diff_months: 16

WAE100 Demand project Assignment

Download Solution Now
Added on: 2023-02-02 09:17:52
Order Code: TV171
Question Task Id: 0
  • Subject Code :

    WAE100

  • Country :

    Australia

MAXIMUM DEMAND PROJECT ASSIGNMENT

  • The specifications provided are for 5 x Shop Units supplied with underground power and to be Multiple Master metered. (check Western Power website for meter layout details)
  • Only a minimum amount of information has been provided for this project. Circuit loading, number  of final sub-circuits and many other specifications have been left out deliberately. Provide your own transformer size (to be located on premises), number of circuits for each of lighting, power, air specifications for cable sizes, circuit protection device size, Ka rating and type, minimum conditioning, hot water services etc. Allow a 0.8 power factor for the Transformer but do not allow for future expansion.
  • The Consumer Main and Sub-main cables are to be V75 multicore. The Consumer mains are buried enclosed in the ground. The Sub-mains are installed in conduit, spaced on perforated tray.
  • When selecting minimum cables sizes you must provide evidence (Via Calculation, Tables, Clause's etc) to ensure they satisfy Volt Drop, Cable Current Carrying Capacity and Fault Loop Impedance.
  • Show Lmax for 2 FSC's and temp rise ('K' Factor) for C.M. and Sub-mains.

Please attach this checklist to your assignment

  1. Cover Sheet (as supplied)
  2. Detail assumptions made and proposed installations method
  3. Maximum Demand calculations for:
    • Sub-mains
    • Consumer Mains
  4. Select mains, sub-mains and final sub circuit cables, (provide table, column number and de-rating from AS/NZS 3008)
  5. Tabulate actual volts drop in all main, sub-main and final circuits (use table format)
  6. Show worst case volt drops diagrammatically. Make statement regarding compliance.
  7. Show Prospective Fault Current levels in Main & all Sub-mains based on your selected Transformer size (show calculations/selection methods)
  8. Show calculation and acceptability of short circuit duration for conductors selected. (Mains and sub-mains only). Ref AS/NZS3008. Make statement regarding suitability.
  9. Show calculations (or table selection) of fault loop impedance/maximum length of final circuits (viz, longest final circuit runs for various sized cables and CB's). Make statement regarding compliance.
  10. Provide metering connection drawings as per the Western Australia Distribution Connections Manual. (Show cable & protection sizes, links, earths etc) as
    selected to suit project requirements.
  11. Provide single line diagram of a typical distribution board (show all earths, bonding, conductor sizes, CB sizes, RCD's)

Get your WAE100 Demand project assignment solved by our Electrical Experts from Exam Question Bank . Our Assignment Writing Experts are efficient to provide a fresh solution to all question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

  • Uploaded By : Katthy Wills
  • Posted on : February 02nd, 2023
  • Downloads : 0
  • Views : 171

Download Solution Now

Can't find what you're looking for?

Whatsapp Tap to ChatGet instant assistance

Choose a Plan

Premium

80 USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 50 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

20 USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more