7411ENGProject 1 - Water Treatment Plant Design Project

As an individual or group you are to make a draft plan based on the following scenario and guidelines.

Assume a new settlement is starting afresh with 5,000 new settlers in a place of your choice. The population growth is estimated to be 5% on average in the first 10 years and then declines and stabilises at 2 % in Year 15. A modern drinking water supply system needs to be installed. You are the chief engineer to lead the designing project for this water treatment plant. Following the Guidelines below, you are required to make a draft plan for this critical piece of infrastructure of this new town.

State the principles you apply in your designs; (5%)

Enlist all the assumptions; (10%)

Estimate the required plant treatment capacity for the next 20 years; (15%)

Sets the drinking water quality target and the analytical procedures; (15%)

Lay out the flow sheet of the process and justify your choice based on the characteristics of the source water (note: if data not available, you can make your estimations based on other similar sites or common sense); (15%)

Estimate the key parameters in the water treatment process including daily flow rate, detention time, geometry and dimension of the sedimentation tank, how many filters and frequency of backwashing if filtration is required, the required amount of chlorine if chlorination is the chosen. (40%)

More Information

Your report should address the questions above. You can adopt either a narrative style or point-by-point style. The marking criterion is focused on the quality of your answers;

Key steps for working out process parameters should be provided in the main body of the report. Detailed calculations can be collected in the Appendix.

Harvard referencing style.

Reports examples from the past years can be found below:

Water Treatment Plant Design Report 1.pdfWater Treatment Plant Design Report 2.pdfWater Treatment Plant Design Report 3.pdfCapalaba_Water_Treatment_Plant.pdf

  • Uploaded By : Pooja Dhaka
  • Posted on : January 04th, 2025
  • Downloads : 0
  • Views : 170

Download Solution Now

Can't find what you're looking for?

Whatsapp Tap to ChatGet instant assistance

Choose a Plan

Premium

80 USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 50 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

20 USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more