to use the demolition practices you identified in Task 1.2.5. DonotproceedwiththistaskifyouhavenotcompletedTask1.2.5. Steps to take: 1.LocatetheObservationForm(DemolitionPractices)templateonthefollowingpages. Thistemplateoutlinesallthetasksyouneedtocompleteintheworkplacewhilebeingobservedby your assessor. ReviewtheinstructionshereandthecontentsoftheObservationForm(DemolitionPractices)template with your assessor before starting so you can prepare for the tasks. 2.Consultwithyoursupervisorregardingopportunitiesforyoutoassistintheexecutionoftwobuilding and construction projects in your workplace. ThesemustbethesameprojectsastheoneswhoseplansyouaccessedandreviewedinTask1.2.5. 3.Arrangeasuitabletimeforyourassessortoobserveyouasyouassistintheexecutionofbuildingand construction projects in your workplace. 4.Assistintheexecutionofthetwoprojects.Duringeachprojectexecution,youmustusetherelevant demolition practices that you identified in Task 1.2.5. Youmustbeobservedbyyourassessorbothtimes. 5.CompletetheObservationForm(DemolitionPractices)template,oneforeachprojectthatyouassisted in, by documenting the following: a.Your name b.Your title/designation c.Detailsoftheobservation i.Thedatetheobservationwasdone ii.Thetimetheobservationwasdone iii.Locationwheretheobservationwasdone d.Thenameoftherelevantproject e.ThedemolitionpracticesthatyouidentifiedinTask1.2.5 i.Thepracticethatincreasestherecoveryofonematerialforrecycling ii.Thepracticethatincreasestherecoveryofonematerialforreuse f.Foreachdemolitionpractice,brieflyexplainhowyouuseditinthebuildingandconstruction project. ProvideyourassessorwithacopyoftheObservationForm(DemolitionPractices)templatesforthem to complete and sign the Assessor Declaration at the end of each. Their signatures must be handwritten. You must do this for every project you assisted in. 6.SaveandsubmitthecompletedObservationForm(DemolitionPractices)templates,oneforeach project that you assisted in. Use the filenames: CPCCBC40212.2ObservationForm(DemolitionPractices)1 CPCCBC40212.2ObservationForm(DemolitionPractices)2 |
ObservationForm(DemolitionPractices) |
TheAssessorsRoleasanObserver TheassessoristoobservethecandidateastheycompletethetasksoutlinedinthisObservationForm. To fulfil the role of the candidates observer, the assessor must: Beforeobservingthecandidate: ReviewanddiscussthetasksandrequirementslistedinthisObservationForm. As the candidate is completing each task outlined in this form: Observethecandidateastheycomplete/demonstrateeachtaskandeachrequirementoutlinedinthisform. Takenotesasyouobservethecandidate.Youcanuse/refertothesenoteswhenproviding comments/feedback on the candidates performance. Asthecandidatecompleteseachtaskinthisform,theywill: oRecordhowtheycompletedthistask. oRecordimportantdetailsrelevanttotheirperformanceofthistask,whererequired. The candidate will then submit their response to you. Reviewtheinformationtheyrecordedoneachtaskandprovideyourcommentsandfeedbackonthe candidates performance in the Assessors comments/feedback section. IntheObservedbysectionofeachtask: oSignyourinitialsasconfirmationthatyouhaveobservedthecandidateandasconfirmationthatthe information they recorded in this form is true and accurate. oProvidethedateandtimewhenyouobservedthecandidate. IMPORTANT:Donotsignoffonthetaskiftheinformationthecandidaterecordedisnottrueandfactual, i.e.itcontradictswhatyouhaveobserved,andiftherearemissingdetailsintheirresponses.Inthese instances, please let the candidate know immediately. Afterobservingthecandidate: CompleteandsigntheAssessorDeclarationsection.Thesignaturemustbehandwritten. Returntheformtothecandidate. |
StudentDetails |
||||||
Studentname |
||||||
Title/designation |
||||||
DetailsoftheObservation |
||||||
Dateofobservation |
||||||
Timeofobservation |
||||||
Location |
||||||
DetailsoftheProject |
||||||
Projectname |
||||||
DemolitionPractice(MaterialRecycling): |
||||||
Brieflyexplainhowyouusedthisdemolitionpracticeinthebuildingandconstructionproject. |
||||||
Assessorscomments/feedbackonthecandidatesperformance. |
||||||
Observedby |
||||||
Initials: |
Date: |
Time |
DemolitionPractice(MaterialReuse): |
||||||
Brieflyexplainhowyouusedthisdemolitionpracticeinthebuildingandconstructionproject. |
||||||
Assessorscomments/feedbackonthecandidatesperformance. |
||||||
Observedby |
||||||
Initials: |
Date: |
Time |
||||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|||||
AssessorSignature |
||||||
Date |
2.3ImplementingWasteDisposalMethods |
Thistaskrequiresyoutoassistintheexecutionofabuildingandconstructionprojectinyourworkplace. Specifically, you will need to implement the waste disposal method you proposed in Task 1.2.6. DonotproceedwiththistaskifyouhavenotcompletedTask1.2.6. Steps to take: 1.LocatetheObservationForm(WasteDisposal)templateonthefollowingpages. Thistemplateoutlinesallthetasksyouneedtocompleteintheworkplacewhilebeingobservedby your assessor. ReviewtheinstructionshereandthecontentsoftheObservationForm(WasteDisposal)templatewith your assessor before starting so you can prepare for the tasks. 2.Consultwithyoursupervisorregardingopportunitiesforyoutoassistintheexecutionofabuildingand construction project in your workplace. ThismustbethesameprojectastheoneyouselectedinTask1.2.6. 3.Arrangeasuitabletimeforyourassessortoobserveyouasyouassistintheexecutionofthebuilding and construction project in your workplace. 4.Assistintheexecutionoftheproject.Duringtheprojectexecution,youmustimplementtherelevant waste disposal method that you proposed in Task 1.2.6. Youmustbeobservedbyyourassessor. 5.CompletetheObservationForm(WasteDisposal)templatebydocumentingthefollowing: a.Your name b.Your title/designation c.Detailsoftheobservation i.Thedatetheobservationwasdone ii.Thetimetheobservationwasdone iii.Locationwheretheobservationwasdone d.Thenameoftherelevantproject e.TherelevantwastedisposalmethodthatyouproposedinTask1.2.6 f.Brieflyexplainhowyouimplementedthemethodthatyouproposed ProvideyourassessorwithacopyoftheObservationForm(WasteDisposal)templatesforthemto complete and sign the Assessor Declaration at the end. Their signature must be handwritten. 6.SaveandsubmitthecompletedObservationForm(WasteDisposal)template.Usethefilename: CPCCBC40212.3ObservationForm(WasteDisposal) |
ObservationForm(WasteDisposal) |
TheAssessorsRoleasanObserver TheassessoristoobservethecandidateastheycompletethetasksoutlinedinthisObservationForm. To fulfil the role of the candidates observer, the assessor must: Beforeobservingthecandidate: ReviewanddiscussthetasksandrequirementslistedinthisObservationForm. Asthecandidateiscompletingeachtaskoutlinedinthisform: Observethecandidateastheycomplete/demonstrateeachtaskandeachrequirementoutlinedinthisform. Takenotesasyouobservethecandidate.Youcanuse/refertothesenoteswhenproviding comments/feedback on the candidates performance. Asthecandidatecompleteseachtaskinthisform,theywill: oRecordhowtheycompletedthistask. oRecordimportantdetailsrelevanttotheirperformanceofthistask,whererequired. The candidate will then submit their response to you. Reviewtheinformationtheyrecordedoneachtaskandprovideyourcommentsandfeedbackonthe candidates performance in the Assessors comments/feedback section. IntheObservedbysectionofeachtask: oSignyourinitialsasconfirmationthatyouhaveobservedthecandidateandasconfirmationthatthe information they recorded in this form is true and accurate. oProvidethedateandtimewhenyouobservedthecandidate. IMPORTANT:Donotsignoffonthetaskiftheinformationthecandidaterecordedisnottrueandfactual, i.e.itcontradictswhatyouhaveobserved,andiftherearemissingdetailsintheirresponses.Inthese instances, please let the candidate know immediately. Afterobservingthecandidate: CompleteandsigntheAssessorDeclarationsection.Thesignaturemustbehandwritten. Returntheformtothecandidate. |
StudentDetails |
|||||||
Studentname |
|||||||
Title/designation |
|||||||
DetailsoftheObservation |
|||||||
Dateofobservation |
|||||||
Timeofobservation |
|||||||
Location |
|||||||
DetailsoftheProject |
|||||||
Projectname |
|||||||
ThewastedisposalmethodthatyouproposedinTask1.2.6. |
|||||||
Brieflyexplainhowyouimplementedthemethodthatyouproposed. |
|||||||
Assessorscomments/feedbackonthecandidatesperformance. |
|||||||
Observedby |
|||||||
Initials: |
Date: |
Time |
|||||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
||||||
AssessorSignature |
|||||||
Date |
2.4MinimisingWaste |
Thistaskrequiresyoutoassistintheexecutionofbuildingandconstructionprojectsinyourworkplace. Specifically, you will need to complete the following tasks: Minimisewastedisposedofinalandfill Minimiselitterontheprojectsite DonotproceedwiththistaskifyouhavenotcompletedTask1.2.1. Steps to take: 1.LocatetheObservationForm(WasteMinimisation)templateonthefollowingpages. Thistemplateoutlinesallthetasksyouneedtocompleteintheworkplacewhilebeingobservedby your assessor. ReviewtheinstructionshereandthecontentsoftheObservationForm(WasteMinimisation)template with your assessor before starting so you can prepare for the tasks. 2.Consultwithyoursupervisorregardingopportunitiesforyoutoassistintheexecutionoftwobuilding and construction projects in your workplace. ThesemustbethesameprojectsastheoneswhoseplansyouaccessedandreviewedinTask1.2.1. 3.Arrangeasuitabletimeforyourassessortoobserveyouasyouassistintheexecutionofbuildingand construction projects in your workplace. 4.Assistintheexecutionofthetwoprojects.Duringeachprojectexecution,youmustfollowthe strategies you developed in Task 1.2.1: a.Astrategyforminimisingtheamountofsiteexcavationdisposedofinalandfill b.Astrategyforminimisingtheamountofothermaterialsdisposedofinalandfill c.Astrategyforminimisinglitter 5.CompletetheObservationForm(WasteMinimisation)template,oneforeachprojectthatyouassisted in, by documenting the following: a.Your name b.Your title/designation c.Detailsoftheobservation i.Thedatetheobservationwasdone ii.Thetimetheobservationwasdone iii.Locationwheretheobservationwasdone d.Detailsoftheproject i.Thenameoftherelevantproject ii.Thetypeofproject iii.Ticktheappropriateboxtoindicateiftheprojectisresidentialorcommercial. e.BriefexplanationsofhowyoufollowedthestrategiesyoudevelopedinTask1.2.1: i.Strategyforminimisingtheamountofsiteexcavationdisposedofinalandfill ii.Strategyforminimisingtheamountofothermaterialsdisposedofinalandfill iii.Strategyforminimisinglitter |
ProvideyourassessorwithacopyoftheObservationForm(WasteMinimisation)templatesforthemto complete and sign the Assessor Declaration at the end of each. Their signatures must be handwritten. You must do this for every project you assisted in. 6.SaveandsubmitthecompletedObservationForm(WasteMinimisation)templates,oneforeach project that you assisted in. Use the filenames: CPCCBC40212.4ObservationForm(WasteMinimisation)Residential CPCCBC40212.4ObservationForm(WasteMinimisation)Commercial |
ObservationForm(WasteMinimisation) |
TheAssessorsRoleasanObserver TheassessoristoobservethecandidateastheycompletethetasksoutlinedinthisObservationForm. To fulfil the role of the candidates observer, the assessor must: Beforeobservingthecandidate: ReviewanddiscussthetasksandrequirementslistedinthisObservationForm. As the candidate is completing each task outlined in this form: Observethecandidateastheycomplete/demonstrateeachtaskandeachrequirementoutlinedinthisform. Takenotesasyouobservethecandidate.Youcanuse/refertothesenoteswhenproviding comments/feedback on the candidates performance. Asthecandidatecompleteseachtaskinthisform,theywill: oRecordhowtheycompletedthistask. oRecordimportantdetailsrelevanttotheirperformanceofthistask,whererequired. The candidate will then submit their response to you. Reviewtheinformationtheyrecordedoneachtaskandprovideyourcommentsandfeedbackonthe candidates performance in the Assessors comments/feedback section. IntheObservedbysectionofeachtask: oSignyourinitialsasconfirmationthatyouhaveobservedthecandidateandasconfirmationthatthe information they recorded in this form is true and accurate. oProvidethedateandtimewhenyouobservedthecandidate. IMPORTANT:Donotsignoffonthetaskiftheinformationthecandidaterecordedisnottrueandfactual, i.e.itcontradictswhatyouhaveobserved,andiftherearemissingdetailsintheirresponses.Inthese instances, please let the candidate know immediately. Afterobservingthecandidate: CompleteandsigntheAssessorDeclarationsection.Thesignaturemustbehandwritten. Returntheformtothecandidate. |
StudentDetails |
||||
Studentname |
||||
Title/designation |
||||
DetailsoftheObservation |
||||
Dateofobservation |
||||
Timeofobservation |
||||
Location |
||||
DetailsoftheProject |
||||
Projectname |
||||
Projecttype |
Residential |
Commercial |
||
Howyoufollowedthestrategyforminimisingtheamountofsiteexcavationdisposedofinalandfill. |
||||
Howyoufollowedthestrategyforminimisingtheamountofothermaterialsdisposedofinalandfill. |
||||
Howyoufollowedthestrategyforminimisinglitter. |
||||
Assessorscomments/feedbackonthecandidatesperformance. |
||||||
Observedby |
||||||
Initials: |
Date: |
Time |
||||
AssessorDeclaration:IdeclarethatIhaveconducted a fair, valid, reliable, and flexible assessment with this student, and I have provided appropriate feedback |
AssessorName |
|||||
AssessorSignature |
||||||
Date |