Design and Construction Practice
- Subject Code :
TFA1016
Suggested Structure
Top sheet
- Introduction
- Analyse the design-construction interface requirements
- Identify information needs for statutory approvals and narrate the process
- Propose a preliminary construction method statement using the chosen materials & technology
- Critical appraisal of application of principles of Lean Construction in this project
- Conclusion
- References
This is an individual project report with 4,600 Words (Equivalent Word Count) as the limit.Refer to the additional guidelines on preparation of the report in the following pages.
Top Sheet
Module Code & Title: TFA1016 Design and Construction Practice
Assessment ID: Assessment 3 - Project Work 2
- Background Information
Briefly present the context of the project covering below items (not more than 500 words):
- Client requirements (highlight priorities of the client)
- Infographics showing the details of the final design (all in scale)
- Floor plans (with doors, windows, furniture, and dimensions)
- Site plan
- Typical section
- Typical elevation
- Analyse the design-construction interface requirements
- Demonstrate Measurements by calculating areas of spaces and present area statement, relate to clients requirements
- Project budget: provide revised estimates based on the final design and explain how it fits in the clients budget
- Discuss and suggest appropriate site investigations & land surveying requirements for your project
- Identify information needs for statutory approvals and narrate the process
Based on the learning in the module concerning laws & regulations, outline the approval process for planning permission and building control approval to execute your project.
Specifically, the information requirements for applying for planning permission and building control approval.
- Propose a preliminary construction method statement using the chosen materials & technology
- Suggest & justify suitable materials of construction and technology (construction equipment) that could be used to build the critical components
- Demonstrate for at least six critical components two each from structural system, services & finishes
- Describe the possible process to follow in putting together various critical components (foundation, structure, roof, walls, etc.) of your building with the help of infographics
- Suggest a preliminary site layout plan for this project and discuss the role of logistics planning
Critical appraisal of application of principles of Lean Construction in this project
- Provide a narrative on Lean Construction and discuss its application in your house project
- You may suggest the use of some lean tools & techniques in this project and their benefits
- What could be the barriers for implementing Lean Construction in this project?
- Conclusion
- Discuss how your proposed design & planning will meet the clients requirements
- References
- You are advised to refer to reliable sources of information using APA7 style.
- You must cite and provide credentials to the original authors for their work if you use them in your report.
- Both in-text citation and full citation in this section is mandatory and must be in APA7 style.
- Refer to library resources on referencing at https://library.hud.ac.uk/pages/apareferencing/