diff_months: 11

Assessment Task 2: Skills Assessment

Download Solution Now
Added on: 2024-11-13 20:30:15
Order Code: SA Student Karan Management Assignment(3_24_40737_522)
Question Task Id: 503396

Assessment Task 2: Skills Assessment

Opened:Wednesday, 13 March 2024, 8:00 AM

Due:Wednesday, 10 April 2024, 3:00 AM

To do:Make a submissionTo do:Receive a grade

Task 1 Geotechnical Design

Your Assessor will provide you with a briefing for a project requiring a geotechnical investigation. You are required to produce a geotechnical design to align with the project requirements. This requires you to apply yourknowledge of the requirements, procedures and instructions for the completion of the detailed geotechnical works design and documentation and requires:

implementation of procedures and techniques for the safe, effective and efficient completion of the detailed geotechnical works design and documentation

the identification of the relevant information and scope of the work required to meet the required outcomes

the identification of viable options and the selection of detailed geotechnical works design and documentation that best meet the required outcomes

completion of the detailed geotechnical works design and documentation

consistent successful completion of the detailed geotechnical works design and documentation

INCLUDEPICTURE "/Users/harshitdhawan/Library/Group Containers/UBF8T346G9.ms/WebArchiveCopyPasteTempFiles/com.microsoft.Word/2Q==" * MERGEFORMATINET

You can use the attached template as a basis for the developed design, taking into account:

risk assessment and management requirement and procedures

occupational health and safety requirements and procedures

environmental management requirements and procedures

cultural and heritage requirements and procedures

quality management requirements and procedures

communication requirements and procedures

Australian and other relevant standards requirements and procedures

industry and organisational design procedures and practice

current industry best practice

geotechnical works options

geotechnical works geometric requirements

geotechnical works surfacing requirements

potential hazards, constraints and conditions that may affect geotechnical works design and construction

current industry best practice in geotechnical works design and construction

techniques for choosing preferred options

team leadership techniques

operational techniques required for the execution of geotechnical works construction tasks

geotechnical works plant and equipment capabilities

cost estimation techniques

design review principles and procedures

documentation requirements

reporting requirements and procedures

design approval requirements and procedures

design records filing requirements and procedures

performance review requirements and procedures

systems close out requirements and procedures

For the purposes of this assessment task, your Assessor will perform the role of the client and you must ensure that the client is briefed in the design along with being provided a written copy of the design.

GEOTHECHNICAL DESIGN1.SCOPE OFSERVICES1.1PROJECT BACKGROUND and general requirements

1.1.1Site Locality

The site is located

Attached site map

Chainage .km to Chainage km

GPS Co-ordinates

1.1.2Project Description

The proposed project includes the development/upgrade/rehabilitation/construction of the following elements:

Gravel pit resources

Upgrade and/or rehabilitation of an existing road alignment

Road pavement failure investigation .

Development of a new roadway/carriageway/easement/service corridor

A new bridge/major culvert at the river/creek

Building infrastructure, comprising a new school/health clinic/ and associated civil works

Headworks infrastructure upgrade

Subdivision and land servicing

The proposed budget for the project is funded from the Capital Works program, and is

The project is planned to be constructed during the months of. in 2020/2021$......

1.1.3Objectives of Geotechnical Investigation

Maybe appropriate to give background history on the Services being sought so the Tenderer has a better understanding of why and how the requirement arose/purpose of the requirement. Delete if not applicable

The general objectives of the geotechnical investigation is to provide the geological and geotechnical data and interpretations necessary for the rational, safe and economical design of the project, to provide data for the preparation of tender documents and for contractors to become informed of the ground conditions so that they will be able to safely and economically construct the project.

Sufficient geotechnical information should be gathered and interpreted to allow a designer to appreciate the limitations and opportunities that the site conditions present. As such, the investigations will be undertaken in the context of identifying geotechnical issues and risks, in order to mitigate them through the design and construction phases of the project.

1.1.4Scope of Services of Geotechnical Investigation

Detail the Service required, including any specific personnel requirements (if applicable). Where possible specify in terms of outcomes (describe the functional or performance requirements) rather than specify how it is to be done, etc.

NOTE: Any quantities required, and delivery/completion timeframes MUST be specified in the pricing Schedule and Annexure respectively and dont need to be repeated here.

The scope of the geotechnical investigation services comprises (delete as appropriate):

Part A Gravel and other material source investigations

Part B Existing and new road alignment investigations

Part C Bridge site and other stream crossing investigations

Part D Foundation investigations

Details of each part are included in the brief in the following sections.

1.1.5Delivery Timeframes

Amend the timeframes accordingly to suit project requirements

The geotechnical investigation services will be provided in accordance with the following timeframes.

Activity Cumulative Delivery Timeframe from Start of Commission

Field Work 4weeks

Laboratory Testing 8weeks

Draft Report 10weeks

Final Report 12weeks

1.1.6Traffic Management

Before starting any field works including survey, geotechnical investigations and potholing, prepare and submit Traffic Management Plans (TMP) consistent with the Provision of Traffic section in the Departments Standard Specification for Road Works.

1.1.7Standards, Guides and References

Austroads Guide to Road Design, Part 7, Geotechnical Investigation and Design

Geotechnical Site Investigations, Australian Standards AS1726

Methods of Testing Soils for Engineering Purposes, Australian Standards, AS1289 - various

Methods for Sampling and Testing aggregates, Australian Standards, AS1141.3.1-2012

Residential Slabs and Footings, Australian Standards, AS2870-2011

Bridge Design, Foundations, Australian Standards, AS5100.3-2004

Australasia 2016 Conference on Piling and Deep Foundations

Northern Territory Test Methods (NTTM), refer Department website for current versions.

Departments Standard Specification for Roadworks

1.1.8Utility Services

All services locations shall be obtained through Dial Before You Dig and verified by qualified service locators using GPR or potholing.

1.1.9Access to Land and Environmental Requirements

The consultant shall notify landowners of the intention to access their land irrespective of whether the land is freehold, leasehold or aboriginal land trust. Refer to the Department Environmental Management Specification, available on the website, for detailed requirements.

The consultant will endeavour to limit damage to flora and fauna while undertaking the investigation. All excavated pits will be reinstated and compacted by wheel/track rolling.

1.1.10Cultural Clearances and Approvals

Check with the Superintendents Representative on the status of clearances and approvals before mobilising for fieldwork.

The Principal will be responsible for obtaining approvals to undertake the work, including heritage and environmental, Aboriginal Areas Protection Authority (AAPA), and Land Council (if on Aboriginal land).

The Consultant is required to comply with cultural, heritage, environmental or other conditions determined by the AAPA and all other relevant authorities during field works. Avoid disturbance of all restricted work areas or sites of significance.

If any survey and /or investigation work is to be done on Aboriginal Land Trust land, the consultant is required to obtain Permits to Enter from the respective Land Council. The Consultant will need to obtain access permits from the relevant authorities for the purpose of site visits and investigations. Permits for access to Aboriginal Land will need to be obtained from the relevant Land Councils. Permits for access to parks will need to be obtained from the relevant park managing authority.

Relevant clearance and approval information is appended to this Brief.

1.1.11Liaison

Nominate a Project Officer who will be responsible for overall co-ordination and liaison on the project.

1.1.12Surveying

Survey the location of all boreholes, test holes etc in the field using appropriate methods, and show the locations on drawings included in the draft report. GPS co-ordinates (in northings and eastings) and RL shall be provided for all test pits, boreholes etc. Provide the datum used for these data.

1.1.13Excavation Hole Logging

Log all test pits using the Department's standard proforma logging sheets and comply with requirements of AS 1726. Complete all columns in the logging sheets. These sheets are intended to be used as a prompt; they are not exhaustive and do not necessarily cover all details needed. Each job will have its own requirements and the field operator will need to decide about the inclusion of additional data observed during the fieldwork. Final log sheets for the report shall be clean and written up clearly or typed. Moisture content profiles and other relevant tests shall be shown on the logs.

Ensure that all field notes, bore logs, photos, electronic data and drilling records are copied or downloaded daily as a backup for data security.

1.1.14Other Precautions In Carrying Out Work

Comply with all requirements under acts, ordinances, regulations, by-laws, orders and rules and other special requirements of proper Authorities concerning storage, transport and use of materials, plant, equipment; work processes and safety precautions.

Observe all rules and regulations in force in the area where the works are to be carried out.

Where any current Australian Standard published by Standards Australia is appropriate to storage, transport and use of materials, plant and equipment, to work processes or to safety precautions, the provisions of such standard shall be observed except if it conflicts with any statutory or special requirements of proper Authority in which case the latter shall apply.

In the absence of any such statutory or special requirements or relevant Australian Standard, ensure that suitable procedures are observed and all proper care is taken.

Take all necessary precautions to ensure that no fire hazard is created in carrying out the works.

1.2PART A GRAVEL AND OTHER MATERIAL Source INVESTIGATIONS

1.2.1Aims and Requirements

Conduct a gravel and material search investigation for proposed materials in specified areas to assess the quantity and quality of deposits available which are suitable for fill, subgrade and pavement construction.

Investigation areas have been identified by coordinates and suitable Goggle maps supplied (included as attachment). The consultant must not extend the investigation beyond these boundaries without written approval from the Superintendent.

Test pitting will not be undertaken closer than 125m of an existing roadway or 25m of a stream bank.

1.2.2Scope of Field investigations

The scope of field work to be carried out comprises:

Excavate test pits to establish stratigraphy of deposits, or shallower if practical refusal occur, by means of a backhoe or mini-excavator. Use of an auger isnotallowed due to possible damage to gravel particles and changes to soil characteristics. Test pits should be spaced on a grid of about 40m to 50m to cover the designated area. Smaller grid spacing can be used to better define deposit limits if required.

Log the soil profile (and weathered rock, if encountered) of each test pit to Australian Standards (AS 1726).

Record start and end chainages of insitu soil units

Record moisture content variations and groundwater encountered.

All depths are to be recorded in metres.

Photograph each test pit. Use a suitable scale for reference.

Record and provide GPS coordinates of all test pits.

Samples of appropriate mass must be taken to ensure an accurate assessment of the material types within the nominated area can be made. It is recommended that as a minimum samples should be taken from every second test pit. Samples should be taken from individual horizons as well as composite samples from the total depth of material considered suitable. All samples must be identified clearly with area number, test pit number and depth the sample was taken from (in metres).

1.2.3Laboratory Testing

Laboratory testing of samples will be undertaken in a NATA accredited laboratory and all test reports must be NATA endorsed. Samples must be tested for Particle Size Distribution, Atterberg Limits (wet preparation) Linear Shrinkage, and California Bearing Ratio (CBR) 4 days soaked. CBR testing shall be at 100% MMDD and 95% MMDD, using 4.5kg surcharge, for assessment for use as base, sub-base, subgrade and fill. Comply with the following standards:

AS 1289 Method of Testing Soils For Engineering Purposes

The consultant will discuss with the Department any additional testing considered necessary, such as stabilisation testing, blending, crushing, pre-treatment and the like, and seek approval from the Superintendent prior to undertaking such testing.

1.2.4Reporting (Provide either a factual report or an interpretative report)

Amend this section into one report if a consolidated report is required

.

Provide a Factual Report, including the following as a minimum:

Introduction, outlining scope and objectives

Site description and regional geological setting

Fieldwork methods and results including equipment used

Laboratory testing results

Map showing test pit locations

Appendices as required to present all photographs, mapping, logs, field testing and laboratory testing, GPS coordinates.

Provide an Interpretative Report, with discussion on the following:

Executive summary outlining all critical points of the investigations, including identification of risks and mitigation strategies;

Comments on the suitability of deposits and materials encountered, including quality and quantity (in table form) of each deposit for use as fill, subgrade and pavement layers;

Maps clearly showing test pits, deposit and materials depths, boundaries of potential deposits for pavement, subgrade and fill materials identified within the designated area; include cross-sections as appropriate to assist with push-up planning.

Discussion of any pre-treatment required of the material to produce suitable pavement materials including test results and field observations that support any recommendations;

Advise of potential problems or risks which may be experienced in the use of materials in the temporary and permanent works proposed, including discussion and recommendations on topsoil and vegetation removal requirements;

Recommendations appropriate to the identified aims and objectives of the investigation and supporting test data;

Other information considered relevant and obtained during the investigation.

Other report requirements:

The report will be issued in draft form to the Department for review and comment. Any comments from the review shall be addressed and incorporated into the final report.

Final report to be provided in electronic form as a pdf document.

Allow for meetings with the Department to discuss the findings and finalise the report.

Schedule of Rates T18-xxxx

Project: XxxxxXxxxx

Item Description** Unit Qty Rate

(incl. GST) Total Cost of Disbursements

(Incl. GST)

1 Mobilisation and de-mobilisation Unit 1 $ $

2. Accommodation Day

3. Dial Before You Dig Unit 1 $ $

4. Technicians all field work including sampling and logging. Hour $ $

5. Vehicle Km Rate $ $

6. Particle Size Distribution Test $ $

7. Atterberg Limits (Wet preparation) including Linear Shrinkage Test $ $

8. CBR (Including MMDD) Test $ $

9. Hire of excavator/backhoe Day $ $

10. Report Unit $ $

TOTAL AMOUNT Including GST $

** Add/delete items as required

1.3PART B EXISTING AND NEW ROAD ALIGNMENT INVESTIGATIONS

AAmend sample depths and spacing accordingly to suit project scope and requirements

1.3.1Aims and Requirements

Specific aims of the investigation are described below.

Investigate subsurface conditions along the existing road alignment.

Investigate subsurface conditions along a proposed new road alignment

Sample and test materials for suitability as construction materials.

In addition to the specific aims outlined in this brief, in carrying out the work the Consultant is required to use their experience and knowledge of the materials to advise of any potential geotechnical issues or problems which may be encountered in the temporary and permanent works proposed.

1.3.2Desk Top Study and Terrain Evaluation

Undertake a desk top study to collect, collate and review available information to inform the investigation and interpreted site and terrain conditions. Sources of information to be considered as part of the desk top study include:

Topographic maps

Aerial photographs, both contemporary and historic

Geological maps and associated commentaries

Soil and land suitability mapping

Groundwater mapping

Past site investigation reports for nearby sites

1.3.3Scope of Field Investigations

1.3.3.1General Requirements

The scope of field work to be carried out comprises:

Carry out site mapping to record relevant observations including, but not limited to:

oRock outcrops and exposures in cuttings

oSoil exposures in scrapes, pits, river banks, creek and stream channels, erosion gullies and the like.

oSlope movements

oGround subsidence and sinkholes

oSwampy low lying and poorly drained areas

oSurface cracking and gilgai topography

oVegetation changes

oGroundwater conditions including surface springs, seepage and soaks

Excavate test pits to target depths by a mechanical backhoe or mini-excavator. Auger drilling is not permitted. Minimise damage to flora and fauna.

Conduct Dynamic Cone Penetration (DCP) test from the surface at each test pit to target depth (or practical refusal). DCP refusal is defined as, when eight blows will cause a penetration of less than 20mm (AS1289.6.3.2 1997).

Any areas where there will be a road cutting, deeper test pits will be required to assess the subsurface materials for reuse and excavatability assessment. A larger machine may be required.

Record groundwater and moisture content observations.

Reinstate and backfill all test pits. Do not leave them open.

Log soil profiles, terrain and drainage to current Australian Standards. Maintain field log books.

Record start and finish chainages of insitu soil units and report.

Collect bulk disturbed samples appropriate for the stratigraphy, in particular, each pavement layer and soil type encountered. Collect sufficient sample mass to allow for appropriate laboratory testing.

Map/locate test pits and DCP locations with GPS coordinates in Northing and Easting. If a road chainage is available, record that also.

Photograph all test pit locations, equipment set-ups and terrain in the field. Provide digital images of those photographs in the report.

1.3.3.2Specific Requirements for Existing Sealed Pavement Investigations

Log road surface features, condition and pavement deformation and failure modes. Record drainage conditions and features.

Excavate test pits as follows:

oOn existing roads for widening, upgrade and rehabilitation projects, excavate test pits (also called potholing) generally in an outer wheel paths to a depth of1mbelow subgrade or shallower if refusal occurs, at150mintervals generally. Adapt spacing to capture terrain and soil units.

oFor investigations at localised project sites, such as intersections, pavement failures and the like, position test pits to gain suitable coverage of ground conditions.

Conduct Dynamic Cone Penetration (DCP) test from the top of subgrade of each test pit to 1.5m depth (or practical refusal).

Sealed pavement requirements:

oSaw cut the seal/asphalt prior to removal and dispose of off site.

oEnsure excavated material from the test pit is placed in such a way that pavement gravel is separate from any subgrade/fill.

oPrior to commencement of backfilling, cut any seal back to produce a clean edge level with the existing seal.

oCommence backfilling with excavated subgrade/fill material to top of subgrade level. Add water as required to assist with compaction and place in layers of 200mm loose maximum. Compact with a vertical rammer.

oPavement layers to be cement stabilised. Prior to placing in test pit, add water and cement to pavement material and mix thoroughly. Compact with a vertical rammer.

oLevel finished pavement surface and remove any loose gravel.

oBroom any loose material from sealed pavement.

oPlace cold mix evenly over the pavement and compact. Cold mix should be slightly domed in the centre to shed water.

1.3.3.3Specific Requirements for Upgrading Existing Unsealed Roads

Log road surface features, condition and pavement deformation modes. Record drainage conditions and features.

Excavate test pits as follows:

oOn existing unsealed roads for widening, upgrade to seal and larger scale pavement failure investigations, excavate pits generally in an outer wheel path to a depth of1mor shallower if refusal occurs, at250mintervals generally. Adapt spacing to reflect terrain and soil units.

Conduct Dynamic Cone Penetration (DCP) test from the surface at each test pit to 1.5m depth (or practical refusal).

Excavate test pits in the foundation material of the floodways, creeks and drainage lines to a target depth of 1.5 meters. Conduct DCP tests adjacent to each test pit to target depth of 1.5 meters (or practical refusal) to get parameters for foundation design.

Unsealed pavement test pit backfilling requirements:

oCommence backfilling with excavated subgrade/fill material to top of subgrade level. Add water as required to assist with compaction and place in layers of 200mm loose maximum. Compact with a vertical rammer.

oPavement layers do not require stabilisation. Prior to placing in test pit, add water to pavement material and mix thoroughly. Compact with a vertical rammer.

1.3.3.4Specific Requirements for New Road Alignments

Excavate test pits as follows:

oOn new road alignments, excavate pits generally on the proposed centreline, to a target depth of2mor shallower if refusal occurs, at250mintervals generally. Adapt spacing to reflect terrain and soil units.

Collect undisturbed samples of compressible materials for appropriate testing.

Collect Samples for Acid Sulphate Soil (ASS and PASS) as required.

Conduct Dynamic Cone Penetration (DCP) test from the surface at each test pit to 2.0m or practical refusal.

Excavate test pits in the foundation material of the creeks and drainage lines to a target depth of 2 meters.

All test pits to be backfilled and tamped in layers.

In areas of deep cut, generally greater than 3 to 4m, boreholes will be required to investigate soil and weathered rock profiles, including type, quality, and excavatability characteristics. Borehole drilling to be undertaken in accordance with Part D of this Brief.

1.3.4Laboratory Testing

Laboratory testing of samples will be undertaken in a NATA accredited laboratory and all test reports must be NATA endorsed. Comply with the following standards:

AS 1289 Method of Testing Soils For Engineering Purposes

Soil tests shall generally include:

Insitu moisture content (if required add to scope),

CBR test (4 days soaked) at 95%MMDD on each sample tested.

CBR test (4 days soaked) at 95%MMDD and 100%MMDDonlyon each pavement gravel sample tested.

Particle Size Distribution

Atterberg limits including linear shrinkage (Wet Preparation).

Other tests that may be required include consolidation testing, triaxial testing, and rock strength testing. Conform to Australian Standards for these tests.

Sample soil and groundwater at culverts for chemical testing to determine aggressivity to buried elements.

1.3.5Reporting (Provide either a factual report or an interpretative report)

[Amend this section into one report if a consolidated report is required]

Provide a Factual Report, including the following as a minimum:

Introduction, outlining scope and objectives

Site description and regional geological setting

Fieldwork methods and results including extents of natural surface soil units.

Laboratory testing results

Appendices as required to present all photographs, mapping, logs, field testing and laboratory testing.

Prepare suitable plans showing all test pit (and borehole) and DCP locations, giving all grid co-ordinates, and also show the chainages and offset distances as measured on site from the centreline of existing or proposed road

Appendices as required to present all photographs, mapping, logs, field testing and laboratory testing, GPS coordinates.

Provide an Interpretative Report, with discussion on the following:

Executive summary outlining all critical points of the investigations, including identification of risks and mitigation strategies

Completeness and reliability of the field and laboratory testing

For pavement failure investigations, advise of cause/s of failure and remedial options

Geotechnical model appropriate for the proposed project, including longitudinal sections, showing test pits, DCP data, correlations of pavement layers, groundwater, and laboratory test results

Interpreted rock, soil and groundwater profiles in cuttings

Batter slope requirements in proposed cuttings, including stabilisation requirements;

Excavatability issues for areas of cut and trenching excavations

Extent of topsoil and unsuitable ground, including soft and compressible soil profiles

Re-use potential of materials won from cuttings

Recommendations on design parameters, including, but not limited to;

oCBR values for supporting subgrade materials

oBatter slopes in cut and fill

oGeotechnical parameters for treatments of soft ground

Erosion control advice for cuttings and fill batters

Relevant construction methodologies

Geotechnical risks to be addressed by the designer

Other information considered relevant and obtained during the investigation;

Appendices as required to present all photographs, mapping, logs, field testing and laboratory testing, GPS coordinates.

Other report requirements:

The report will be issued in draft form to the Department for review and comment. Any comments from the review shall be addressed and incorporated into the final report.

Final report to be provided in electronic form as a pdf document.

Allow for meetings with the Department to discuss the findings and finalise the report.

Schedule of Rates T18-xxxx

Project: XxxxxXxxxx

Item Description** Unit Qty Rate

(incl. GST) Total Cost of Disbursements

(Incl. GST)

1 Mobilisation and de-mobilisation Unit 1 $ $

2 Traffic Management Plan and site traffic management including signs and VMS Unit 1 $ $

3. Services locator and Dial Before You Dig Unit 1 $ $

4. Technicians all field work including DCP testing, sampling, logging and reinstatement of test pit. Hour $ $

5. Vehicle Km Rate $ $

6. Particle Size Distribution Test $ $

7. Atterberg Limits (Wet preparation) including Linear Shrinkage Test $ $

8. CBR (Including MMDD) Test $ $

9. Moisture Content Test $ $

10. Hire of excavator, rammer Unit $ $

11. Report Unit $ $

TOTAL AMOUNT Including GST $

** Add/delete items as required

1.4PART C - BRIDGESITE AND OTHER STREAM CROSSING INVESTIGATIONS

Amend sample depths and spacing accordingly to suit project scope and requirements

1.4.1Aims and Requirements

Specific aims of the investigation are described below.

Investigate subsurface conditions at the proposed river/creek crossing

Provide geotechnical recommendations to enable design and construction of the bridge/culvert/crossing structure

In addition to the specific aims outlined in this brief, in carrying out the work the Consultant is required to use their experience and knowledge of the conditions encountered to advise of any potential problems which may be experienced in the design and construction of temporary and permanent works proposed.

1.4.2Desk Top Study

Undertake a desk top study to collect, collate and review available information to inform the investigation and interpreted site conditions. Sources of information to be considered as part of the desk top study include:

Topographic maps

Aerial photographs, both contemporary and historic

Geological maps and associated commentaries

Soil and land suitability mapping

Groundwater mapping

Past site investigation reports for nearby sites

1.4.3Scope of Field Investigations

1.4.3.1General Requirements

All fieldwork must be undertaken by an experienced professional geotechnical engineer or engineering geologist.

Carry out site mapping to record relevant observations including, but not limited to:

oRock outcrops and exposures, including cuttings

oSoil exposures and bed loads in channel areas

oSlope movements

oGround subsidence

oSwampy low lying and poorly drained areas

oVegetation as indicator of subsurface conditions

oGroundwater conditions including springs and soaks

oBank erosion characteristics

1.4.3.2Specific Requirements for Bridge Sites

Drill boreholes at each bridge site, targeting approaches, abutment and mid-crossing areas. Drill boreholes to target depths of about 20m (or deeper if conditions dictate). Commence coring when rock is encountered and continue until a significant distance of competent rock has been encountered. This depth will depend on conditions encountered in relation to the intended pile size and type, but is likely to be 6 pile diameters or 9m into distinctly weathered rock. Supervise drill rig operations full time in the field. Map the x and y location of boreholes and other relevant features with a GPS.

Record GPS co-ordinates and determine accurate relative level RL of all borehole locations.

Log drill returns and core returns according to best practice industry standards in the field. Execute SPT tests in overburden soils or completely weathered materials. Collect disturbed samples and SPT samples for laboratory tests.

Record groundwater levels, and collect samples for aggressivity testing.

Collect undisturbed samples at appropriate intervals, for laboratory tests including in-situ density, PSD, Atterberg limits, moisture content, consolidation testing and triaxial testing as appropriate.

Photograph all cores, the drilling set-ups, the existing crossings, ground conditions and terrain in the field. Provide images of those photographs in the report.

Excavate supplementary test pits along the proposed alignment to assist with developing the geotechnical model of the site. Log and sample the testpits according Departmental requirements in the Brief.

Undertake investigations required to determine extent of unsuitable ground in the vicinity of approach embankments.

1.4.3.3Specific Requirements for Stream Crossing Sites

Where borehole investigations are not required for culvert and causeway structures, conform to the following requirements:

Excavate test pits as follows:

oOn proposed alignments, excavate pits generally on the proposed centreline, to a target depth of2mor shallower if refusal occurs. Adapt spacing to reflect terrain and soil units, however, aim to excavate test pits in channel, bank and approach areas to characterise stratigraphy present at the crossing.

Conduct Dynamic Cone Penetration (DCP) test from the surface at each test pit to 2m depth (or practical refusal).

Sample rock exposures for index strength testing

Unsealed pavement test pit backfilling requirements:

oCommence backfilling with excavated subgrade/fill material to top of subgrade level. Add water as required to assist with compaction and place in layers of 200mm loose maximum. Compact with a vertical rammer.

oPavement layers do not require stabilisation. Prior to placing in test pit, add water to pavement material and mix thoroughly. Compact with a vertical rammer.

Undertake investigations required to determine extent of unsuitable ground in the vicinity of approach embankments and base slabs.

1.4.4Laboratory Testing

1.4.4.1Soil Testing

Carry out the following testing work on representative soil samples.:

insitu moisture content

PSD and

Atterberg limits (including linear shrinkage) (wet preparation).

If the Consultant determines that more tests are required to characterise the material types and mechanical properties, for example consolidation testing, the Consultant shall seek approval from the Department to do so, including the number of extra tests and any cost variation.

Sample soil and groundwater for chemical testing to determine aggressivity to buried elements.

1.4.4.2Rock Testing

Carry out the following testing work on recovered rock core samples:

Point load strength at 1m intervals

UCS testings at 3m intervals

1.4.5Reporting

[Amend this section into one report if a consolidated report is required]

Provide a Factual Report, including the following as a minimum:

Introduction, outlining scope and objectives

Site description and regional geological setting

Fieldwork methods and results

Laboratory testing results

Appendices as required to present all photographs, mapping, logs, field testing and laboratory testing.

Prepare suitable plans showing all borehole and testpit locations, giving all grid co-ordinates, and also show the chainages and offset distances as measured on site from the existing bridges.

Provide an Interpretative Report, with discussion on the following as a minimum:

Completeness and reliability of the field and laboratory testing

Prepare longitudinal sections showing sub-surface soil and rock profiles for each bridge/culvert/crossing site, showing boreholes and test pits and other exposure information. The sections shall represent distribution of sub-surface soil layers, SPT values, moisture content and ground water levels (if encountered), and classes of weathered rock. Include Point load strength testing data.

Geotechnical model appropriate for the proposed project, including a description of the engineering characteristics of the soils and rocks observed at the site.

Extent of topsoil and unsuitable ground, including soft and compressible soil profiles

Erosion control measures for temporary and permanent works.

Recommend basic design parameters and tolerances on those values for use by bridge and road design engineers for the strength, stability, and serviceability design of embankment, culvert, causeway and bridge structures.

Recommendations on pile and embankment design parameters, including, but not limited to;

oUltimate bearing pressures for pad footings, bored and driven piles as appropriate.

oShaft adhesion values for each soil and rock layer encountered, upwards and downwards.

oEstimates of embankment settlements

Discuss constructability constraints and methodologies (eg floating core stones, groundwater, collapsing ground, compressible soils, reactive clay profiles, variable depth to bedrock, strength reversal with depth etc).

Geotechnical risks to be addressed by the designer

Other information considered relevant and obtained during the investigation;

Other report requirements:

The report will be issued in draft form to the Department for review and comment. Any comments from the review shall be addressed and incorporated into the final report.

Final report to be provided in electronic form as a pdf document.

Allow for meetings with the Department to discuss the findings and finalise the report.

1.4.6General Requirements for Borehole Drilling

1.4.6.1Drilling

Diamond core drilling will be HQ size. Seek approval from the Superintendent for other sizes. Determine the best drilling methods. Obtain greater than 90% core recovery, preferably 100%. Inform the Superintendent immediately if high core recovery is not being achieved.

Boreholes shall be drilled in any order specified by the Superintendent but the Superintendent will endeavour to organise the drilling program to minimise the time taken in setting up. The Superintendent may also specify the drilling of additional boreholes at any time.

Inform the Superintendent immediately if any holes are offset from the required location because of access problems, underground services or errors.

1.4.6.2Ground Water Level

Measure the ground water level in sands at least 30 minutes after boring and in silts and clays at least 24 hrs after boring. Where casing is used, measure the ground water level before and after pulling the casing.

1.4.6.3Drilling, Sampling And Testing In Overburden

Description of Materials

The following properties of overburden materials shall be recorded:

Material type (texture), according to particle size distribution

Colour

Consistency/density

Moisture Content

1.4.6.4SPT Testing

Conduct SPT testing in soils at nominal intervals of 1.0m or as directed by the Superintendent. SPT results should be corrected for rod length, overburden pressure, etc. as necessary. Extreme care should be taken to ensure that SPT testing is conducted in undisturbed soil. If appropriate, seal part of the sample for moisture content testing. PSD and Atterberg testing shall be determined at a number of locations down the profile, particularly where SPT tests are conducted. Moisture content shall be determined at all SPT test depths.

All samples submitted shall be adequately identified as specified in AS 1726.

Store all samples in a suitable cool, shaded location after logging, sealing and labelling.

1.4.6.5Disturbed Samples

The cost of recovering such samples will be calculated based on time spent in recovering such samples and will be paid at the working hourly rate.

Materials strained from the drilling fluid and any material recovered from the drill rods or drilling bit will not be accepted as a representative sample.

1.4.6.6Undisturbed Samples

At nominal intervals, or as directed by the Superintendent, an undisturbed sample shall be recovered in cohesive materials, using a "thin wall" open drive or piston sampler, as appropriate. The area ratio of the sampler should not exceed 10% (as specified in AS1726), or close to it. Ensure the diameter of the recovered sample is not less than 50mm.

All samples submitted shall be adequately identified as specified in Australian Standards. After logging, sealing and labelling, samples shall be stored in a suitable cool, shaded location.

1.4.6.7Vane Shear Test

When requested by the Superintendent, in situ vane shear tests shall be carried out in accordance with the requirements of Australian standards.

1.4.6.8Depth of Drilling

Deeper drilling is required if large core stones are suspected, to prove that solid bedrock has been encountered.

1.4.6.9Description of Materials

Logging is to be carried out prior to sampling and testing. Describe in accordance with AS 1726. Use the following classification groups, as a minimum:

Nature (ie. bedrock, boulders, etc);

Group;

Degree of weathering;

Rock strength;

Spacing and type of discontinuities and fractures.

Dip of bedding, fractures and features, fracture filling and plane irregularity;

Sample type;

Core recovery, %

Rock Quality Designation;

Comments.

1.4.6.10Rock Cores

Sampling and Testing

To preserve rock core for viewing, where required, core shall be wrapped in plastic or sprayed with a lacquer to preserve it in the as recovered condition.

Conduct UCS testing of rock in the 50% humidity conditioned state or a saturated condition or both. Do not allow samples to dry out before testing. Conduct point load index testing (PLIT) in both P&N directions and determine the anistrophy of the rock. Conduct UCS and PLIT and determine a correlation between PLI and UCS, if possible.

Core Photography

Photograph all cores in the core trays in the field during drilling while wet, before sampling. Particular attention shall be paid to core photography to ensure high quality photos result. Clean down the cores before photography, and should be wet when it is photographed. The core should take up the whole area of the photograph. Photos to be dated. Close up shots of important features should be provided, as well as photography in the splits.

Core Storage

All recovered core shall be carefully boxed using metal core boxes 400 mm wide x 1000 mm long.

If core recovery is less than 100% or where cores have been removed for inspection and testing, polystyrene spacers equal in length to the core loss shall be placed in the appropriate position in the box. Details, such as removed for UCS testing or core loss, shall be recorded on the polystyrene.

Ensure the core is not damaged during transit. Store core boxes in a safe cool location.

Core trays should be labelled with project name, borehole, drill run and depth, and date.

ITEM DESCRIPTION ** EST QTY UNIT PRICE(including GST) EXTENDED AMOUNT(including GST)

1 Supervision, Logging of all Boreholes, sampling for laboratory testing, by a Senior Geotechnical Engineer Hrs 100 $ $

2 Establishment of Contractor and consultant including all equipment, suitable Barge and drilling rigs on site with full accomodation, mobilisation and de-mobilisation on completion of the investigation Lump Sum 1 $$

3 SPT Testing (6 minimum in each borehole)- Provisional if ordered by superintendent No. 48 $ $

4 Core boxes and accessories for Eight boreholes No. 16 $ $

5 Rotary Drilling and casing m 80 $ $

6 Water carting for drilling Lump Sum 1 $ $

7 Drilling Fluid Lump Sum 1 $ $

8 Point load test(2 per hole) - Provisional if ordered by superintendent No 16 $ $

9 Piston/Tubex sampling for Triaxial for Undisturbed samples minimum 2 per hole No 16 $ $

10 Triaxial undrained testing- Provisional if ordered by superintendent No 4 $ $

11 Atterbergs limits including Linear shrinkage, Particle Size Distribution, Moisture Content- Provisional if ordered by superintendent No 8 $ $

12 Aggressivity test to soil- Provisional if ordered by superintendent no 2 $ $

13 aggressivity test to surface water (2 Nos) and groundwater (2 Nos) - Provisional if ordered by superintendent no 4 $ $

14 Form drilling Platform and access track Lump Sum 1 $ $

15 Preparation and review of report by a senior geotechnical engineer hrs 40 $ $

16 Final Geotechnical Investigation report

(2 HARD COPIES AND electronic format) Lump Sum 1 $ $

SCHEDULE OFRATES (DRILLING)

NOTE: Any item that is GST free, please provide details

Total

** Add/delete items as necessary

1.5PART D BUILDING INFRASTRUCTURE FOUNDATION INVESTIGATIONS

What

happens if your result is Not Yet Competent for one or more assessment tasks?

The

assessment process is designed to answer the question has the participant

satisfactorily demonstrated competence yet? If the answer is Not yet, then

we work with you to see how we can get there.

In

the case that one or more of your assessments has been marked NYC, your Trainer

will provide you with the necessary feedback and guidance, in order for you to

resubmit/redo your assessment task(s).

What if

you disagree on the assessment outcome?

You

can appeal against a decision made in regards to an assessment of your

competency. An appeal should only be

made if you have been assessed as Not Yet Competent against specific

competency standards and you feel you have sufficient grounds to believe that

you are entitled to be assessed as competent.

You

must be able to adequately demonstrate that you have the skills and experience

to be able to meet the requirements of the unit you are appealing against the

assessment of.

You

can request a form to make an appeal and submit it to your Trainer, the Course

Coordinator, or an Administration Officer. The RTO will examine the appeal and

you will be advised of the outcome within 14 days. Any additional information

you wish to provide may be attached to the form.

What if

I believe I am already competent before training?

If

you believe you already have the knowledge and skills to be able to demonstrate

competence in this unit, speak with your Trainer, as you may be able to apply

for Recognition of Prior Learning (RPL).

Credit Transfer

Credit

transfer is recognition for study you have already completed. To receive Credit

Transfer, you must be enrolled in the relevant program. Credit Transfer can be

granted if you provide the RTO with certified copies of your qualifications, a

Statement of Attainment or a Statement of Results along with Credit Transfer

Application Form. (For further information please visit Credit Transfer Policy)

  • Uploaded By : Pooja Dhaka
  • Posted on : November 13th, 2024
  • Downloads : 0
  • Views : 157

Download Solution Now

Can't find what you're looking for?

Whatsapp Tap to ChatGet instant assistance

Choose a Plan

Premium

80 USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 50 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

20 USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more